MONTHYEARML20205G8771999-03-26026 March 1999 Forwards Copy of Cover Page from Fort St-Vrain Welding Manual,Which Had Been Listed as Encl on Page 4 of 990325 Reply to EA 98-081.Cover Page Had Been Inadvertently Left Out with Original Reply ML20197H8811998-12-0101 December 1998 Forwards Proposed Change to Fsv ISFSI Physical Protection Plan in Which Commitment Is Made to Provide Feature to Security Posture for Facility ML20236R9191998-07-20020 July 1998 Ltr Contract:Mod 4 to Task Order 27, Task Area No 4 of Basic Contract - Fort St Vrain Insp Under Contract NRC-02-95-003 ML20199H8141997-11-21021 November 1997 Responds to Requesting Clarification as to Whether Increase in Tritium & Iron-55 Contamination Limits That Were Approved for Plant Apply to All Licensees ML20198K1931997-10-10010 October 1997 Provides Supplemental Info in Support of Util Proposed Rev to Physical Security Plan for Plant Plant Isfsi.Plan Withheld,Per 10CFR2.790(d) & 10CFR73.21 ML20198H5601997-09-16016 September 1997 Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20141F3521997-05-14014 May 1997 Forwards Proposed Issue 4 of Physical Security Plan for Fort St Vrain ISFSI for Review & Approval.Encl Withheld,Per 10CFR2.790(d) ML20141C8611997-05-0909 May 1997 Informs of Approval of Fsv Final Survey Rept & Effluent Pathway Survey Plan & Supporting Analysis ML20141K9881997-05-0505 May 1997 Forwards Amend 89 to License DPR-34 & Supporting Safety Evaluation.Amend Designates All Elements of Approved Decommissioning Plan as License Termination Plan ML20138G2701997-04-28028 April 1997 Provides Response to NRC Comments Re Proposed Sampling & Survey Plan for Fsv Effluent Pathway.Response Documents Fsv Liquid Effluent Discharge Pathway Areas Are Acceptable for Release for Unrestricted Use IAW Draft NUREG/CR-5849 ML20148D4651997-04-24024 April 1997 Forwards Revised Interim Ltr Rept Which Describes Procedures & Results of Confirmatory Survey of Group E Effluent Discharge Pathway Areas at Fsv Station NUREG/CR-5849, Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-58491997-04-23023 April 1997 Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-5849 ML20138B0511997-04-22022 April 1997 Forwards Copy of Proposed Amend to Fsv NPDES Permit, Wastewater Discharge Permit CO-0001121 Requested to Support Repowering Activities,Iaw Section 3.2.d of Fsv Non-Radiological Ts,App B to License DPR-34 ML20140E1061997-04-10010 April 1997 Forwards Confirmatory Survey of Group Effluent Discharge Pathway Areas for Fsv Nuclear Station,Platteville,Co ML20137S4481997-04-0808 April 1997 Informs That Decommissioning Activities at Fsv Are Complete & NRC Issued Exemption from Requirements of 10CFR50.54(w) in .Property Damage Insurance Policy Is Maintaned to Protect Fsv balance-of-plant Assets ML20137S0821997-04-0707 April 1997 Forwards Insp Rept 50-267/97-01 on 970310-11.No Violations Noted ML20137S1691997-04-0707 April 1997 Fifth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App K ML20137S5421997-04-0707 April 1997 Forwards Final Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Fort St Vrain Nuclear Station ML20148D5951997-04-0404 April 1997 Forwards Confirmatory Survey for Fsv Nuclear Station, Psc,Platteville,Co, Final Rept ML20137R6921997-04-0404 April 1997 Informs of Approval for Request for Addl 45 Days to Remedy Deficiencies Identified in NRC Re Financial Assurance Mechanism for Fsv Decommissioning Costs ML20137J8051997-03-31031 March 1997 Third Partial Response to FOIA Request for Documents.Records in App F Encl & Will Be Available in Pdr.App G & H Records Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20148D5811997-03-26026 March 1997 Forwards Confirmatory Survey Plan for Group E Effluent Discharge Pathway Areas at Fsv Nuclear Station, Covered in Final Survey Rept,Vol 6 ML20137G7361997-03-25025 March 1997 Requests Addl Time for Util to Respond to NRC Comments in Re Financial Assurance Mechanism for Fort St Vrain Decommissioning Costs ML20137G9521997-03-24024 March 1997 Forwards Quarterly 10CFR50.59 Rept for Period 961201-970228 Re Changes,Tests & Experiments for Fort St Vrain Decommissioning ML20137H1131997-03-24024 March 1997 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App D.Documents Also Available in Pdr.Documents Listed in App E Withheld in Part (Ref FOIA Exemption 6) ML20137C0181997-03-18018 March 1997 Documents That No Personnel Has Received Radiation Exposure at Fsv in 1997 or at Any Time Subsequent to ML20137C0061997-03-18018 March 1997 Documents That There Have Been No Activities Involving Release of Radioactive Matls from Fsv Nuclear Station That Potentially Could Have Affected Environ,Subsequent to Previous Radiological Envion Operating Rept ML20136G1201997-03-11011 March 1997 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1996 & Jan-Mar 1997. All Effluent Releases Completed as of 960703.Repts on Activities After 960703 Reflect Disposal of Solid Waste ML20136B1331997-02-28028 February 1997 First Partial Response to FOIA Request for Documents. Documents Listed in App a Already Available in Pdr.Forwards App B Documents.App C Documents Being Withheld in Entirety (Ref FOIA Exemption 5) ML20135D7891997-02-27027 February 1997 Forwards Responses to Comments Re Fort St Vrain Final Survey Rept ML20135D9531997-02-27027 February 1997 Forwards Copy of Amend to Util Npdes,Wastewater Discharge Permit CO-0001121,which Clarifies That Monitoring of Farm Pond Outlet Required When Industrial Wastewater Being Discharged Through Upstream Goosequill Ditch ML20135A8711997-02-14014 February 1997 Requests That Encl Deficiencies Identified in Financial Assurance Mechanism for Fort St Vrain Decommissioning Cost Be Addressed within 45 Days ML20134D1551997-01-31031 January 1997 Forwards Util Responses to NRC Comments Provided in NRC Ltr Re Sampling & Survey Plan Used for Final Radiological Survey of Liquid Effluent Pathway at Ft St Vrain ML20134C8481997-01-30030 January 1997 Forwards Draft Confirmatory Survey Rept for Fsv Nuclear Station,Psc,Platteville,Co Providing Info on Essap Activities on 960930-1003 ML20133L4961997-01-0707 January 1997 Forwards Comments That Need to Be Resolved Before Final Approval of Util Submittal Entitled, Proposed Sampling & Survey Plan for Effluent Pathway,Ft St Vrain Final Survey Program ML20133E0481997-01-0202 January 1997 Forwards Comments to Fsv Nuclear Station, Decommissioning Project Final Survey Rept (Volumes 4-11), for Consideration ML20132G0421996-12-23023 December 1996 Forwards Insp Rept 50-267/96-05 on 961203-05.No Violations Noted ML20132F2841996-12-19019 December 1996 Forwards Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Plant,Covering Period of 960901-1130 ML20133A8591996-12-16016 December 1996 Forwards Original & Copy Transcripts of Public Hearing,Held on 961203 in Platteville,Co Re Decommissioning & License Termination of Util Ft Saint Vrain Nuclear Generating Station ML20133N0011996-12-0404 December 1996 Recommends That NRC Require License to Modify Submission of Unexecuted Draft Trust Agreement Remaining Decommissioning Costs for Ft St Vrain Nuclear Generating Station in Listed Ways ML20135B3861996-11-25025 November 1996 Informs That NRC Reviewed Util 961114 Submittal (P-96096) Entitled, Fort St Vrain Final Emergency Response Plan, & Meets Requirements of 10CFR50.54(q) ML20135A5861996-11-25025 November 1996 Submits Suppl Info Re Annual Environ Rept for 1995 Operation of Fsv ISFSI ML20135A6361996-11-20020 November 1996 Submits Copy of Describing Discharge Practices for Groundwater Seeping Into Fsv'S Reactor Building Sump ML20134L4721996-11-14014 November 1996 Notifies NRC That Util Adopted Fsv ISFSI Emergency Response Plan to Direct Emergency Response for Radiological Accidents Occuring at Site,Until 10CFR50 License Is Terminated ML20134F4351996-10-30030 October 1996 Forwards Sections 1,2,6 & 8 from Survey Packages F0015, F0039 & F0126 & Sections 1,2 & 6 from Survey Package F0115 to Support on-site NRC Insp ML20134G5991996-10-30030 October 1996 Forwards Volumes 1-12 to Final Survey Rept for Groups A,B,C Rev 1,D Rev 1,E,F Rev 1 & G-J for NRC Approval in Support of Forthcoming Request for Termination of Fsv 10CFR50 License ML20133D7691996-10-22022 October 1996 Forwards Preliminary Rept Re Orise Support of NRC License Insp at Fsv on 960930-1003 ML20136B1411996-10-15015 October 1996 FOIA Request for Documents Re NOV Addressed to Scientific Ecology Group Re NRC Insp Rept 50-267/94-03 & OI Investigation Repts 4-94-010 & 4-95-015 ML20128M6181996-10-0404 October 1996 Forwards Ltr from PSC to Co Dept of Public Health & Environ Describing Monitoring Practices at Plant ML20128G8041996-10-0101 October 1996 Forwards Fsv Decommissioning Fire Protection Plan Update 1999-03-26
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20205G8771999-03-26026 March 1999 Forwards Copy of Cover Page from Fort St-Vrain Welding Manual,Which Had Been Listed as Encl on Page 4 of 990325 Reply to EA 98-081.Cover Page Had Been Inadvertently Left Out with Original Reply ML20197H8811998-12-0101 December 1998 Forwards Proposed Change to Fsv ISFSI Physical Protection Plan in Which Commitment Is Made to Provide Feature to Security Posture for Facility ML20198K1931997-10-10010 October 1997 Provides Supplemental Info in Support of Util Proposed Rev to Physical Security Plan for Plant Plant Isfsi.Plan Withheld,Per 10CFR2.790(d) & 10CFR73.21 ML20141F3521997-05-14014 May 1997 Forwards Proposed Issue 4 of Physical Security Plan for Fort St Vrain ISFSI for Review & Approval.Encl Withheld,Per 10CFR2.790(d) ML20138G2701997-04-28028 April 1997 Provides Response to NRC Comments Re Proposed Sampling & Survey Plan for Fsv Effluent Pathway.Response Documents Fsv Liquid Effluent Discharge Pathway Areas Are Acceptable for Release for Unrestricted Use IAW Draft NUREG/CR-5849 ML20148D4651997-04-24024 April 1997 Forwards Revised Interim Ltr Rept Which Describes Procedures & Results of Confirmatory Survey of Group E Effluent Discharge Pathway Areas at Fsv Station ML20138B0511997-04-22022 April 1997 Forwards Copy of Proposed Amend to Fsv NPDES Permit, Wastewater Discharge Permit CO-0001121 Requested to Support Repowering Activities,Iaw Section 3.2.d of Fsv Non-Radiological Ts,App B to License DPR-34 ML20140E1061997-04-10010 April 1997 Forwards Confirmatory Survey of Group Effluent Discharge Pathway Areas for Fsv Nuclear Station,Platteville,Co ML20137S4481997-04-0808 April 1997 Informs That Decommissioning Activities at Fsv Are Complete & NRC Issued Exemption from Requirements of 10CFR50.54(w) in .Property Damage Insurance Policy Is Maintaned to Protect Fsv balance-of-plant Assets ML20137S5421997-04-0707 April 1997 Forwards Final Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Fort St Vrain Nuclear Station ML20148D5951997-04-0404 April 1997 Forwards Confirmatory Survey for Fsv Nuclear Station, Psc,Platteville,Co, Final Rept ML20148D5811997-03-26026 March 1997 Forwards Confirmatory Survey Plan for Group E Effluent Discharge Pathway Areas at Fsv Nuclear Station, Covered in Final Survey Rept,Vol 6 ML20137G7361997-03-25025 March 1997 Requests Addl Time for Util to Respond to NRC Comments in Re Financial Assurance Mechanism for Fort St Vrain Decommissioning Costs ML20137G9521997-03-24024 March 1997 Forwards Quarterly 10CFR50.59 Rept for Period 961201-970228 Re Changes,Tests & Experiments for Fort St Vrain Decommissioning ML20137C0061997-03-18018 March 1997 Documents That There Have Been No Activities Involving Release of Radioactive Matls from Fsv Nuclear Station That Potentially Could Have Affected Environ,Subsequent to Previous Radiological Envion Operating Rept ML20137C0181997-03-18018 March 1997 Documents That No Personnel Has Received Radiation Exposure at Fsv in 1997 or at Any Time Subsequent to ML20136G1201997-03-11011 March 1997 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1996 & Jan-Mar 1997. All Effluent Releases Completed as of 960703.Repts on Activities After 960703 Reflect Disposal of Solid Waste ML20135D7891997-02-27027 February 1997 Forwards Responses to Comments Re Fort St Vrain Final Survey Rept ML20135D9531997-02-27027 February 1997 Forwards Copy of Amend to Util Npdes,Wastewater Discharge Permit CO-0001121,which Clarifies That Monitoring of Farm Pond Outlet Required When Industrial Wastewater Being Discharged Through Upstream Goosequill Ditch ML20134D1551997-01-31031 January 1997 Forwards Util Responses to NRC Comments Provided in NRC Ltr Re Sampling & Survey Plan Used for Final Radiological Survey of Liquid Effluent Pathway at Ft St Vrain ML20134C8481997-01-30030 January 1997 Forwards Draft Confirmatory Survey Rept for Fsv Nuclear Station,Psc,Platteville,Co Providing Info on Essap Activities on 960930-1003 ML20133E0481997-01-0202 January 1997 Forwards Comments to Fsv Nuclear Station, Decommissioning Project Final Survey Rept (Volumes 4-11), for Consideration ML20132F2841996-12-19019 December 1996 Forwards Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Plant,Covering Period of 960901-1130 ML20133A8591996-12-16016 December 1996 Forwards Original & Copy Transcripts of Public Hearing,Held on 961203 in Platteville,Co Re Decommissioning & License Termination of Util Ft Saint Vrain Nuclear Generating Station ML20133N0011996-12-0404 December 1996 Recommends That NRC Require License to Modify Submission of Unexecuted Draft Trust Agreement Remaining Decommissioning Costs for Ft St Vrain Nuclear Generating Station in Listed Ways ML20135A5861996-11-25025 November 1996 Submits Suppl Info Re Annual Environ Rept for 1995 Operation of Fsv ISFSI ML20135A6361996-11-20020 November 1996 Submits Copy of Describing Discharge Practices for Groundwater Seeping Into Fsv'S Reactor Building Sump ML20134L4721996-11-14014 November 1996 Notifies NRC That Util Adopted Fsv ISFSI Emergency Response Plan to Direct Emergency Response for Radiological Accidents Occuring at Site,Until 10CFR50 License Is Terminated ML20134F4351996-10-30030 October 1996 Forwards Sections 1,2,6 & 8 from Survey Packages F0015, F0039 & F0126 & Sections 1,2 & 6 from Survey Package F0115 to Support on-site NRC Insp ML20134G5991996-10-30030 October 1996 Forwards Volumes 1-12 to Final Survey Rept for Groups A,B,C Rev 1,D Rev 1,E,F Rev 1 & G-J for NRC Approval in Support of Forthcoming Request for Termination of Fsv 10CFR50 License ML20133D7691996-10-22022 October 1996 Forwards Preliminary Rept Re Orise Support of NRC License Insp at Fsv on 960930-1003 ML20136B1411996-10-15015 October 1996 FOIA Request for Documents Re NOV Addressed to Scientific Ecology Group Re NRC Insp Rept 50-267/94-03 & OI Investigation Repts 4-94-010 & 4-95-015 ML20128M6181996-10-0404 October 1996 Forwards Ltr from PSC to Co Dept of Public Health & Environ Describing Monitoring Practices at Plant ML20128G8041996-10-0101 October 1996 Forwards Fsv Decommissioning Fire Protection Plan Update ML20128G0481996-09-30030 September 1996 Submits Rev to Psco Definitions of Contents of Documentation Packages Re Fsv Final Survey Project ML20129C0421996-09-20020 September 1996 Forwards Quarterly Submittal of 10CFR50.59 Rept of Changes, Tests & Experiments for Facility Decommissioning,Covering Period of 960601-0831 ML20133D7601996-09-16016 September 1996 Forwards Confirmatory Survey Plan for Fsv Nuclear Station Decommissioning Project,First Final Survey Rept Submittal- Vols 1-5.NRC Comments Incorporated.Spending Plan Attached ML20117P0711996-09-13013 September 1996 Describes Util Plans to Remove Bldg 28 from Plant Facility ML20129A4431996-09-11011 September 1996 Describes Util Plans for Demonstrating That Liquid Effluent Pathway & Surrounding Open Land Areas Satisfy 10 Mrem/Yr Criteria Provided in Plant Final Survey Plan ML20117K5291996-09-0404 September 1996 Provides Notification That Util Will Be Revising Financial Assurance Mechanism That Will Be Used to Cover Remaining Costs of Decommissioning Plant ML20117C7281996-08-22022 August 1996 Discusses Impact of Final Decommissioning Rule & Requests NRC Concurrence That Requirements to Submit & Obtain Approval of License Termination Plan Have Been Satisfied ML20116P3431996-08-16016 August 1996 Describes Actions to Remove Structures & Equipment Items from Fort St Vrain Facility for NRC Info.Requests That NRC Advise Util of Wishes to Perform Confirmatory Survey of Any Parts of New Fuel Storage Building Before 960903 ML20133D7551996-08-14014 August 1996 Provides Environ Survey & Site Assessment Program'S (Essap) Comments Re Review of Fsv Nuclear Station Decommissioning Project Final Survey Rept ML20116M0771996-08-14014 August 1996 Provides Suppl Response to Re Insp Rept 50-267/96-01 in Jan 1996 Re NRC Concerns About Fsv Final Survey Program.Specifically,Bias in Instrumentation Response Overestimating Amount of Contamination Present ML20116M1841996-08-13013 August 1996 Forwards Util Responses to NRC Comments in Re Use of in-situ Gamma Spectroscopy to Measure Exposure Rates During Plant Final Survey.Approval to Use in-situ Gamma Spectroscopic instrument,Microspec-2,requested ML20116K0061996-08-0909 August 1996 Submits Fort St Vrain Nuclear Station Decommissioning Project Final Survey Rept ML20116M1241996-08-0808 August 1996 Responds to NRC Bulletin 96-004, Chemical,Galvanic,Or Other Reactions in Spent Fuel Storage & Transportation. Informs That Modular Vault Dry Storage Sys Is Not Susceptible to Problems Addressed in Bulletin ML20116F3611996-08-0202 August 1996 Submits Revised Documentation for Fort St Vrain Final Survey Program ML20116F8141996-08-0202 August 1996 Informs of Util Intent to Modify Fort St Vrain Control Room,Which Will Make Certain Final Survey Locations Unavailable for Further Review.Final Survey Efforts Are Complete ML20116A4511996-07-19019 July 1996 Requests NRC Approval of Proposed Method to Fsv Final Survey Plan to Determine Exposure Rates in Prestressed Concrete Reactor Vessel 1999-03-26
[Table view] |
Text
. . _ . _ _ ___ . _ . . ___ _ . _ .
..s v
[n May 20, 1993 ff .
Note to: M e Lieberman, OE j ,N '
Jack Goldberg, OGC Len Williamson, OI wU d V' 3
{Ff
Subject:
Public Service Company of Colorado (EA 92-152) W' L I-am providing you an unexpurgated copy of the settlement agreement between McTiernan and the company and a copy of some information that we requested thr_
company provide us during the enforcement conference.
With regard to the settlement agreement, we had previously seen only a redacted version of it. This copy was provided by the Secretary of. Labor's office.
We are scheduled to discuss this case at 9:30 a.m. CDT on Monday, June'7. You ;
should have received .a copy of the transcript of the enforcement conference. ;
Let me know if you can think of any other information that you need to support our discussions or to reach an enforcement decision.
b Gary Sa bhn V .
, t l
l
'I I
(,/
/
9412080090 931202 Q, PDR FOIA
'/7 O'MALLE93-600 PDR
t f8T Op FAX T[4e, (Te TRANSMITTAL COVER SHEET q WASHINGTON, D.C. 20210 g,
g FAX NO. (282) 239315 c 1g "
(
'A $N DATE:G/9-9 6 NO. OF PAGES: A
% v D D 4TES of -
OFFICE OF ADMINISTRATIVE APPEALS '
..j TO: NAME : Gwy bte r w " '
LOCATION : bh _
PHONE NO.: at1 - sc.o - 3 8 a n-FAX NO. ,
- 8 '7 ' % o - t i A 2. --
FROM: NAME : Le i Chm LOCATION : u9A L 3 D.E '
PHONE NO.: A e W z9- o AE COMMENTS:
9 .
t m' i
. b
, . sanTzaspier. amanaz aps .
. . . . .., ,. .. , , g ski seectement and m w agreement 1. entered ine. 341. set .
of .'Paly,1991, by and between egensa s. Meyremeau (gesTiernen) 2
. 3 m segrIce cosed5T et "" a"maa (Peh11e Service). g M, meriernes semanesed u.s. separtmoet of Imher caen me.
- 91-sth-37 agelast pehtie servies analming a vietetaan of 42 W.s.c. O Seesar EMMETS, Iseriormen has samfected eith -=1 of his deles, e and keing fully 1Jaformed, wishes te demaas*1mes persait of his elate =pm4==* peMio servies and aer a:ain he any haea ter t attermey's fees en the terms amt casmSitises outliams helews and es*Yamas, in seasideration of McTiernan dismisslag the complaint and other teries and com11tinam est11eed below, Publis ,
servia:a agrw set to purses its defenses to eneen alaim. ,
3er., Tastercer, the parties agree as feileems
- 1. 3ertleamen agrees to Jo all thtags maa====ey to stava the Departuneet of faber dismiss case No. 91-Es&-37 ith ;
prejudies by met '.ater than Atly 11, 1991. i
- 2. . public Servies agswee to pay to seerte s. maTieteen the
, sum of $9.904.94 upes secoution of this Agressant. Such enen ohell innleds any claim for atterasy's fees madmar any l'
' law or. theegy of entitiemmet.
- thieIt IICTiessen hasuhr unives.
e - ma it-k'11tv. It is flam11 understmed
- 3. an. - t I 38F the partles' that en of this and agreed.se. hot -me.t ---<- of uahui f --
a m$m
. tb part of any passes er ==* Arv, liability for l
raised by casa. Be. SI-ERE-37 hotag angressly .. ;
confideokla11tv. A:n part of the censideration beseender 4.
and as est egyrees stigatletten of tale agram===*, ;
IIctieresa esill met dimeleen to aWF thint party the teens 1 of this W 1steludley the ausent met forth ta 9^ r'2 ame -makasvieeges come __
that payment to IIertereen is empressly of memoeary conditiemed upass tthe most-dimenteense of this Agrm====* to any third party.
In the event IIeyigreen discloses any of the tesas of this a,. __ ^ 'to any third tearty, t3ns parties mairmartedge t r
that the"dennagee seensrred by enasti disasseure will Ise G
ea/ts/ss essas 9 aoos 5
- w I
, e lk'q**pl2,,p,im
' I ij4 6,
l'l-((,rhfI3lI!!1l$",
p4 iir 8
% q.
F
]j -
i *: 'al i
,..h{dh.v{I'1K hhqkl
!!Id k
i l
Q a 'j
~
~
3 e
. y. llllnl1 13
.1 i
7 4'
<a
- l
~
5k ' -
1SjMy i
, --- - .. . .y.,..
, MAV 17 '93 9:50 FSU LICENSING 6201797 PAGE.91 f.
T E L E C O P Y c..e, i OO Pubhec Fort St. Vrain 16805 Wald County Road 191/2 Plaumile. CO 80651 (103) 735-6471 Service-Pf2ASEINFORM ADDRi3521 M!AP MS TELEFAX HAS BRIN E TO: ( NAME / COMPANY ) 1_hlLNObN TELEe. PHONE m S11* ObO- $111 RECEIVEIL*S PHONE R ,
FROM: ( NAME / PSco I ou ASE N ED u.R.f.
TELEFAX PHONE #: 503- bz- i lo7 i
SENDEll'S PHONE #: MS- b2.0- lOM COMMENTS or SPECIAL INSTRUCTIONS: ;
i
- Ratars Original to Sender
. Total Number of Pages incinding Cover Page:
~ . . ~ ~ . - - - .- .- - - .. - - . .
- MAY 17 '93 9:50 FSV LICENSING 6201797 PACE.CE Public FORT ST. VRAIN NUCLEAR GENERATING STATION OService* pusuc sannes conwAny oc couMueo >
DATE: MAY 17, 1993 TO: JIM MI1Jt0AM FRON: DON WAREMBOURG SUET: LIST OF RADIOGICAL OCCURRENCE REPORTS /FOLIDW-UP ENPURCEMENT CONFERENCE OF MAY 10, 1993
- eeeeeeeeeee************ee****eeeeeeeeeeeeee***eeeeeeeeeeeee ;
- eeeeee**eeeeeeeeeeeeee***eeeeeeeeeeeeeeeeeeeeeeeee***eeeeeeeee i
Per your request, I am faxing the subject information to you. If .
you have any questions, please do not hesitate to give me ((303) 620-1009) or Ted Borst ((303) 620-1000) a call. j a
$ h Don Warembourg 1 oct Ray Hall / Paul Michaud Fax: 303-554-5509 stalia.O'Malley Fax: 303-295-2599 Crawford Fax: 329-1674 I
i l
camas su m.m.see
E. ,
. ngy 17 '93 9:58 psy LICENS1HG 6?s1787 P 6E.83 FORT ST VRAIN STATION RADIOLOOlCAL OCCURRENCE REPORTS (RDR)-
' AS FOLLOWUP TO THE ENFORCEMENT CONFERENCE HELD ON MAY 10, PLEASE FIND ENCLOSED A TABULATION TO ROR'S INmATED IN 1990,1991, AND 1992 ;
AT FORT ST VRAIN. THE ROR'S ARE CODED WITH EITHER A "P"-INmATED BY A PUBUC SERVICE COMPANY OF COLORADO EMPLOYEE, OR A *C" - INITIATED )
BY A CONTRACTOR EMPLOYEE.
14 ROR'S WERE INmATED IN 1990,10 WERE INmATED IN 1991, AND 19 WERE l INmATED IN 1992. OF THE 14 ROR'S INmATED IN 1990, 3 OR 22% WERE '
INmATED BY CONTRACTORS. ALL OF THESE WERE INmATED BY THE COMPLAINANT. OF THE 10 ROR'S INITIATED IN 1991, 3 OR 30% WERE INITIATED BY CONTRACTORS. OF THE 19 ROR'S INmATED IN 1992,18 OR 95% WERE INITIATED BY CONTRACTORS. THE REDUCTION IN THE NUMBER OF ROR'S INmATED IN 1991 CAN BE ATTRIBUTED TO THE FACT THAT MANY ISSUES WERE i RESOLVED VIA THE HP ISSUES UST AND THE "lSSUE OF THE DAY' IN THE HP AREA. FOR EXAMPLE, IT SHOULD BE NOTED THAT THE ISSUES BETWEEN'THE COMPLAINANT AND THE PERMANENT PSC HP TECHS WERE HANDLED ON THE ISSUES UST RATHER THAN BY ROR'S. ALSO, THE FACT THAT THE NUMBER OF ROR'S INITIATED BY CONTRACTORS STAYED THE SAME IN 1991 AS IN 1990 INDICATES THAT THER2 WAS NO CHILUNG EFFECT WITH RESPECT TO RAISING PERCEIVED SAFETY CONCERNS. THE INCREASE IN THE NUMBER OF ROR'S INmATED IN 1992 CAN BE ATTRIBUTED TO THE INCREASED EMPHASIS ON THE ROR PROGRAM BROUGHT ON BY SHIPMENT OF SPENT FUELTO THE INDEPENDENT SPENT FUEL STORAGE INSTALLA110N (ISFSI). ALSO, DUE TO FUEL SHIPMENT IN 1992, MANY MORE CONTRACTORS WERE ON SITE THAN IN PREVIOUS YEARS.
IN 1992 THE CONTRACT HP TECHS ESSENTIALLY TOOK OVER THE RESPONSIBILITY FOR RUNNING THE DAY TO DAY ACTIVmES IN THE HP AREA.
THE REMAINING PSC HP TECHS WERE ASSIGNED TO A SPECIAL PROJECT TEAM, RESULTING IN A REDUCED OPPORTUNITY TO INMATE ROR'S, l
l 4
-- ., ~ . -- - , , + . - - . . , ,-
,L. MAY 17 '93 S 51 FSV LICENSING 62681707 '
PA*E. H- %
i>
B03 QRIGINATOR DAIE ISSUE 904)1. P TILLMAN 01/22/90 INADEQUATE DOSIMETRY 90-02 P THOMAS 01/24/90 UNAUTH ENTRY INTO AREA 90-03 P HUTCHINS 01/25/90 UNAUTH ENTRY INTO AREA 9CMM P AMEN 03/02/90 UNAUTH MOVEMENT OF MATL .
90-05 P THOMAS 05/10/90 RAM OUTSIDE AUTH AREA '
9046 C MCTIERNAN 06/13/90 VENTILATION FLOW PROSS -
90-07 P THOMAS 07/03/90 UNEXPECTED HIGH RAD AREA 90-08 P TILLMAN 07/12/90 OPEN RIV ON PHM ,
9009P TILLMAN 07/25/90 RWP VIOLATION 90-10 P ODONOGHUE 08/02/90 RWP VIOLATION l 90-11 C MCTIERNAN 09/20/90 UNPOSTED RAD AREA 90-12 C MCTIERNAN 10/16/90 PERSONNEL CONTAMINATION '
90-13 P TILLMAN 10/19/90 HOT PARTICLE ON NRC INSP 9014 P BLAIN 10/18/90 RAM IN UNAUTH AREA 91-01 P WOODARD 01/29/91 RWP VlOLATION 91-02 P TILLMAN 02/06/91 RWP VIOLATION 91-03 P TILLMAN 03/09/91 OFFSCALE DOSIMETER ;
91-04 P TILLMAN 06/11/91 RWP VIOLATION ,
91-06 P WOODARD 08/24/91 POSITIVE URINE SAMPLE 'i 91-06 P ODONOGHUE 08/01/91 CONTAMINATION ON RFP ;
91-07 C JONES 08/05/91 PERSONNEL CONTAMINATION 91-08 P BLAIN 10/09/91 RWP VIOLATION 91-09 C STROUD 11/21/91 OFFSCALE DOSIMETER 91-10 C BALL 12/26/91 WRONG FILM BADGE ISSUED 92-01 C THORP 01/13/92 CONTAMINATION SPREAD ,
92-02 C SAWYER 02/10/92 RWP VIOLATION l 92-03 C EYRE 02/06/92 UNAUTH MOVEMENT OF HP AREA 92-04 C STROUD 02/22/92 EQUIP FAILURE 92-05 C EYRE 02/12/92 UNAUTH RAD EXPOSURE 92 06 C MILLER 03/12/92 RIV OPEN ON FHM 92-07 C KUHN 03/22/92 BYPASSING RAD MONITORS 92-08 P BLAIN 04/02/92 EXCEED ADMIN EXP UMIT.
92-09 C HEARD 04/17/92 IMPROPER EXIT FROM HP AREA 92-10 C ZAHRT 04/10/92 CONTAMINATION SPREAD 92-11 C FULLER MARCH TRITIUM SAMPLE NOT OBTAINED 92-12 C FULLER 05/22/92 INAD DOSIMETRY 92-13 C FROST 06/26/92 CONTAMINATION SPREAD 92-14 C VASSETT 07/23/92 RWP VIOLATION 92-15 C GRANT 07/23/92 RWP VIOLATION 92-16 C MILES 08/31/92 RWP VIOLATION 9217 C THORP 09/22/92 RWP VIOLATION 92-18 C SECURITY 10/27/92 INAD DOSIMETRY 92-19 C CUMMIN VARIOUS RAM SHIPPING VIOLATIONS
~
. , n EATC0922 ENFORCElfkT ACTION TRACKING SYSTEM 07/08/93 LICENWE HISTORY REPORT PAGE- 1 QEGION = CUMULATIVE SORTED BY EA NUMBER SUPPLEMENT = ALL LICENSEE = PUBLIC SERVICE CO. OF COL DATE RANGE = ALL DATES LICENSEE TYPE = ALL DATE TYPE =
EA e LICENSEE INSP DATE SUPPL PROPOSED CP IMPOSED CP AMT PAID ACTIPA ENF CONF DATE ES/ TYPE FACILITY HQ DATE SEV DATE DATE DATE DATF NUREG VOL MIT/ ESC MIT/ ESC 77-011 PUBLIC SERVICE CO. OF CD 00/00/00 8 000 0 8 000 00/00/00
/RX FT ST VRAIN NUCLEAR PLAN 00/00/00 05/11/f7 00/00/00 05/27/f7 00/00/00 M: E: M: E:
81-009 PUBLIC SERVICE CO. OF CO 08/22/80 3 0 0 0 00/00/00
/RX FT ST VRAIN NUCLEAR PLAN 11/19/80 3 00/00/00 00/00/00 00/00/00 00/00/00 M: E: M: E:
86-081 PUBLIC SERVICE CO. OF CO 11/22/85 3 65 000 0 65 000 00/00/00 it /RX FT ST VRAIN NUCLEAR PLAN 05/12/86 2 07/07/06 00/00/00 08/05/56 00/00/00 V5N3 M: E: M: E:
FACTS: Potential pathways for unauth/undected access from controlled to protected and vital areas.88-082 PUBLIC SERVICE CO. OF CO 10/04/85 0 0 0 00/00/00 PR /RX FT ST VRAIN NUCLEAR PLAN 05/12/86 00/00/00 00/00/00 00/00/00 00/00/00 M: E: M: E:
86-098 PUBLIC SERVICE CO. OF CO 05/09/86 1 75,000 0 75 000 00/00/00 HW /RX FT ST VRAIN NUCLEAR PLAN 06/02/86 3 07/07/88 00/00/00 08/05/56 00/00/00 V5N3 M: E: M: E:
FACTS: Operation of power level in excess of level restricted by NRC.86-144 PUBLIC SERVICE CO. OF CO 08/08/86 8 0 0 0 NOV 00/00/00 PR /RX FT ST VRAIN NUCLEAR PLAN 09/17/86 4 00/00/00 00/00/00 00/00/00 09/24/86 M: E: M: E: ,86-188 PUBLIC SERVICE CO. OF CO 09/19/86 3 0 0 , 0 NOV 00/00/00 PR /RX FT ST VRAIN NUCLEAR PLAN 11/25/86 4 00/00/00 00/00/00 -f 00/00/00 12/31/88 M: E: M: E:
87-143 PUBLIC SERVICE CO. OF CO 05/15/87 3 0 0 0 NOV 00/00/00 DR /RX FT ST VRAIN NUCLEAR PLAN 07/27/87 4 00/00/00 00/00/00 00/00/00 09/01/87 M: E: M: E:
d
-N "-*vs- - _ _ _ . _ . _ _ _ _ _ _ _ . _ _ _ . _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ + -
.- ma_ -_m _ _ _ .m-___.* _ - - - - - - - -e.vw. - W -m- _ ,e
?
EATC0922 ENFORCEMNT. ACJION TRACKING SYSTEM 07/08/93 )
LICENtEE HISTO?.T REPORT PAGE 2 REGION = CUMULATIVE SORTED BY EA MUMBER SUPPLEMENT = ALL LICENSEE = PUBLIC SERVICE CO. OF COL DAYC RANGE = ALL DATES LZCENSEE TYPE = ALL DATL !YPE =
EA s LICENSEE INSP DATE SUPPL PROPOSED CP IMPOSED CP AMT PAID ACTION ENF CONF DATE ES/ TYPE FACILITY HQ DATE SEV DATE DATE DATE DATE NUREG VOL MIT/ ESC MIT/ ESC !
l 87-167 PUBLIC SERVICE CO. OF CO 07/31/87 1 0 0 0 NOV 00/00/00 HW /RX FT ST VRAIN NUCLEAR PLAN 12/04/87 4 00/00/00 00/00/00 00/00/00 12/04/87 M: E: M: E:
90-059 PUBLIC SERVICE CO. OF CO 03/02/90 8 0 0 0 NOV 04/16/90 DR /RX FT ST VRAIN NUCLEAR PLAN 00/00/00 4 00/00/00 00/00/00 00/00/00 04/27/90 M: E: M: E:
FACTS: Emergency Preparedness J KEYWORDS: 080100 - Emergency Preparedness - Event Classification -
080200 - Emergency Preparedness - Notification of NRC -
080300 - Emergency Preparedness - Event Response -
080400 - Emergency Preparedness - Emerg. Planning Standa -
90-174 PUBLIC SERVICE CD. OF CO 09/28/90 4 0 0 0 NOV 10/18/90 GC /RX FT ST VRAIN NUCLEAR PLAN 10/30/90 4 00/00/00 00/00/00 00/00/00 10/30/90 M: E: M: E:
FACTS: Radiation protection KEYWORDS: 040101 - Health Physics / Materia - Cause - Personnel Error 040102 - Health Physics / Materia - Cause - Procedural Error 040203 - Health Physics / Materia - Effect - Exposure 040211 - Health Physics / Materia - Effect - Unplanned Rad. Exposur 040405 - Health Physics / Materia - Monitoring / Testing - Dosimetry 040415 - Health Physics / Materia - Monitoring / testing - Survey / Evaluation 040504 - Health Physics / Materia - Programmatic - Procedures 040520 - Health Ph sics / Materia - Programmatic - Health Physics 040604 - Health 'h sics / Materia - Misc. - Label 91-088 PUBLIC SERVICE CO. OF CO 06/21/91 4 62 500 0 62 500 07, d/91 EK /RX FORT ST VRAIN 07/25/91 3 08/15/01 00/00/00 09/13/01 00/00/00 V10NJ M: C E: H M: E: .
FACTS: Repetitive radiation protection violations '
KEYWORDS: 010407 - Reactor Ops - Func t ioq'pM Area - Tech. Spec.
040102 - Health Physics / Materia - Cause - Procedural Error 040203 - Health Physics / Materia - Effect - Exposure 040211 - Health Physics / Materia - Effect - Unplanned Rad. Exposur 040415 - - Surve / Evaluation 040506 - Health Health Physics Physics // Materia Materia- -Monitorin Programma g%-4estipg 5 3
- Rad. rot. Program 040610 - Health Physics / Materia - Misc. -
- Red Work Permit 050600 - Transportation - Packaging / Loading -
EATC0922 ENFORCE .. N TRACMING SYSTEM 07/08/93 LIC STORY REPORT PAGE 3 REG 20N CUMULATIVE . SORTED BY EA NUpeER SUPPLEMENT = ALL LZCENSEE = PUBLIC SERVICE CO. OF COL DATE RANGE = ALL DATES LICENSEE TYPE = ALL DATE TYPE =
EA e LICENSEE INSP DATE SUPPL PROPOSED CP IMPOSED CP AMT PAID. ACTION ' ENF CONF DATE ES/ TYPE FACILITY HQ DATE SEV DATE DATE DATE DATE NUREG VOL MIT/ ESC MIT/ ESC 92-I52 PUBLIC SERVICE CO. OF CO 07/20/92 0 0 0 05/10/93 DR /RX. FT ST VRAIN NUCLEAR PLAN 00/00/00 00/00/00 00/00/00 00/00/00 00/00/00 M: E: M: E:
FACTS: Discrimination against contractor for reporting unsafe health physics practices.
KEYWORDS: 070400 - Misc. Matters - Sect. 210 - Discrimina -
m, .
- 1. _
( , .
, July 15, 1993 FACT SEEET FOR DISCRIMINATION CASE 8 t .
COMPLAINANT [ COMP): McTiernan, George S. ERA NO.: 91-ERA-037 l LICENSEE / FACILITY: Public Service Company of Colorado Ft. St. Vrain . 'l Applied Radiological Company (see disclaimer in " Remarks" below) .
NRC RPGION: 4 i DESCRIPTION OF PROTECTED ACTIVITY: reporting poor work practices by an HP tech J DESCRIPTION OF ALLEGED DISCRIMINATION: termination ]
DATE OF DISCRIMINATION: March 21, 1991 )
DATE OF COMPLAINT: March 26, 1991 i ,
DATE COMPLAINT RECEIVED BY DOL: March 29, 1991 ! -
DID COMPLAINANT ALSO REPORT DISC. TO NRC7:
1 LICENSEE'8 EXPLANATIOP OF ACTION: McT was not a team player, his. I complaints about the HP tech were evidence of behavior problems )
and the licensee had trouble disciplining him.
"The decision to release this contract Health Physics technician i
.. . had already been made prior to'this conversation ever taking place." (see response to chill ltr., dated 6/10/91)
DISCUSSION: l i
ACTIONS TAKEN TO MAKE COMPLAIMANT WEOLE: .
CULPASL5 LICENSEE MANAGER (5) [CLM): . (IrcwDs NMK, TITLK, MD vanq egn_1s:87tsL visu LicRNSEE MD IN VRAT CAPACIrt If DOVK) th,'i )
ACTI fAREN AGAINST CLM:
S peu. i SETTLED: Yes' DATE SETTLED: July 10, 1991 (see ALJ, 7/31/91)
SETTLEMENT CONDITIONS:
DISTRICT DIRECTOR'S DECISION: April 29,. 1991 - discrimination TNis DOCUMENT MAY CONTAIM PREDECISIONAL thFORMATlas IT CAN WOT BE RELEASED OUTSIDE THE MRC l WITMOUT THE APPROVAL OF THE DIRECTOR, OFFICE OF ENFORCDENT l l .l c
r~t <
g "McTiernan was terminated from employment with Public Service company of Colorado after the firm learned he complained to Bil3.
Woodard and the Quality Assurance Department about inadequate testing of conditions hazardous to employee health."
DOL ALJ DECISION: recommended approval of settlement (see SOL, 2/21/92)
SECRETARY OF LABOR DECISION: February 21, 1992 - approved settlement DOL ALJ REVIBED DECISION (If APPLICABLK):
NRC ACTIONS TAKEN:
DISCUBBED WITH OI?: OI rpt. 4-91-019 concluded that McT had been " deliberately" terminated by lic. for his protected activity. DOJ declined prosecution on 2/1/93.
CHILLING EFFECT LETTER [CEL) BENT 7: May 10, 1991 June 10, 1991 response: The licensee stated that the i decision to release McT was made before he raised safety .
concerns. Licensee also refused to release internal sl investigative reports "at the current time". sQ, ,,
ENFORCEMENT ACTION ISSUED (INCLUDK EA NO.): EA 92-152 CLOBEOUT ACTION (oTHER TBAK ENFoRCRMENT):
REMARKS: Although McT worked for Applied Radiological, he said in his complaint that "None of my complaint is directed toward ARC. They had no involvement in this violation." (p. 1) y i
INIS DOCUMENT KAi CONTAlW PREDEcl$10NAL INFORMATION IT CAN WOT BE RELEASED CUTSIDE THE NRC WifMOUT THE APPROYAL OF THE DIRECTOR, OFFICE OF ENFORCEMENT