Rev 1 to LOCA Analysis for Browns Ferry,Unit 1
ML20077C884
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 05/31/1983
From:
GENERAL ELECTRIC CO.
To:
Shared Package
ML20077C866 List:
References
NEDO-24056, NEDO-24056-R01, NEDO-24056-R1, NUDOCS 8307260279
Download: ML20077C884 (47)


Text

, -

e-NED0-24056 Revision 1 Class I May 1983 LOSS-OF-COOLANT ACCIDENT ANALYSIS FOR BROWNS FERRY NUCLEAR PLANT UNIT 1 NUCLEAR ENGINEERING DIVISION + GENERAL ELECTRIC COMPANY SAN JOSE, CALIFORNIA 95125 GENER AL $ ELECTRIC F307260279 830721 PDR ADOCK 05000259 P

PDR

a

  • 9 l

s NEDO-24056 Rev. 1 1MPORTANT NOTICE REGARDING CONTENTS OF THIS REPORT Please Read Carefully The only undertaking of General Electric Company respecting information in this docunent are contained in the contract betueen the Tennessee Valley Authority and General Electric Company and nothing contained in this document shall be construed as changing the contract.

The use of this information by anyone other than the Tennessee Valley Authority or for any purpose other than that for which it is intended, is not authorized; and with respect to any unauthorized use, General Electric Company makes no representation or varranty, and assumes no liability as to the completeness, accuracy, or usefulness of the information containcd in thic document.

11

NEDO-24056 Rev. 1 TABLE OF CONTENTS P_agg 1.

INTRODUCTION' l-1

2. -LEAD PLANT SELECTION 2-1 3.

INPUT TO' ANALYSIS 3-1 4.

LOCA ANALYSIS COMPUTER CODES 4-1 4.1 Results of the LAMB. Analysis 4-1 4.2 Results of the SCAT Analysis 4-1 4.3 Results of the SAFE Analysis 4-1 4.4 Results of the REFLOOD Analysis-4-2 4.5 Results of the CHASTE Analysis 4-3 4.6 Methods 4-4 5.

DESCRIPTION OF.MODEL AND INPUT. CHANGES 5-1 6.

CONCLUSIONS 6-1

~

6.1 Results for 7x7 Fuel 6-2 6.2 Results for 8x8 Fuel 6-3 7-1 7.

REFERENCES iii/iv

l..

~

s.

NEDO-24056 R2v. 1 LIST OF TABLES Table Title Page 1

Significant Input Parameters to the Loss-of-Coolant Accident Analysis

'3-1 2

Summary of Results 4-5 3-LOCA Analysis Figure Summary 4-6 4A MAPLHGR Versus Average Planar Exposure 4-7 4B MAPLHCR Versus Average. Planar Exposure 4-8

.C

.MAPLHGR Versus Average Planar Exposure 4-9 4

4D MAPLilGR Vereus Average Planar Exposure 4-10 4E MAPLHGR Versus Average Planar Exposure 4-11 4F MAPLHGR Versus Average Planar Exposure 4-12 4G MAPLHGR Versus Average Planar Exposure 4-13

)

4 11 MAPLHGR Versus Average Planar Exposure 4-14 41 MAPLHGR Versus Average Planar Exposure 4-15 j

4J MAPLHGR Versus Average Planar Exposure 4-16 4K

. MAPLHCR Versus Average Planar Exposure 4 )

v/vi

e -

'NEDO-24056 Rsv. 1 LIST OF ILLUSTRATIONS Figure Title Paggi la Water Level Inside the Shroud and Reactor Vessel. Pressure Following a Maximum Recirculation Line Suction Break, LPCI Injection Valve Failure, Break Area = 4.2 f t2 (DBA) 6-4

-lb Water Level Inside the Shroud and Reactor Vessel Pressure Following a Maximum Recirculation Discharge Break, LPCI Injection Valve Failure, Break Area = 1.9 ft2.(LBM) 6-5 1c Water Level Inside the Shroud and Reactor Vessel Pressure Following a Recirculation Line Discharge P-ack. T. PCT

' Injection Valve Failure, Break Area = 1.3 f t2 (66% DBA) (LBM) 6-6 2a Peak Cladding Temperature Following a Maximum Recirculation Line Suction Break, LPCI Injection Valve Failure, Break Area = 4.2 ft2 (LBM) 6-7 2b Peak Cladding Temperature Following a Marimum Recirculation Line Discharge Break, LPCI Injection Valve Failure, Break Area = 1.9 ft2 (LBM) 6-8 2c Peak Cladding Temperature Following a Recirculation Line Discharge Break. T. PCT Tniectinn Valve Failure, Break Area = 1.3 ft2 (66% DBA)' (LBM) 6-9 3a Fuel Rod Convective Heat Transfer Coefficient During Blowdown at the High Power Axial Node Following a Maximum Recirculation Line Suction Break, LPCI Injection Valve Failure, Break Area = 4.2 ft2 6-10 3b Fuel Rod Convective Heat Transfer Coefficient During Blowdown at the High Power Axial Node Following a Maximum Recirculation Line Discharge Break, LPCI Injection Valve Failures Break Area'= 1.9 ft2 6-11 3c Fuel Rod Convective Heat Transfer Coefficient During Blowdown at the High Power Axial Node Following a Recirculation Line Discharge Break. T. PCT Iniection j

l Valve Failure, Break Area = 1.3 ft2 (66% DBA) 6-12 4a Normalized Core Average Inlet Flow Following a Maximum Recirculation Line Suction Break, Break Area = 4.2 ft2 6-13 4b Normalized Core Average Inlet Flow Following a Maximum Recirculation Line Discharge Break, Break Area = 1.9 ft2 6-14 4c Normalized Core Average Inlet Flow Following a Maximum l

Recirculation Line Discharge Break, Break Area = 80% DBA 6-15 l

5a Minimum Critical Power Ratio Following a Maximum Recirculation Line Suction Break, Break Area = 4.2 ft2 6-16 Sb Minimum Critical Power Ratio Following a Maximum Recirculation Line Discharge Break, Break Area = 1.9 ft2 6-17 vii

'l

  • l

-NEDO-24056 Rev. 1 P

I LIST OF ILLUSTRATIONS (Continued)

Figure

_ Title Pjyyt Sc Minimum Critical Power Ratio Following a Maximum Recirculation.Line Discharge Break, Break Area = 80% DBA

'6 6a Variation With Break Area of Time for Which Hot Node Remains Uncovered (Discharge).

6-19 6b Variation With Break Area of Time for Which Hot Node Remains Uncovered (Suction) 6-20 1

i i

viii

i e -

NEDO-24056 Rtv. 1 l

{

l.

INTRODUCTION l

1 The purpose of this document is to provide the results of the loss-of-coolant accident (LOCA) analysis for the Browns Ferry Nuclear Plant Unit 1 (BF-1).

The analysis was performed using approved General Electric (GE) calculational models.

This reanalysis of the plant LOCA is provided in accordance with the NRC require-ment (Reference 1) and to demonstrate conformance with the ECCS acceptance.

criteria of 10CFR50.46. The objective of the LOCA analysis contained herein is to provide assurance that the most limiting break size, break location, and single failure combination has been considered for the plant. The required documentation for demonstrating that these objectives have been satisfied is given in Reference 2.

The documentation contained in this report is intended to' satisfy these requirements.

The general description of the LOCA evaluation models is contained in-Reference 3.

Recently approved model changes (Reference 4) are described in References 5 and 6.

These model changes are employed in the new REFLOOD and CHASTE computer codes which have been used in this analysis.

In addition, a model which takes into account the effects of drilling alterncte flow path holes in the lower tieplate of the fuel bundle and the use of such fuel bundles in a full or partial core loading is described in References 7, 8, and 9.

This model nas also approved in Reference 4.

Also included in the reanalysis are curren; values for input parameters based on the LOCA analysis reverification program being carried out by CE.

The specific dhanges as applied to BF-1 are discussed in more detail in later sections of this document.

Plants are separated into groups for the purpose of LOCA analysis (Reference 10).

f Within each plant group there will be a single lead plant analysis which provides the basis for the selection of the most limiting break size yielding the highest i

peak cladding temperature (PCT). Also, the lead plant analysis provides an l

expanded documentation base to provide added insight into evaluation of the l

l details of particular phenomena. The remainder of the plants in that group will have non-lead plant analyses referenced to the lead plant analysis. This document contains the non-lead plant analysis for BF-1, which is a BWR/4 l

l-1

NEDO-24056' Riv.' l with low pressure coolant injection,(LPCI) system modification group plant and is consistent with the requirements outlined in Reference 2.

The same models and' computer codes are used to evaluate all plants. Changes to these'models will cause changes in phenomenological responses that are similar within any given plant group. The difference in input parameters are not expected i

to-result in significantly different results for the plants within a given group.

Emergency core cooling system (ECCS) and geometric differences between plant groups may result in different. responses for different groups but within any group the responses will be similar.

Input changes have been made in the new analysis which are essentially an upgrading of the input parameters to the computer codes.

Thus, the lead plant concept is still valid for this evaluation.

e 1-2

NEDO-24056 R;v. 1 2.

LEAD PLANT SELECTION Lead plants are selected and analyzed in detail to permit a more comprehensive review and eliminate unnecessary calculations. This constitutes a generic 91ysis for each plant of that type which can be referenced in subsequent plant submittals.

The lead plant for BF-1 is James A. FitzPatrick Nuclear Power Plant. The

-justification for categorizing BF-1 in this group of plants and the lead plant analysis for this group is presented in Reference 11, i

2-1/2-2

NEDO-24056 Rev. 1 3.

INPUT TO ANALYSIS A. list of the significant plant input parameters to-the LOCA analysis is

- presented in Table 1.

Table 1 SIGNIFICANT INPUT PARAMETERS TO THE LOSS-OF-COOLANT ACCIDENT ANALYSIS f

4 Plant Parameters:

Core Thermal Power 3440 MWt, which corresponds to 105% of rated steam flow 6

Vessel Steam Output 14.05 x 10 lbm/h, which corresponds to 105% of rated steam flow i

Vessel Steam Dome Pressure 1055 psia Recirculation Line Break Area for Large Breaks -~ Discharge 1.9 ft2 (DBA) 1.3 ft (66% DBA)

~

- Suction-4.2 ft2 Number of Drilled Bundles 744

"*1 Peak Technical Initial Specification Design Minimum Linear Heat Axial Critical Fuel Bundle Generation Rate Peaking Power Fuel Type Geometry' (kW/ft)

Factor Ratio

  • A.-

IC Type 1 & 3 7x7 18.5 1.5 1.2 B.'

IC Type 2 7x7 18.5 1.5 1.2 C.

8DB274L 8x8 13.4 1.4 1.2 D.

8DB274H 8x8 13.4 1.4 1.2 E.

8DRB265L 8x8 13.4 1.4 1.2 F.

P8DRB265L 8x8 13.4 1.4 1.2 G.

8DRB265H 8x8 13.4 1.4 1.2 H.

P8DRB284L 8x8 13.4 1.4 1.2 I.

P8DRB265H 8x8 13.4 1.4 1.2 J.

P8DRB284Z 8x8 13.4 1.4 1.2 I

K.

GLTA-1 8x8 13.4 1.4 1.2 L.

GLTA-2 8x8 13.4 1.4 1.2

  • To account for the 2% uncertainty in bundle power required by Appendix K, the SCAT calculation is performed with an MCPR of 1.18 (i.e.,1.2 divided by 1.02) for a bundle with an initial-MCPR of 1.20.

4 3-1/3-2 4

e-m-g e-+,-n--

-.m.

<,m,

-,,--,-~,,--m--,

.--+g,,,..,--,,e 4

-v-4--,-

y,,-

-yv,,,

,w s,eyw,---,,,,a-p,,w,-7,,

-,-,m,--g-mn, -,,e

NEDO-24056~

Rev.' 1 4.

LOCA ANALYSIS COMPUTER-CODES 4.1 RESULTS OF THE LAMB ANALYSIS This code is'used to analyze the short-term blowdown phenomena for large'postu-lated pipe breaks (breaks in which nucleate boiling is lost before the water level drops and uncovers the active fuel)'in jet pump reactors'.

The LAMB output (core flow as a function of time) is input to the SCAT code for calculation of blowdown heat transfer.

The. LAMB results presented are:

Core Average Inlet Flow Rate (normalized to unity at the beginning of o

the accident) following a Large Break.

4.2 RESULTS OF THE SCAT ANALYSIS This code completes the transient short-term thermal-hydraulic' calculation for The GEXL correlation'is used to track the large breaks in jet pump reactors.

boiling transition in time and location. The post-critical heat flux heat transfer correlations are built into SCAT which calculates heat transfer coefficients for input to the core heatup code, CHASTE.

The SCAT results presented are:

i Minimum Critical Fower Ratio following a L' rge Break.

a l

e l

l-Convective-Heat Transfer Coefficient following a Large Break.

e 4.3 RESULTS OF THE SAFE ANALYSIS This. code is used primarily to track the vessel inventory and to model ECCS

' performance during the-LOCA. The application of SAFE is identical for all bresk The code is used during the entire course of the postulated accident, sizes.

f but after ECCS initiation, SAFE is used only to calculate reactor system pressure and ECCS flows, which are pressure depende t.

I'-

4-1

1 NED'0 24056' Rtv. 1 L

The SAFE results presented are:

~

e Water Level inside the Shroud (up to the time REFLOOD initiates)'and Reactor Vessel Pressure a

4.4 RESULTS OF REFLOOD ANALYSIS This code is used'across the break spectrum to calculate the system inventories

. after ECCS actuation. The models used for the design basis accident (DBA) application ("DBA-REFLOOD") was described in a supplement to the SAFE code description transmitted to the USNRC December 20, 1974. -The "non-DBA REFLOOD" analysis is nearly identical to the DBA version and employs the same~ major assumptions. The only differences stem from the fact that the core may.be partially covered with coolant at the time of ECCS initiation and coolant levels change slowly for smaller breaks by comparison with the DBA. More precise modeling of coolant level behavior is thus requested principally to determine the contribution'of vaporization in the fuel assemblies to the counter current flow limiting (CCFL) phenomenon at the upper tieplate. The differences from.

the DBA-REFLOOD analysis are:

(1) The non-DBA version calculates core water level more precisely'than

+

the DBA version in which greater precision is not necessary, i

l' (2) The.non-DBA version includes a heatup model similar to but less detailed than that in CHASTE, designed to calculate cladding temper-ature during the small break. This heatup model is used in calculating l

vaporization for the CCFL correlation, in calculating swollen level in the core, and in calculating the peak cladding temperature.

i l

The REFLOOD results presented are:

e Water Level inside the Shroud Peak Cladding Temperature and Heat Transfer Coefficient for breaks e

calculated with small break methods L

4-2 j

l

NEDO-24056 R2v. 1 4.5 RESULTS OF THE CHASTE ANALYSIS This code is used, with suitable inputs from the other codes, to calculate the fuel cladding heatup rate, peak cladding temperature, peak local cladding oxidation, and core-wide metal-water reaction for large breaks. The detailed fuel model in CHASTE considers transient gap conductance, clad swelling and rupture, and metal-water reaction. The empirical core spray heat transfer and channel wetting correlations are built into CHASTE, which solves the transient heat transfer equations for the entire LOCA transient at a single axial plane in a single fuel assembly. Iterative applications of CHASTE determine the maximum permissible planar power where required to satisfy the requirements of 10CFR50.46 acceptance criteria.

The CHASTE results presented are:

Peak Cladding Temperature versus time o

Peak Cladding Temperature versus Break Area e

Peak Cladding Temperature and Peak Local Oxidation versus Planar e

Average Exposure for the most limiting break size Maximum Average Planar Heat Generation Rate (MAPLHGR) versus Planar e

Average Exposure for the most limiting break size A summary of the analytical results is given in Table 2.

Table 3 lists the figures provided for this analysis. The MAPLHGR values for each fuel type in the BF-1 core are presented in Tables 4A through 4K.

~

4-3

~

NEDO-24056 Rev. l'

~4.6 METHODS In the following sections, it will be useful to refer to the methods used to analyze DBA, large breaks, and small breaks. For jet-pump reactors, these-are

. defined as follows:

a..

DBA Methods. LAMB / SCAT / SAFE /DBA-REFLOOD/ CHASTE.

Break size: DBA.

b.

Large Bre'ak Methods (LBM). LAMB / SCAT / SAFE /non-DBA REFLOOD/ CHASTE.

Break sizes:

1.0' f t2 ::. A < DBA.

c.

Small Break Methods (SBM). SAFE /non-DBA REFLOOD. Heat transfer 2

coefficients: nucicate boiling prior to core uncovery, 25 Btu /hr-ft _.y after recovery, core spray when appropriate. Peak cladding temperature and peak local oxidation are calculated in non-DBA-REFLOOD. Break sizes A :_ l.0 ft2, l

i l

l I

l l

I 4-4 i

NEDO-24056 Rev. 1 i

Table 2

SUMMARY

OF RESULTS Core-Wide e Break Size e Location Peak Local Metal-Water e Single Failure PCT (*F)

Oxidation (%)

Reaction (%)

e 1.3 ft (66% DBA) 2128(1)

Note 2 0.12 e Recire Discharge LPCI Injection Valve i

e e 1.9 ft2 (DBA) 2086(1)

Note 2 Note 3 e Recire Discharge e LPCI Injection Valve 2

2151(1) 5.7%

. Note 3 e 4.2 ft e.Recire Suction LPCI Injection Valve e

1.

PCT from CHASTE.

2.

Less than most limiting break (5.7%).

3.

Less than most limiting case (0.12%).

1 4-5

i Table 3 LOCA ANALYSIS FICURE

SUMMARY

4 l

Maximum Suction Break Maximum Discharge Break

. Limiting Discharge Break l

(LPCI Injection (LPCI Injection (LPCI Injection valve Failure)

Va\\ve Failure)

Valve Failure)

(4.2 ft )

(1,9 ge2)

(66% DBA) 2 Water Level Inside Shroud and Reactor Vessel Pressure la lb ic Peak Cladding Temperature 2a 2b 2e l

Heat Transfer Coefficient 3a 3b 3e Core Average Inlet Flow 4a 4b 4c p,

i m

f Minimum Critical Power i

Ratio 5a Sb Sc y

j-e o.

Vi l

Peak Cladding Temperature of Highest Powered Plane Experiencing Boiling

{

Transition 2a Uncovered Time Versus Break Area 6a,b r

i i

.)

e i

NEDO-24056 Rev. 1 Table 4A MAPLHGR VERSUS AVERAGE PLANAR-EXPOSURE Plant: BF-1 Fuel Type:

Initial Core - Type 1 & 3 Average Planar Exposure MAPLHGR PCT 0xidation (Mwd /t)

(kW/ft)

(*F)

Fraction 200 15.0

-1926 0.009 1,000 15.1 1902 0.008 5,000 16.0 1975 0.011 10,000 16.3 2047 0.015, 15,000 16.1 2151 0.055 20,000 15.4 2136 0.054 25,000 14.2 2035 0.037 30,000 13.1 1922 0.023 35,000 11.8 1821 0.015 40,000 10.5 1640 0.003 4-7

NEDO-24056 Rev. 1 Table 4B MAPLHGR VERSUS AVERAGE PLANAR EXPOSURE Plant: BF-1 Fuel Type: Initial Core - Type 2 Average Planar

' Exposure MAPLilGR

PCT 0xidation (Mwd /t)

(kW/ft)

(*F)

Fraction

~200 15.6 1973 0.010 1,000-15.5 1956 0.009 16.2 1973 0.010 5,000 16.5-2063

.0.016 10,000 16.5

-2143 0.057 15,000 20,000 15.8 2119 0.055

'14.5 2005 0.038 25,000 13.3 1886 0.024 30,000 35,000 11.9

'1782 0.015 40,000 10.6 1615 0.003 4-8

NEDO-24056 Rev. 1 Table 4C MAPLHGR VERSUS AVERAGE PLANAR EXPOSURE Plant: BF-1 Fuel Type:

8DB274L Average Planar Exposure MAPLHGR PCT 0xidation (Mwd /c)

(kW/ft)-

(*F)

Fraction

~

200 11.2 1673 0.004 1,000 11.3 1681 0.004 11.9 1744 0.005 5,000 12.1 1755 0.005 10,000-12.2 1777 0.005 15,000 12.1 1778 0.005 20,000 11.6 1737 0.004 25,000 10.9 1666 0.003 30,000

.35,000 9.9 1577 0.003 40,000 9.3 1520 0.003 4-9

NEDo-24056 a.y, 1*

Table 4D MAPLHGR VERSUS AVERAGE PLANAR EXPOSURE Plant:

3F-1 Fuel Type:

8DB274H Average Planar Exposure MAPLHCR PCT 0xidation (Mwd /t)

(kW/ft)

(*F)

_ Fraction 200 11.1 1667 0.004 1,000 11.2 1670 0.004 5,000 11.3 1730 0.005 10,000 12.1 1756 0.005 J 15,000 12.2 1778 0.005 20,000 12.0 1775 0.005 25,000 11.5 1733 0.004 30,000 10.9 1667 0.003 i

35,000 10.0 1579 0.003 40,000 1522 0.003 l

l i

i i

i r

(

4-10

NEDO-24056 R3v. 1 Table-4E MAPLHGR VERSUS AVERAGE PLANAR EXPOSURE Plant:

BF-1 Fuel Type: 8DRB265L and P8DRB265L I

Average Planar Exposure MAPLHGR

' PCT Oxidation (mwd /t)

(kW/ft)

('F)

Fraction

~

200 11.6 1769 0.006 1,000 11.6 1773 0.006 5,000 12.1 1823 0.007-10,000 12.1 1824 0.007 15,000 12.1 1836 0.007 20,000 11.9 1834 0.0077 25,000 11.3 1777 0.006 30,000 10.7 1711 0.004 35,000 10.2 1648 0.003 40,000 9.6 1585 0.003 I

i 1

4-11

NEDO-24056 Rev. 1 Table 4F MAPLHGR VERSUS AVERAGE PLANAR EXPOSURE Plant:

BF-1 Fuel Type: 8DRB265H 1

Average Planar Exposure-MAPLHGR PCT 0xidation (mwd /t)

(kW/ft)

(*F)

Fraction

~

200 11.5 1763 0.005 1,000 11.6 1768 0.006 5,000 11.9 1806 0.006 10,000 12.1 1825 0.007 15,000 12.1 1839 0.007 20,000 11.9 1836 0.007 25,000 11.3 1778 0.006 30,000 10.7 1711 0.004 35,000 10.2 1649 0.003 40,000 9.6 1588 0.003 i

4-12 l

[-

NEDO-24056 Rev. 1 1

Table 4G MAPLHGR VERSUS AVERAGE PLANAR EXPOSURE Plant:

BF-1 Fuel Type: P8DRB284L Average Planar Exposure MAPLHGR PCT Oxidation (mwd /t)

(kW/ft)

(*F)

Fraction

~

200 11.2 1738 0.005 1,000 11.3 1740 0.005 5,000 11.8 1792 0.006 10,000 12.0 1801 0.006 15,000 12.0 1809 0.006 20,000 11.8 1801 0.006 25,000 11.2 1745 0.005 30,000 10.8 1684 0.004 35,000 10.2 1620 0.003 40,000 9.5 1546 0.002 i

4-13

NEDO-24056 Rev. 1

~

Table 4H MAPLHGR VERSUS AVERAGE PLANAR EXPOSURE Plant: BF-1 Fuel Type: P8DRB265H Average Planar Exposure MAPLHGR PCT Oxidation (mwd /t)

(kW/ft)

('F)

Fraction 200 11.5 1755 0.005 1,000 11.6 1762 0.005 5,000 11.9 1795 0.006 10,000 12.1 1812 0.006 15,000 12.1 1821 0.007 20,000 11.9 1813 0.007 25,000 11.3 1755 0.005 30,000 10.7 1687 0.004 35,000 10.2 1623 0.003 40,000 9.6 1551-0.002 8

f 4

4-14

1 NEDO-24056 Rtv. 1

=

Table 4I-MAPLHGR VERSUS AVERACE' PLANAR EXPOSURE" Plant: BF-1 Fue'l Ty[e i ' sGLTA-1 *

.(

Average Planar Exposure MAPLHGR PCT C' Oxidation (mwd /t)

(kW/ft)

($1 ),.

Fraction 200 11.2 1738 -

0.005 1,000 11.3 1740 O.005. '

5,000 11.8 1792 0.006';

10,000 12.0 1819 0.006

- ~.

y 15,000 12.0 1827 0.006 '

20,000 11.8 1801

, 0.006 25,000 11.2 1745 0'.005 30,000 10.8

1684, 0.004 35,000 10.2 1612' 0.003 s

40,000 9.5 1542 0.002 i

I 1

l i

l i

b

[

  • For the nodal regions of increased gadolinia appropriate local peaking.',

factors are provided for the process computer.

I lo

\\. -

=

4-15 w

.m e m-r.

.m-w-.

w e-p--

yn,-

,e

-,n

-~e

-w en

--,e-y --

-,------nm

---,r-ve-e-

-~v.--o-,-r-,

-l~m-,,rn+

~----~---; wee--

~.v~

,w-. - - + -

~^~

NED0-24056 Rev. I n

~

Table 4J MAPLHGR VERSUS AVERAGE PLANAR EXPOSURE Plant: BF-1 Fuel Type: GLTA-2 *

~

Average Planar

~

Exposure MAPLHGR PCT 0xidation (mwd /t)

(kW/ft)

(*F)

Fraction 200 11.2 1738 0.005 1,000 11.3 1740 0.005 5,000 11.8 1792 0.006 10,000 12.0 1819 0.006 L5,000 12.0 1827 0.006-20,000 11.8 1801 0.006 i

25,000 11.2 1745 0.005 30,000 10.8 1684 0.004 35,000 10.2

-1612 0.003 40,000 9.5 1542 0.002 l

l l

I

  • For the nodal regions of increased gadolinia, appropriate local peaking factors are provided for the process computer.

~ 4-16

  • lsDO-24056 Riv. 1 Table 4K MAPLHGR VERSUS AVERAGE PLANAR EXPOSURE Plant: BF-1 Fuel Type: P8DRB284Z 4

Average Planar Exposure MAPLHGR PCT Oxidation (mwd /t)

(kW/ft)

(*F)

Fraction 200 11.2 1738 0.005 1,000 11.2 1740 0.005 5,000 11.7 1792 0.006 10,000 12.0 1806 0.006 15,000 12.0 1812 0.006 20,000 11.8 1803 0.006 25,000 11.1 1745 0.005 30,000 10.4 1684 0.004 35,000 9.8 1612 0.003 40,000 9.1 1542 0.002 45,000 8.5 1472 0.001 1

4-17/4-18

NEDO-24056 Rev. 1 5.

DESCRIPTION OF MODEL AND INPUT CHANGES This section provides a general description of the input and~model changes as they relate to the break spectrum calculations. It prov' ides a general background so that the more specific calculated results shown in subsequent sections-can be more easily understood, particularly as they relate to how well trends observed in specific lead plant break spectrum analyses can be applied to the general nonlead plant case. The most limiting break size results are not discussed in this context (except to the extent that they affect the shape of the break spectrum) because detailed limiting break size calculational results will be presented for each plant.

The majority of the input and model changes primarily affect the amount of ECCS flow entering the lower plenum as a result of the counter current flow limiting (CCFL) effect. These changes as applied to BF-1 are listed below.

1.

Input Changes Corrected Vaporization Calculation - Coefficients in the vapor-a.

ization correlation used in the REFLOOD code were corrected.

b.

Incorporated more accurate bypass areas - The bypass areas in the top guide were recalculated using a more accurate technique.

Corrected Core Power in REFLOOD - The core power in REFLOOD was c.

corrected to 102% of rated power.

d.

Corrected guide tube thermal resistance'.

Correct heat capacity of reactor internals head nodes.

e.

2.

Model Change Core CCFL pressure differential = 1 psi - Incorporate the assump-a.

tion that flow from the bypass to lower plenum must overcome a 1 psi pressure drop in core.

5-1

NEDO-24056 Rev. 1 b.

Incorporate NRC pressure transfer assumption - The assumption used in the SAFE-REFLOOD pressure transfer when the pressure is increasing was changed.

A few of the changes affect the accident calculation irrespective of CCFL.

These changes are listed below.

1.

Input Change Break Areas - The DEA break area was calculated more accurately, a.

b.

Core Power - The core power in REFLOOD has been corrected to 102% of rated.

2.

Model Change Improved Radiation and Conduction Calculation - Incorporation of a.

CRASTE 05 for heatup calculation.

b.

Suction Line Friction in Discharge Valve Closure Assumption -

Tcck credit for friction due to irreversible losses in the suction line.

Modify Recirculation Discharge Valve Closure Assumption - Assume c.

the valve does not close for a discharge break.

Note:

this analysis takes credit for flow through holes in fuel lower tieplate. Since the previous analysis, alternate flow paths have been incorporated in fuel lower tieplates.

5-2

NEDO-24056 R v.1 r

.6.

CONCLUSIONS I

Analyses have demonstrated that failure of the LPCI is the most severe failure among the low pressure ECCS because, unlike the core spray which must pass through the CCFL regions at'the top of the core, LPCI is injected into the 6

' lower plenum through the jet. pumps. Thus, the LPCI injection valve is the worst single failure in the large break region. This is the case for a break occurring in either the suction or. discharge piping. For a break in the dis-

-charge piping,~this failure results in no LPCI flow, and for a suction line

~

t.

failure, LPCI flow is minimized.

Comparison of the calculated PCT's for the maximum size break in the suction and discharge piping determines which is the DBA and which is the second most

. limiting location. For BF-1, the suction break is the most limiting location (Table-3) for 7x7 fuel. The characteristics that determine which is the most limiting break area at the DBA' location are:

the calculated hot node reflooding time a.

I b.

the calculated hot node uncovery time, and c.

the time of calculated boiling transition.

The time of calculated boiling transition increases with decreasing break size, since jet pump suction uncovery (which leads to boiling transition) is determined l

primarily by the break size for a particular plant. The calculated hot node.

uncovery time also generally increases with decreasing break size, as it is The hot node primarily determined by the inventory loss during the blowdown.

reflooding time is determined by-a number of interacting phenomena such as depressurization rate, counter current flow limiting and a combination of available ECCS.

L-

[

The period between hot node uncovery and reflooding is the period when the hot node has the lowest heat transfer. The break that results in the longest period during which the hot node remains uncovered usually results in the highest 6-1

NEDO-24056 Rev. I calculated PCT..If two breaks have similar times during which the hot node remains uncovered, then the larger of the two breaks will be limiting as it would have an earlier boiling transition time (i.e., the larger break would have a more severe LAMB / SCAT blowdown heat transfer analysis).

6.1 RESULTS FOR 7x7 FUEL Figures 6a and 6b show the variation with discharge and suction break' size of the calculated time the hot mode remains uncovered for Browns Ferry Unit 1.

The shape of the discharge break curve is very similar to the lead plant, showing a maximum hot node uncovered time at a break less then the DBA (i.e., 66% DBA). However, owing to the geometric differences of Browns Ferry Unit I relative.to the lead plant (larger peripheral bypass area'and smaller vessel volume to break area ratio), the reflooding times for all dis-2 charge break sizes from 1.0 ft to the DBA are considerably lower than that of the lead plant. This resulted in the suction break being more limiting than any of the discitarge breaks.

The determination of the suction DBA being the most limiting break was based on the reasoning discussed above and the procedure used for the lead plant.

From Figure 6a the 66% discharge DBA was determined to be the most limiting discharge break smaller than the discharge DBA. Also, from Figure 6b the-suction DBA was determined to be the most limiting suction break. A CHASTE calculation was performed to compare the PCT for the 66% discharge DBA, the discharge DBA, and the suction DBA The suct' ion DBA was determined to result in the highest PCT of the three break sizes and, hence, was determined to be

~

the most limiting break. The results for 7x7 fuel are presented in Tables 4A and 4B.

  • The CIIASTE calculation for the discharge DBA used the discharge DBA LAMB / SCAT and SAFE /REFLOOD results. The CHASTE calculation for the suction DBA used 1

the suction DBA LAMB / SCAT and SAFE /REFLOOD results. In accordance with the conservative approach used for the lead plant, the 80% discharge DBA LAMB / SCAT results were used with the 66% discharge DBA SAFE /REFLOOD results to determine the 66% discharge DBA results.

6-2

~

e

~

NEDO-24056 R:v. 1 The DBA (the complete severance of the recirculation suction piping) resulte-are shown on Figures;1a through Sa.

These results have changed very little from

- the previous analysis because with LPCI flow available the flood time is rela-tively insensitive to parameters that affect CCFL.

1 The'second most limiting location for the LOCA is the' recirculation discharge line. The results of the maximum-break in this piping.are shown on Figures Ic' through Sc.

These results have changed very'little from'the previous analysis c

because the decrease in_ flow through the bundles, due to increased CCFL' resulting from the new pressure assumption, is offset by the flow through the

~

lower tie plate holes.

The single failure evaluation showing the remaining ECCS following an assumed failure and the effects of a single failure or operator error that causes any manually controlled, electrically operated valve in the ECCS to move to a position that could adversely affect the ECCS are presented in Reference 12.

~

6.2 RESULTS FOR 8x8 FUEL For 8x8 fuel bundles, the worst break is the 66% DBA discharge break rather than the 100% DBA' suction break, which is the worst for 7x7 fuel. This difference is due to the higher stored energy of the larger fuel rods in the 7x7 fuel. The PCT of the 7x7 fuel is more sensitive to early boiling transition, while the PCT of' the 8x8 fuel is more sensitive to the total uncovered time.

Since the core configuration has changed to all drilled 8x8' fuel (8x8, 8x8R, and P8x8R) the ECCS analysis will be virtually identical to that of the Browns l

Ferry 3 analysis reported in Reference 13.

Since the plant is not limited by PCT but rather by thermal mechanical heat flux limits, the MAPLHGRs will not be affected. Analyses were performed for all of the 8x8 fuel types for the 66% DBA discharge break, and the results are presented in Tables 4C through

~

4K.

L i

i l'

L 6-3 l-

- _. _ _. - _ -.. _.,. ~ _ - -,

,_m._

1200 L

I 800 40 3

WATER LEVEL E

3 h

TAF f

1 i

i e

r M

.2 i

5 400

~

y D

A o

BAF e

+

3 i

i l

i i

V VESSE L PRESSURE O

O O

100 200 300 400 500 i

TIME isec) i i

=

i Figure la.

Water Level Inside the Shroud and Reactor Vessel Pressure Following Maximum Recirculation Line g

i Suction Break, LPCI Injection Valve Failure Break Area = 4.2 f t2 (DBA) w I

=

9


---.- -- w

1200 i

40 800 I

3

-E WATER LEVEL j

g D

kj g

TAF

,v v

p.

~

g E

~

i e

W o

w 1

20 "j 400 E

BAF E

c VESSEL PRESSURE l

l 1

I I

j 0

100 200 300 400 SOC 0

TIME isec)

Water Level Inside the Shroud, and Reactor Vessel Pressure Following a Maximum Recirculation "y

Figure Ib.

Line Discharge Break. LPCI Injection Valve Failure, Break Area = 1.9 f t2 (LBM) w j

j I

l j

't

)

l 1200 1

1 1

800 40 3

5 E

WATER LEVEL a

['

2 TAF 5

i O

.2 m

I h

o s

a e

i t

400 20 $

BAF cc i

1 g

I i

I 1.

l

l VESSE L PRESSURE m

00 1

2 3

400 boo 1

TIME tseci W

1 Figure Ic.

Water Level Inside the Shroud and Reactor Vessel Pressure Following a Recirculatic, Line Discharge Break. LPCI Injection Valve Failure, Break Area = 1.3 ft2 (66% DBA) (LBM)

~

w i

O

l 2500 HIGH POWERED AX1AL _

NODE RECOVERED 1 f 2000 Y k N

/

O i

e#s/

w 5

g 1500

[,

2

/p a:

Y 2

/

l

/

x o

E

[

- ONSET OF SPRAY COOLING 1000 y#""

k i

p g

u o

- HIGH POWERED AXIAL tn y

NODE UNCOVERS g

i 500 JL HIGHEST POWER AX: AL PLANE

-- LOWEST AXIAL PLANE TO EXPERIENCE CPR 1.0 PRIOR TO JET PUMP UNCOVERY

- ONSET OF BOILING THANSITION i

I l

0 2

5 10 50 100 500 TIME (sec) 1 5

Figure 2a.

Peak Cladding Temperature Following a Maxi :n-: rom rculation T,ine Suction Break, LPCI Injection Valve Failure, Break Area = 4.2 r,.2 (LBM)

H

2500 HIGH POWERED AXIAL NODE RECOVERED -

if 2000 I

c o_

JL i

is00 4

i 3e

- ONSET OF SPRAY COOLING 0

2:

b 8

e

$ 0in

?

g b

- HIGH POWERED AXIAL NODE UNCOVERS o.

son 4L

- ONSET OF BOILING TRANSITION I

O 2

5 10 50 100 500 TIME (sect 1

N" l

Figure 2b.

Peak Cladding Temperature Following a Maximum Recirculation Line Discharge Break, LPCI Injection Valve Failure, Break Area = 1.9 f t2 (LBM) e 4

9 HIGH POWERED AX1AL PLANE REFLOODED -

If i

i 2000 C

t N

4k h

w JL 2

O E

m o 1000

- SPR AY COOLING T

a5 s

4 o

u M

M 6

- HIGH POWERED AX1AL PLANE UNCOVERED JL i

- ONSET OF BOILING TRANSITION i

O__

l 0.1 1.0 10 100 1000 TIME (sec) m m<

I Figure 2c.

Peak Cladding Temperature Following a Recirculation Line Discharge Break, LPCI Injection Valve Failure Break Area = 1.3 ft2 (66% DBA) (LBM) 1,

NEDO-24056 Rsv. 1 100,000

- JET PUMP UNCOVERY

- ONSET OF BOILING TRANSITION Y1 r 10,000 N

ZO_

20 f

E t.

9I wE 1000 o a 5g

$u n?

w4 kW

$*e E

w

~

- HiGH POWERED h$

o*

AX1 AL NODE 5b UNCOVERED g2 u

mamma 1r 10

- Of4 SET OF LOWER l

PLCNUM FLASHING l

f I

I 3,

O 10 20 30 40 l

TIME hed Figure 3a.

Fuel Rod Convective Heat Transfer Coefficient During Blowdown at l

the High Power Axial Node Following a Maximum Recirculation Line 2

l Suction Break, LPCI Injection Valve Failure, Break Area = 4.2 f t 6-10 l

[

i NED0-24056 Rev. 1 100,000

- JET PUMP UNCOVERY

- ONSET OF BOILING TRANSITION 10,000

' I1P 20_ZI O

e~

oI aE 1000 u o O

~

sa

!?

>- 4 m'

  • b

$[

100

- HIGH POWERED AX1AL

{

PLANE UNCOVERS s5 gi U

1r iL 10

_ ONSET OF LOWER PLENI M FLASHING l

l l

' TO ZERO l

0 20 40 60 80 TIME (sec)

Figure 3b.

Fuel Rod Convective Heat Transfer Coefficient During Blowdown at the High Power Axial Node Following a Maximum Recirculation Line 2

Discharge Break, LPCI Injection Valve Failure, Break Area = 1.9 f t 6-11

NEDO-24056 Rev. I 100.000

- JET PUMP UNCOVERY

- ONSET OF BOILING TRANSITION 10.000 p

==

2O_

20 wNOi c4 1000 53 oE U Q m o 5e

&?

e<

F E t ut s [

iOO s

UU s5 gi u

JL 10 -

- ONSET OF LOWER PLENUM FLASHING I I g

g g

TO ZE RO O

20 40 60 80 f tME (sec) l l

Figure 3c.

Fuel Rod Convective Heat Transfer Coefficient During Blowdown at the High Power Axial Node Following a Recirculation Line Discharge Break, LPCI Injection Valve Failure, Break Area = 1.3 f t2 (66% DBA) 6-12

4 1.0 4

~

}

0.6 JE T pump UNCOVERY "

3O i

Oo Ow U

2:

M N

i E

i 4

N g

o V

W Z

o j

M o

O.2 k

I

_A m

_~

k h

\\

- LOWER PLENUM FLASHtNG i

I I

I l

- 0.20 4

8 12 16 20 i

TIME AFTER BREAK (sec) i l

w to I

Figure 4a.

Normalized Core Average Inlet Flow Following a Maximum Recirculation Line Suction Break, Break Area = 4.2 ft2 r

I l

l

.O e

2t8&a*

n

y-w o

v 04 kaer B

egra hcs i

2 D

l 3

en i

L no i

ta G

l N

I u

H c

S r

A i

L c

F e

M R

U 4

N 2

m I

E u

L m

P

)

i c

R e

x s

a E

(

W K

M 2

O A

L E

a R

2)

B g

t R

n f

r E

i h

T w

/

lb F

o A

l 00 E

l j

M o

0, I

F 0

T W0 6

O1 I

1 w

D =

o N N l

I I

F WG(

t t

e f

i ln I

e g

ar2 et vf A 9 e

I 8

r1 o

C =

d a ee zr iA lak ma re or NB L-b4 0

e 0

6 2

r 0

0 u

1 g

~

iF hj 28$ ?$z mL

YncO eO o s

8 t

x 04

)A B

D 0

8

(

G N

k I

a H

e S

r A

B L

2 F

I 3

e M

g 5

U r

N a

E h

L c

P s

R i

E D

WO e

L n

iL L

l no l

i t

\\

I 4

a l

2 l

)

u ce c

j s

(

r 2) a__

K i

t A

c f -

E e

rh R

R I

B t

0 R

a 0

E 0,

T g

W0 F

n 0

O1 A

i D

E w

=

N M

o I

N I

l WI T

G t

(

lo I

6 F

1 w

o lF te l

n I

e g

a r

e vA i

8 ero C

d ez i

l amro N

.c 4

0 0

6 2

2 e

1 O

O 0

r u

g i

F 53w $O oN34 6 igu t'!

j

,I.-

i <

l l

l

llll 2go1 v@

N :<. Y

  • i 9

kaer I

8 B

kaer B

no 7

i tc Y

u R

S EV e

O n

C i

N L

U P

n M

6 o

U i

P t

T a

E l

J ucr ice 5

R m

)c u

e m

s

(

i I

a E

x M

T M a

4 g

n i

wo l

lo F

3 o

i taR re wo P

2 la TA T

c2 2

A it A

1 tf R

0. R 1

i E

1

= C

=E r2 RA C

C PP RA 4

CS PP m

CS u=

r m

1 1p iane ir MA

.a S

O 4

2 0

8 6

4 2

0 8

6 4,

2 O

er 0

0 g

0 u

2 2

2 1

1 1

1 g

i 9 E c 1s $ a J4 5 > & J' 2 2 2 u

F m

1 ll ll l1ll1 ljll1IIlllI l

I ll Il I

ll lI

e I

2.4 2.2 2.0 1.8

- CPR = 1.0 AT t WINDOW 2

SPACER 2 (GIN = 100.000 lb/hr-ft ) _

m E

y 1.4 2

0 1,2 ex 0

II Z

y tu 3

'O g

e N

f u

0.8 on m

0.6

- CPR = 1.0 AT SPACE R 3 0.4 0.2 l

0 0

2 4

6 8

10 12 14 16 18 TIME (sec) i I

E<

Figure Sb.

Minimum Critical Power Ratio Following a Maximum Recirculation Line Discharge Break, H

Break Area = 1.9 ft2

e e

z @ [ >ow*

n:

8 1

)ABD I

6 1

0 8

2)

(

t k

f r

a h

/

e b

l r

0 B

00 4

e W0 I

1 g

O 0 r

1 D=

a N

h I

N Wt c

G s

t (

iD en 2

I 1

iL ne i

ta luc I

0 r

1 ic

)

e c

e R

(s E

a M

I T

gn i

8 w

I o

l lo F

o i

ta l

6 R

rewo P

lac i

4 t

ir C

m T

T A

um A

0. 3 i

R

0. 2 n

1 E

R

=

i 1

C 2

1

=C RA M

E PP RA CS PP CS g

c sJ S

y eru g

0 i

4 2

0 8

6 4

2 u

s.

6 4

2 0

F o

0 0

0 2

2 2

1 1

1 1

93 xy2aht5 3ar

  • T~C D

il l!

l1 l

1 lj1lll ll' il1 ll' l1l

e...

NEDO-24056 Rev. 1 200 180 160

-l

}

140 E

sO l

120

=<

=

$g 100 BZ 5

iI 80 e

8 a

E 00 40 20 I

I I

f I

I I

O 20 30 40 50 60 70 80 90 100 BRExA AREA (% DBA)

Figure 6a.

Variation With Break Area of Time for Which Hot Node Remains Uncovered (Discharge) 6-19

n....

NEDO-24056 Rrv. 1 i

200 IBO 160 5

140 g

E

$o Eo 120 a

E<2 E

8 g

100 oz 5

if 80 o

e O

9 5

I 60 40 20 I

l l

I I

l 0 2 40 60 80 100 120 34o 160 180 BREAK ARE A (% DBA)

Figure 6b.

Variation with Break Area of Time for Which Hot Node Remains Uncovered (Suction) 6-20

e...

a NEDO-24056 R v. 1 7.

REFERENCES 1.

Letter, A. Schwencer (NRC)'to Godwin Williams,'Jr (TVA), "Re: Browns Ferry-Nuclear Plant, Units Nos. 1 and 2," dated March 11, 1977.

Letter, Darrel G. Eisenhut (NRC) to E.'D. Fuller (GE), Documentation of the

2..

Reanalysis Results for the Loss-of-Coolant Accident (LOCA) of Lead and

'Non-Lead Plants." Jane 30, 1977.

3.

General Electric Company Analytical Model for Loss-of-Coolant Analysis in~

Accordance with 10CRF50 Appendix K,_NEDO-20566 (Draft), submitted August 1974, and General Electric Refill Reflood Calculation (Supplement to SAFE Code Description) transmitted to the USAEC by letter, G. L. Gyorey (GE) to Victor Stello, Jr. (NRC), dated December 20, 1974.

4.

" Safety Evaluation for General Electric ECCS Evaluation Model Modifications,"

letter from K. R. Goller (NRC) to G. G. Sherwood (GE), dated April 12, 1977.

5.

Letter, A. J. Levine (GE) to D. F. Ross (NRC) dated January ~ 27, 1977,

" General Electric (GE) Loss of Coolant Accident (LOCA) Analysis Model Revisions - Core'Heatup Code CRASTE05."

6. -

Letter, A. J. Levine (GE) to D. B. Vassallo (NRC), dated March 14, 1977,

" Request for Approval for' Use of Loss of Coolant Accident (LOCA) Evaluations Model Code REFLOOD05."

7.

" Supplemental Information for Plant Modification to Eliminate Significant In-Core Vibrations," Supplement 1, NEDE-21156-1, September 1976.

8.

" Supplemental Information for Plant Modification to Eliminate Significant.

.In-Core Vibrations," Supplement 2, NEDE-21156-2, January 1977.

9.

Letter, R. Engel (GE) to V. Stello (NRC), " Answers to NRC Questions on NEDE-21156-2," - January _ 24, 1977.

10.

Letter, G. L. Gyorey (GE) to V. Stello, Jr., dated May 12, 1975, " Compliance with Acceptance Criteria for 10CFR50.46."

11.

Letter, George T. Berry (PASNY) to Robert W. Reid (NRC) " James A. FitzPartick Nuclear Power Plant ECCS Analysis Docket No. 50-333," dated July 29, 1977.

12.

" Emergency Core Cooling System Analysis Appendix K Requirements,"

NEDO-20973, dated August, 1975.

13.

"LOCA Analysis for Browns Ferry Nuclear Plant Unit 3," NEDO-24194A, July 1979.

7-1/7-2