' ; Att5chment to TXX 91150 Page 1 of 4 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DCXXETNO: 50-44a UNIT: CPSES 1 DATE: Acril8. W 91 COMoLETED BY: G.W. Thalcher TELEPHONE: 817 897-8223 OPERATING STATUS

1. Reporting Period: MARCH 1991 Gross hours in reporting period: 2.4.4
2. Currently authorized power level (MWt): 3.4.1.1 Max, depend. capacity (MWe Net): 115.Q.' Design Electrical Rating (MWe Net): .1.110
3. Power level to whi'h restricted (if any) (MWe Net): None
4. Reasons for restriction (if any):

THIS MONTH YR'O UATE CUMUI.ATIVE

5. Number of hours reactor was critical 445.3 1808.2 4734.6 6, Reactor reserve shutdown hours 298.7 351,8 624.7
7. Hours generator on line 437.2 1787,7 4653.4
8. Unit reserve shutdown hours 0 0 0
9. Gross thermal energy generated (MWH) 1,375,315 5,689,547 13,346,475
10. Gross electrical energy generated (MWH) 459,846 1,907,386 ' M2,386
11. Not electrical energy generated (MWH) 434,571 1,817,705 4,331,219
12. Reactor Service factor 59.9 83.7 85.5
13. Reactor availability factor 100 100 96.8
14. Unit service factor 58.8 82.8 84.0
15. Unit availability factor 58.8 82.8 84.0
16. Unit capacity factor (Using MDC) 50.8 73.2 68.0
17. Unit capacity factor (Using Design MWe) 50.8 73.2 68.C
18. Unit forced outage rate 14.4 7.2 7.6
19. Shutdowns scheduled over next 6 months (Type, Date, and Du ation of each): a) Maintenance /

Surveillance, 910322, 6 weeks.

20. Il shutdown at end of repon period, estimated date of startup: 910504
21. Units in test status (prior to commercial operation): ACHIEVED Commercial Operation 900813 Estimated 9105220179 910515 PDR ADOCK 05000445 g PDR