'. Attachment to TXX 91189 Page 1 of 4 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DOCKETNO-50-445 UNIT:
CPSES 1 DATE:
May 9.1991 COMPLETED BY:
G. W. Thatcher TELEPHONE:
817-897-8223 OPERATING STATUS 1.
Reporting Period: APRIL 1991 Gross hours in reporting period: 211 2.
Currently authorized power level (MWt): 3.411 Max. depend. capacity (MWe Net): lifiD.* Design Electrical Rating (MWe Net): 115.0 3.
Power level to which restricted (if any) (MWe Net): None 4.
Reasons for restriction (if any):
THIS MONTH YRTO DATE CUMULATIVE 5.
Number of hours reactor was critical 0
1808.2 4734.6 6.
Reactor reserve shutdown hours 719 1070.8 1343.7 7.
Hours generator on line 0
1787.7 4653.4 8.
Unit reserve shutdown hours 0
0 0
9.
Gross thermal energy Generated (MWH) 0 5,689,547 13,846,475 l
- 10. Gross electrical energy generated (MWH) 0 1,907,386 4,572,386
- 11. Net electrical energy generated (MWH) 0 1,817,705 4,331,219 l
- 12. Reactor Service factor 0
62.8 75.7 l
l-
- 13. Reactor availability factor 100 100 97.2
- 14. Unit service factor 0
62.1 74.4 l
- 15. Unit availability factor 0
62.1 74.4
- 16. Unit capacity factor (Using MDC) 0 54.9 60.2
- 17. Unit capacity factor (Using Design MWe) 0 54.9 60.2
- 18. Unit forced outage rate 0
7.2 7.6
- 19. Shutdowns scheduled over next 6 months (Type, Date, and Duration of each): a) Refueling, 910915, 56 days.
- 20. If shutdown at end of report period, estimated date of startup: 910504
- 21. Units in test status (prior to commercial operation):
ACHIEVED Commercial Operation 900813 Estimated 9105220175 910515 PDR ADOCK 05000445 R
POR
.' Attachment to TXX 91189 Page 2 of 4 AVERAGE DAILY UNIT POWER LEVEL DOCKETNO:
50-445 UNIT:
CPSES1 DATE:
May 9.1991 COMPLETED BY:
G. W. Thatcher TELEPHONE:
817-897-8223 MONTH: APRIL 1991 D4Y AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Not) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
l 5
0 21 0
i 6
0 22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 16 0
. Atta'chment to TXX-91189 Page 3 of 4
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO:
50-445 UNIT:
CPSES1 DATE:
May 9.1991 COMPLETED BY; G. W. Thatcher TEEPHONE:
817-897-8223 MONTH: APRIL 1991 4/1 0000 Unit started month in MODE 5.
MAJOR WORK ACCOMPUSHED DURING OUTAGE Feedwater Oritice installation RCP Seal Replacement D/G Work and Surveillances Secondary Plant Material Condition / Reliability MOV Testing Turbine-Generator Inspections / Repairs Electrical Bus Outages Condenser Tube Repairs Feedwater Elbow Thinning BW/IP Check Valve Sticking Switchyard Modifications 4/30 2400 Unit ended month in MODE 5.
l-i i
l
Attachment to TXX-91189 Page 4 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETrn 50-445 UNIT:
CPSES 1 DATE-May 9.1991 COMPLETED BY:
G. W. Thatcher TELEPHONE-817-897-8223 REPORT MONTH APRIL 1991 l
i METHODOF TYPE SHUTTING [OWN Ff0RCED DURATION THEREACTOROR fQ
[BHi SSCHEDUt Fn (HOURS)
RF1Kt1 REDLCING FONER CORRECTIVE ACTOf6COf#AENTS 006 910401 S
719 B/F 1
Planned Outage l
2 ) METHOD 1)
REASON A EQUIPMENT FAILURE (EXPLAIN)
E OPERATORTRAINING ANDUCENSEEXAM! NATION 1: AW4UAL B: MAINT ORTEST F: ADMINISTRATIVE 2: MANJALSCRNd C: REFUEUNG G OPERATIONALERROR(EXP114N) 3: AUTOMATICSCRNA 4: OTHER (EXPLAIN)
I D: REGULATORY RESTR:CTON H: OTHER (EXPLAIN)