Ao-Omaha Public Power District 1623 Harney Omaha, Nebraska 68102 402/536-4000 July 22, 1983 LIC-83-174 i
l Mr. Robert A.
Clark, Chief U.
S.
Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Tgicensing Operating Reactors Branch No. 3 Washington, D.C.
20555
References:
(1)
Docke t No. 50-285 (2)
Letter dated March 8, 1983 from W.
C.
Jones to R.
A. Clark (LIC-83-054)
(3)
Letter dated March 14, 1983 from R.
A.
Clark to W. C. Jones
Dear Mr. Clark:
NUREG-0737, Items II.F.1.6 and III.D.3.4 The above referenced letters included communications regard-ing the District's completion of NUREG-0737, Items II.F.1.6 (containment hydrogen monitors) and III.D.3.4 (control room habitability including instrumentation for detection of air-l borne iodine radiation in the control room, electrical and mechanical modifications to the UVAC, and instrumentation for monitoring of toxic chemical gaaes).
Completion l
schedules for these items were also included in the above referenced correspondence.
The purpose of this letter is to provide confirmation that the following actions have been completed.
The repairs referenced in the March 14, 1983 letter for Item II.F.1.6 (containment hydrogen monitors) have been completed.
In-stallation of the instrumentation for the detection of air-borne iodine radiation in the control room was completed in accordance with the schedule given in reference (2).
It has been determined that no modifications are required for the electrical and mechanical portions of the control room heat-ing and ventilation system and, therefore, this item is con-sidered completed.
As indicated in the March 8, 1983 Ao%
8307260143 830722 DR ADOCK 0500028 455 24 Employment with Equal Opportunity Male / Female
av Mr. Robert A. Clark LIC-83-174 Page Two letter, the installation of instrumentation for monitoring toxic chemical gases in the control room is presently scheduled to be completed by June 30, 1984.
Sjncerely, J
C.
nes Divisi Manager Production Operations WCJ/KJM:jmm cc:
LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.
Washington, D.C.
20036 Mr.
L.
A.-Yandell, Senior Resident Inspector
.