Text
.___.
m..
VIHulNIA En. :rtuic Axn l'ows:ia Cosli Asy Itir n> o x u,V ntoix44 e n e n:
May 15, 1991 U. S. Nuclear Regulatory Commission Serial No.91-278 Attention: Document Control Desk NL&P/JMJ:Jmj Washington, D.C. 20555 Docket Nos.
50 338 50-339 License Nos. NPF 4 NPF 7 Gentlemen:
l VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 l
for the month of April 1991.
Very truly yours, b
hAo
. (et W. L. Stewart Senior Vice President Nuclear l
Enclosures cc:
U.S. Nuclear Regulatory Commission 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 L
Mr. M. S. Lesser l
NRC Senior Resident inspector l
North Anna Power Station pean tasqr i
i l
VIRGINIA POWER COMPANY NORTl! ANNA POWER STATION MONTIILY OPERATING REPO*AT MONTil t _ April YEAR:
1991 Approved:
L TiilManager\\h-Stat
0
/
4 CPIRAllWG Dala $tPDR1 00CKti hD.4 50 338 00CLt1 h0.4 50-338 OAft: May 1, 1991 COMoltitD 8v C. Mladen Phoht (703) 894 2774 DrteAf thG STA10$
1.
Uni t h one s................................ h o r t h A nna 1 2.
k epor t i ng Per 10ds......................... Apr i l 1991 3.
L ic ensed T herne t Power ( MWt ):.............
2.893 4 hameplate Rating (Grost MWe).............
947 5.-Design tiectrical Rating (het MWe).......
907 6.
Mante an Dependable Capacity tGross Mwe)..
959 7 Masiman Deperdable Capacity (het MWe)r....
911 8.
If changes occur in Capacity Ratings (Itens ho. 3 thru 7) since last report, give reasons:
N/A 9 Power levet to which restricted, if any (het MWe):,,_N/A
- 10. Reasons for restrictions, if any:
N/A this Month YtD Cumulative
- 11. Hour s i n R epor t i ng Pe r i od................................
719.0
?,879.0 112.691.0
- 12. hamber of Hours Reactor was Critical............
719.0 1,561.6 81,552.5
- 13. kcac t or R eserve Shutdown Hours.............,.............
0.0 21.6 6,625.2
- 14. Nours Generator On.Line.................................,
719.0 1,530.9 78.750.9
- 15. Unit Reserve Shutdown Hours..............................
0.0 0.0 0.0
- 16. Gross Thernet Energy Generated (MWH).....................
2,071,896.5 3,797.512.8 208.783,748.8
- 17. Gross Electrical Energy Generated (MWH)..................
689,082.0 1.256,866.0 68,598,204.0 if, het tiectrical Energy Generated (MWH)....................
657,104.0 1.191.019,0 64,919.771.0
- 19. Un i t. $ e r v i c e f a c t o r......................................
100.0$
$3.2% -
69.9%
- 20. Uni t A ve l i abi l i t y f act or.................................
100.0%
$3.2%
69.9%
- 21. Unit Capacity factor (using MDC Net).....................
100.3%
45.4%.
64.4%
- 22. Uni t Capacity f actor (using DER het)..........
100.8%
45.6%
03.5%
- 23. forced Outage Rate.......
4...............
0.0 0.0%
12.3%
~
- 24. Shutdowns $cheduled Over heat 6 Months (Type,' Date. and Durat ton of._ tach):,, hone
- 25. If Shutdown at end of Report Period, estimated time of Startup N/A
- 26. Units in fest Status (Prior to Cecrercial Operation):
forecast Achieved
~
INiilAL CRiflCALITY l
_lWlilAL FLECTRIClif l-CDMMERCIAL OPERATION l
i AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-338 Unit NA-1 Date:
May 1.
1991 Completed by C.
Mind _ oft Phone (701) 821-222A MONTit
_ April 1991 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY LEVEL LEVEL (HWo-Net)
LEVEL (HWo-Net) 1 911 17 9_18 4
2
_ 911 18 917 3
912 19 916 4
3R 20 916 5
913 21 9_1_6 6
914 22 116 7
912 23 915 8
915 24 915 9
916 25 915 10 916 26 916 11 915 27 216 12 902 28 917 13 911 29 913 14 911 30 917 15 910 16 915 Instructions:
On this format, list the average daily unit power level in MWe-Not for-each day in the reporting month, compute to the nearest whole megawatt.
l l-
,!,t'.>f i[ f' [ !f.
F!1[i
.tvi
!tLIti!rl Yt((j((f![Il I[lrfi>
s e
s e
nase e
ot nl c
n i aei r
8 e
e e
t D cF u
3 1 d4 v
c c
i o
i n
3 -
a7
- A l 7 t
e uf L)
S ro R
0N M2 c
r t
rE e
5 1
eor snoL m
9. 4 rt u 9 C9 r
c nof
(
a I i S
1 8
one t st
)
C oR
- at r1 i
)
r eo6 1 Y3
& t t F aepl H
B0 cn ph eO
- . : y 7
eA e oE au(
s v
t eSR -
t ir G
i NMM t
u e
b pytE b
a r
A i
i rnR i
TN s:
C P
h rt eU h
- LE x onvN x
1-T TE P N E
- Ef EE
(
CI TMO 4
5 ONA OH DUDCP 5
m t
a n
n rso e
mcni ne aS ot od r
i c po cct u mC Si ad o
t ue C
dl l anR oaami r
4 h uuotd e mee t nnt nah eaauoot tdso MMMA CLO S.
= = = =
yC N
- 1 23 4 5 9 S
O 3
- I 1
- T 9
C.
9 e
U 1
et s nt DE l
ner n
R i
evo r
cE p o
i R
p i
e t
E A
L R
a W
n O
i D
H r
m T
3 o
a D
N f
t x
N O
ogc E
A M
na di e e
)
S T
otR n
s N
R h t i
n W
O t un C
P eh w a
e l
c u
E MS o p
ni l
R D
x oL u
e i
h 2
( t t&
n S
s c
o ee i g r
s T
rT rn o
a I
u ti r
)
N e
l r snern U
R i o eivEi n
a R ai a
o F e rtl l c
yTaap i) t s
't ngr-rnx nanort oe ar rh enit osi(
nmel ati t u(
opt el anar D
si nu urire 1
h auif gemeh e
t eqaeepd pt p
n R EMR ROAOO y
o
= = = = =
- ABCDEFGH T
m 2
s i
h d
e t
e l
ta y
d u D
r ed t
ece n
prh e
yoc TF S o
- FS o
N N
1
,)I'l!'
- t4fl,
.;j l l';l4f i!l a:
'iii
!<i l4i!
,';;)
j!l<'!;il
o Page 1
o f
,_._1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-338 Report Month Ap d Unit Name NA-1 Years 1991 Date: May 1, 1991 4
Completed by:
Cathie_Mladen No entry thin month t
4--...-..-
.-.,,-__w._,..
.m-.
.-.i.
..--..m
NORTH ANNA POWER STATION UNIT No.I 1
MONTH:
___hp r i 1 MMMARY_01' 9PIRATWO_EXEERIENCE Listed below in chronological sequence is a
summary of operating experiences for this month which required load reductionu or resulted in significant non-load related incidents.
Ra33 T_ing Dala i
April 01, 1991 0000 Began month with unit at 99.4%,
959MWo with turbine governor valvo
/4 full open.
April 12, 1991 0910 Commenced unit ramp down for TVTT.
1028 Unit stable at 88.5%.
1135 TVFT completed natisfactorily, i
1140 Commenced unit ramp up.
1350 Unit stable at 99.5%.
April 16, 1991 0940 Commenced performance of special test procedure 1-ST-93.
purpose of the procedure is to allow reactor power to reach 100% and increase electrical output by bypassing a portion of the foodwater flow to the first point feedwater heators.
1300 Completed manipulation of the first point feedwater heater bypass valves por 1-ST-93.
The bypass valves are approximately 33-38%
open.
Unit stable at 100%.
April 30, 1991 2400 Ended month with unit at 100%,
960MWo.
l T
t l
...... - - -. - - - - - - ~ ~ - - - -
r i
.4 i
OrERA11hc DATA RIPosi L
00Citt ko.:
50 339 CATE: May 1. 1991 COMPLEltp BY:
C. Mladen l
PH0kt t (703) 694 2774 OrtRAilNG $1A105 1.
Uni t kane s............................... N or t h A nna 2 2.
R epor t i ng Per i od t......................... Apr i l 1991 r
3.
L i c ensed t hernal Power (MWt ) t.............
2893 4 haneplat e Rat ing (Gross MWe).............
947 1
5.
Design tiectricat Rating (het MWe):.......
907
}
6.
Maniman Dependable Capacity (Gross MWe)..
'957 7.
Manimun Ocpendable Capacity (ket MWe)t....
909
- 8...lf changes occur in Capacity Ratings (items No. 3 thru 7) since test report, give reasons:
N/A I
9.
Power levet to which restricted, if any (het MWe): ___N/A
- 10. Reasons for restrictions, if any:
N/A this Month VtD Cunulative
- 11. H our s i n R epor t i ng Pe r i od..............................
719.0 2,879.0 90,959.0 12.- Number of Hour s R eac t or was C r i t i c a t...................
719.0
?,879.0 74,013.3
- 13. R9ac tor R eserve Shutdown hours...................
0.0 0.0 5.949.6
- 14. hours Generator On Line........................
719,0 2,879.0 T3.113.3
- 15. Unit Reserve shutdown Hours......................
0.0 0.0 0,0
- 16. Cross thermat Energy Generat ed (MWH)..................... 2,079.289.4 8,326,677.6 195,575.811.0
- 17. Gross ( L ec t ri cal Energy Generated (MWH)................
690,195.0 2,766,500.0 64,069,086.0 e
18.- h et ( L ec t ri cal Energy Gene ra t ed (MWN)....................
657.860.0 2,635,658,0 61,451,138.0
- 19. Unit Service factor...............
100.0%
100.0%
80.4%
- 20. Unit Availability factor.................................
100.0%
100.0%
80.4%
'21. Unit Capacity Factor (using MDC het).........
100.7%
100,7%
75.1 %
- 22. Unit Capacity Factor (using DER het)..............
100.9%
100.9%
74.5%
- 23. forced Outage Rate................
0.0%
0.0%
6.1%
- 24. Shutdowns Scheduled over heat 6 Months (1vpe, Date, and Durat ion of Each): __ hone l
l l
l l
- 25. If Shutdown at end of Report Period, estimated time of Startup:
N/A I
- 26. Units in fest Status (Prior to Converciat Operetten):
Forecast Achieved j.
IW111AL CRITICAL!1f INITIAL [LEC1RIClfY COMMERCIAL OPERATION
______.,__,_,__.-._..__._,.__,_--..-,._.._.,..,r.,,_._
i e
AVERAGE DAILY UNIT POWER LEVEL Docket No.I S0-323 Unitt 11 A-2 Date
_. Jay _L 1991_
Completed by
__Cd11minn__
Phones 171 1) 094-2774 f
MONTH April 1991 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY LEVEL LEVEL (HWe-Net)
LEVEL (MWe-Net) 1 916 17 914 2
916 28 913 3
915 19 91,4 4
916 20 9 13 5
902 21 914 6
904 22 915 7
915 23 916 8
918 24 9 15 9
919 25 915 10 920 26 916 11 920 27 911 12 318 28 2_13 13 917 29 913 14 926 30 913 15 917 16 915 l
Instructions on this. format, list the average daily unit power level in MWo--
Not-for each day in the reporting month.
Compute to the nearest whole megawatt.
l l
IINIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-339 UNIT NAME:
NA-2 DATE: May 1, 1991 REPORT MONTH: April 1991 4XTMPLETED BY:
C. Mladen PHONE:
(703) 894-2774 I
l I
i 1
2 3
4 5
No.
Date Type Duration Peason Method of Licensee System Corponent Cause & Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence
- No entry this month 3: Method 4-l 1: Type 2: Reason F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions 2= Manual Scram for preparation of Data l
S= Scheduled B= Maintenance or Test 3= Automatic Scram Etitry Sheets for Licensea C= Refueling 4rContinuations Event Report (LER) File l
D= Regulatory Restriction E= Operator Training & License Examination 5= Load Reduction (NUREG-OI61)
F= Ad:ninistrative 9=Other 5:
G= Operational Error Exhibit H - Sa w Source H=Other (explain)
i Page 1
O f
_1 UNIT Dl!UTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.t 50-339 Report Month Apr_il Unit Names NA-2 Yeart-1991 Datet liny 1.
1991 completed by:
Cathie Mladen
- llo entry this month l
l l
I l
1 l
l
NORTil ANNA POWER STATION UNIT NO.I 2
MONTill April i
MMMARLQF_DEEBhTING EXEERICHRE Listed below in chronological acquence in a
nummary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents, i
1 DAt1 Ti!R9 Data April 01, 1991 0000 Began month with unit at 100%,
903MWo.
April 05, 1991 0854 Commenced unit ramp down for TVFT.
0934 Unit stable at 877MWo.
1130 TVFT completed natiofactorily.
1200 Commenced unit ramp up to 98% for 2-PT-24.1, NI calibration.
1224 Unit stable at 98%.
1244 Completed 2-PT-24.1 and commenced unit ramp up to 100%.
j 1259 Unit stable at 100%.
2202 IB feedwater heater on divert to condenser in preparation for accuring B
high pressure heater drain pump for maintenanco.
2214 Secured B high pressure heater drain pump.
April 06, 1991 1321 Returned B
high pressure heater drain pump to service.
l April 30, 1991 2400 Ended month with unit at 100%,
960MWo.
,