ML20077B802
| ML20077B802 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 07/11/1983 |
| From: | Lempges T NIAGARA MOHAWK POWER CORP. |
| To: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20077B795 | List: |
| References | |
| NMP-6852, NUDOCS 8307250438 | |
| Download: ML20077B802 (1) | |
Text
-
d M V NIAGARA RUMOHAWK nup_6852 NINE MILE POINT NUCLEAR STATION /P.O. BOX 32 LYCOMING, NEWYORK 13093 / TELEPHONE (315) 343-2110 July 11 1983 Richard W. Starostecki, Ditector Division of Project and Resident Programs United States Nuclear Regulatory Comnission Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406 RE: Docket No. 50-220 Inspection Report 83-08
Dear SLt. Starostecki,
This refers to the routine, safety inspection conducted by FLt. S. Hudson of tjout staff on April 1-30, 1983 at Nine blite Point Unit H1, Scriba, New York of activities authorized by NRC License No. DPR-63, and to.the discussions of your findings held by FLt. S. Hudson witli Alt. T. Roman of our staff at the conclusion of tJze inspection.
Item A Technical Specification 6.8.1 states in part:
" Written procedures and administrative policies shall be established, implemented and maintained..." Administrative procedure APN-7A, " Placement of Jumpers and Blocks or Lifting of Leads", Revision 8 dated September 7, 1982, Section 4.1, requires that jumpers be identified with a serial number. Section 4.3.3 states in part:
"After restoration, the person performing and the person verifying shall sign the jumper / block log..."
Conttary to the above, on April 27, 1983, two jumpers - one of which a not numbered - were found.to be installed although jumper tog #1392 indicated.that they were removed on April 13, 1983.
RESPONSE
This incident m discussed with.the individuals involved and the importance of strict adherence to the jumper / block Log ptocedures APN-7A m sttessed. The ptocedure uns also reviewed with them. Subsequent to titis event a review of all safety related systems uns performed ptior to start up which assured that no other unauthorized jumpens or lifted leads existed.
V t uly eours,
Thomas E. Lempgesl 49WL4-u Vice President Nuclear Generation TEL/DK/bg 1