ML20077B802

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Rept 50-220/83-08.Corrective Actions:Jumper/Block Log Procedures Reviewed W/Individuals Involved & All safety- Related Sys Performed Prior to Startup Evaluated
ML20077B802
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/11/1983
From: Lempges T
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20077B795 List:
References
NMP-6852, NUDOCS 8307250438
Download: ML20077B802 (1)


Text

-

d M V NIAGARA RUMOHAWK nup_6852 NINE MILE POINT NUCLEAR STATION /P.O. BOX 32 LYCOMING, NEWYORK 13093 / TELEPHONE (315) 343-2110 July 11 1983 Richard W. Starostecki, Ditector Division of Project and Resident Programs United States Nuclear Regulatory Comnission Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406 RE: Docket No. 50-220 Inspection Report 83-08

Dear SLt. Starostecki,

This refers to the routine, safety inspection conducted by FLt. S. Hudson of tjout staff on April 1-30, 1983 at Nine blite Point Unit H1, Scriba, New York of activities authorized by NRC License No. DPR-63, and to.the discussions of your findings held by FLt. S. Hudson witli Alt. T. Roman of our staff at the conclusion of tJze inspection.

Item A Technical Specification 6.8.1 states in part:

" Written procedures and administrative policies shall be established, implemented and maintained..." Administrative procedure APN-7A, " Placement of Jumpers and Blocks or Lifting of Leads", Revision 8 dated September 7, 1982, Section 4.1, requires that jumpers be identified with a serial number. Section 4.3.3 states in part:

"After restoration, the person performing and the person verifying shall sign the jumper / block log..."

Conttary to the above, on April 27, 1983, two jumpers - one of which a not numbered - were found.to be installed although jumper tog #1392 indicated.that they were removed on April 13, 1983.

RESPONSE

This incident m discussed with.the individuals involved and the importance of strict adherence to the jumper / block Log ptocedures APN-7A m sttessed. The ptocedure uns also reviewed with them. Subsequent to titis event a review of all safety related systems uns performed ptior to start up which assured that no other unauthorized jumpens or lifted leads existed.

V t uly eours,

Thomas E. Lempgesl 49WL4-u Vice President Nuclear Generation TEL/DK/bg 1