e.. <.
M SEABROOK STAT 1M
% ome 1671 Wortad*' E**d
%g., ganachuwets 01701 Public Service of New Hampshire (617.s72.s100 July 14, 1983 S BN-532 T.F. Q2.2.2 United States Nuc. ear Regulatory Commission 1
Region I 631 Park Avenue King of Prussia, PA 19406 Attention:
Mr. Richard W. Starostecki, Director Division of Project and Resident Programs Ref erence s:
(a) Construction Permit CPPR-135 and CPPR-136, Docket Nos. 50-443 and 50-444 (b) Telecon of November 10, 1982, A. L. Legendre (YAEC) to Eugene Kelly (NRC Region I)
(c)
PSNH Letter, dated December 14, 1982, " Interim 10CFR50.55(e) Report; Tornado Missile Shields for Fuel Storage Building," J. DeVincentis to R. P. Starostecki (d) PSNH Letter, dated March 31, 1983, " Interim 10CFR50.55(e)
Report; Tornado Missile Shields for Fuel Storage Building," J. DeVincentis to R. W. Starostecki
Subject:
Interim 10CFR50.55(e) Report; Tornado Missile Shields for Fuel l
Storage Building l
Dear Sir:
On November 10, 1982, we reported a potential 10CFR50.55(e) deficiency l
[ Reference (b)] regarding the adequacy of Tornado Missile Shield protection on the North and West walls of the Fuel Stornge Building.
In Reference (c), we provided an interim report on this item and indicated that we would submit another report by April 1, 1983.
In Reference (d), we provided the status and efforts taken to date to resolve this concern and committed to submit a report by July 15, 1983.
As mentioned in Reference (d), probability analyses are underway to determine if any of the potential missile " windows" can be disregarded on the basis that there is an extremely low probability that a missile could enter and damage a safety-related system or component. These analyses are continuing and are now scheduled to be complete by November 30, 1983, at which time a report on this subject will be issued.
8307220572 830714 PDR ADOCK 05000443 S
PDR 1000 Elm St., P.O. Box 330, Manchester, NH 03105 Te ephone (603) 669-4000 TWX 7102207595
-y g
If0
o.
7 United States Nuclear Regulatory Commission July 14, 1983 Attention:
Mr. Richard W. Starostecki Page ?.
This letter is being filed pursuant to the interim reporting provision of 10CFR50.55(e)(3).
Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY J. DeVincentis Project Manager MH0/bal cc: Atomic Safety and Licensing Board Service List Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 i