OPERATING DATA REPORT DOCKET No. 50 - 277 DSTE APRIL 12, 1983 COMPLETED BY PHILADELPHIA ELECTRIC COMPAhY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DITISION-NUCLEAR i
TELEPHONE (215) 841-5022 a
OPERATING STATUS
- 1. UNIT NAME: PEACH BOTTOM UNIT 2 i NOTES: UNIT 2 EXPERIENCED ONE -
l g
g i
- 2. REPORTING PERIOD:
MARCH, 1983 g
SCHEDULED LOAD REDUCTION, l
g g
3293 g
ONE FORCED AND TWO SCHEDULED l
- 3. LICENSED THERMAL POWER (MWT) :
g I
4 NAMEPLATE RATING (GROSS MWE) :
1152 l
SHUTDOWNS.
(
g l
S. DESIGN ELECTRICAL RATING (NET ENE):
1065 I
i g
g
- 6. RAIINUR DEPENDABLE CAPACITY (GROSS RWE): 1098 l
[
g i
- 7. MAIIMUM DEPENDA8LE CAPACITY (NET RWE):
1051 l
[
[
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS -(ITERS NUMBER 3 THROUGH 7) SINCE LAST REFORT, GIVE REAS0J 4
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANT (NET BWE):
4
- 10. REASONS FOR RESTRICTIONS, IF ANT:
THIS NONTH TR-70-DATE CUNULATIVE 744 2,160 76,608
- 11. N00RS IN REPORTING PERIOD
~~
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 550.2 1,958.9 57,048.6 l
- 13. REACTOR RESERVE SHUTDOWN NOURS 0.0 0.0 0.0 523.6 1,919.4 55,468.3
[
- 14. HOURS GENERATOR ON-LINE
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERNAL ENERGY GENERATED (MVH) 1,600,848 6,112,656 162,621,628
- 17. GROSS ELECTRICAL ENERGY GENERATED (RNH) 526,220 2,023,810 53,544,320
- 18. ~ NET ELECTRICAL ENERGY GENER ATED (RWH) 505,699 1,948,837 51,333,986 70.4 88.9 72.4
- 19. UNIT SERVICE FACTOR f-
- 20. UNIT AVAILABILITY. FACTOR 70.4 88.9 72.4
- 21. UNIT CAPACITY FACTOR (USING RDC NET) 64.7 85.8 63.8
- 22. UNIT-CAPACITY FACTOR (USING DER NET) 63.8 84.7 62.9-e rg g.
0.7 1.2 7.5
" L
- 23. UNIT FORCED OUTAGE RATE l.
-24. SHUTDOWNS SCHEDULED OVER NEIT 6 NONTHS (TYPE, DATE, AND DURATION OF EACH):
L
, G
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTINATED DATE OF STARTUP i Mu j tiO (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED
-- @l$1
- 26. UNITS IN TEST STATUS
' INITIAL CRITICALITY WLDC INITIAL ELECTRICITY CONMERCIAL. OPERATION
-e imm,=
n w-
.,,.--w
-,,w-,,,,wr,
.,..y-,,
hev-v
n w
v
++-*-nwupyir-e-yv=--1*r w-v+-ww y-iw-+e
-w-gv--
w-w-s-i--
-"****rtN*"
st--9*W----'
-'w-d-V
CPERATING DATA REPORT DOCKET NO. 50 - 278 DATE APRIL 12, 1983 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY
=_._
V.R.ALDEN ENGINEER _IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 OPERATING STATUS
'1. UNIT,NAME: PEACH DOTTOM UNIT 3 l NOTES: UNIT 3 CONTINUED SCHEDULED l
g
- 2. REPORTING PERIOD:
MARCH, 1983 l
SHUTDOWN FOR REFUELING.
l g
g
- 3. LICENSED THERM AL POWER (NWT) :
3293 l
l g
g 4 NAMEPLATE RATING (GROSS MWE) :
1152
-l l
g
- 5. DESIGN ELECTRICAL RATING (NET MUE) :
1065 l
l g
g
- 6. MAXIMUM DEPENDADLE CAPACITY (GROSS MWE): 1098 l
l g
g
- 7. MAXIMUM DEPENDABLE CAPACITY (NET RVE) :
1035 l
l
==.___________.__...__.-
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITERS NURSER 3 TMROUGH 7) SINCE LAST REPORT, GIYE REASONS 9._ POWER LEVEL TO WHICH RESTRICTED, IF ANT (NET RNE) :
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS MONTH YB-To-DATE CUBULATIVE
- 11. HOURS IN REPORTING PERIOD 744 2,160 72,504
=___.__.
0 1,039.3 54,969.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN BOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 0.0 1,026.3 53,627.1
~
- 15. UNIT RESERVE SHUTDOWN BOURS 0.0 0.0 0.0
.___.==
- 16. GROSS THERNAL ENERGY GENERATED (NUH) 0 2,742,355 155,957,983
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 894,560 51,136,090
- 18. NET ELECTRICAL ENERGY GENERATED (BWB)
-7,435 841,454 49,084,246
- 19. UNIT SERVICE FACTOR 0.0 47.5 74.0 120. UNIT AVAILABILITY FACTOR 0.0 47.5 74.0 2,1. UNIT CAPACITY FACTOR (USING EDC NET) 0.0 37.6 65.4
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 -
36.6-63.6 0.0 2.6 7.3
- 23. UNIT FORCED OUTAGE RATE
- 24. SHUTDOWNS SCHEDULED OVER NEIT 6 50NTHS (TYPE, DATE, AND DURATION OF EACB):
SCHEDULED Sr.JTDOWN FOR REFUELING AND NAINTBNANCE, STARTED 2/13/83, FOR ELEVEN WEEK OUTAGE.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTINATED DATE OF STARTUP:
5/2/83
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) :
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
L+..
+,
i UNIT SHUTDOWNS AND POWER REDUCTIONS DDCKET No. 50 - 277 UNIT NANG PEACH BOTTDM UNIT 2 DATE APRIL 12, 1983 REP 0kT MONTH MARCH, 1983 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLE AR SECTIDN GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 l
I l
l l METHOD OF i LICENSEE ISYSTEMICOMPONENil CAUSE AND CORRECTIVE j
i ITYPElDURATIONtREASONISHUTTING 00WN1 EVENT l CODE I CODE l ACTIDN TO NU.1 DATE I (111 (HOURS)l (2) i REACTOR (3) l REPORT s 1 (4) l (5) l PREVENT RECURRENCE r,
I i
1 l
I I
I I
I 4 1 630304 l 51 00.0 l
H l 4
l NA I RC l ZIll2Z l LDAD REDUCTION FOR CONTADL ROD PATTERN I
I I
i i
l l
l l ADJUSTNENT.
1 I
I i
1 1
I I
i 5 1 830317 i F i 3.6 l
H l 3
i NA B Es l ELECON l UNPLANNED SCRAM DUE TO LOSS OF #1 l
l l
l l
l l
l l 13 KV AUXILIARY SUS.
I I
I I
I I
I I
i 5 l 830317 I SI 51.3 1
A I 4
l NA l CC i VALVEX l SHUTDOWN CONTINUED FOR REPAIR OF 71 G l
l l
l l
l l
l l RELIEF VALVE. SHUTDOWN NOW TERMED I
l I
l l
I 1
l l MAINTENANCE OUTAGE.
I l
l I
l l
l l
l l
ol 830323 1 S l 165.5 l
A i 1
l NA I AA 1 HTEXCH I SHUTDOWN TO REPAIR FEEDWATER HEATER i
i i
l i
I I
i 1
l STRING LEAK.
i i
l i
i I
i l
1 l
l l
l l 220.4 l
l l
l l
l v
%W 4
(13 (2) g33 g43
]
F - FORCED RE ASON METHOD EXHISIT G - INSTRUCTIONS l
S - SCHEDULED A - EQUIPMENT FAILURE (EAPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - M AINT EN ANCE OR T EST 2 - MANUAL SCRAM.
ENTRf SHEETS FOR LICENSEE i
3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
C - REFUELING
~
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAINI FILE INUREG-0161 )
E - OPER ATOR TRAINING + LICENSE EXAMINAT ION (5)
F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN) n - OTHERIEXPLAIN)
EXHIBIT I - SAME SOURCE O
e
UNIT SHUTDONNS AND PONER REDUCTIONS DOCERT NO. 50 - 278 UNIT NARE PEACR BOTTOR UNIT 3 DATE APRIL 12, 1983 REPORT BONTH 54RCH, 1983 COBPLETED BY PHIL&DELPBI& ELECTRIC CORP &MY v.s.&LDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NGCLR&B TELEPHONE (215) 841-5022 1
I i
1 i HETHOD OF I LICENSEE ISYSTEMICORPONENT! C&GSE AND CORRECTIVE I
ITYPEIDURATIONIREASONISHUTTING DONNI EVENT l CODE I CODE I ACTION TO NO.!
DATE I (1) I (HOURS)I (4 i REACTOR (3) i REPORT 8 I (4) 1 (5) l PREVENT RECURRENCE 1
I i
1 l
I
'l I
I 3 1 830301 i S I 744.0 l
C l 1
i NA I RC i FGELXX l CONTINUING EEFUELING OUT&GE.
1 1
1 I
I I
I I
I 1
I I 744.0 1
I I
I I
I t
( I)
(2)
(3)
(4) l F - FORCED REASON METHOD EIMIBIT G - INSTRUCTIONS S - SCHEDULE 3 A - EQUIPHENT FAILURE (EIPLAIN) 1 - HANUAL FOR PREPAR& TION OF DATA i*
B - MAINTEN ANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SEEETS FOR LICENSEE C - REFUELING 3 - AUTORATIC SCRAM.
EVENT REPORT (LER)
D. REGULATORY RESTRICTION 4 - OTHER (EIPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE BIARINATION P - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EIPLAIN) l*
H - OTHER (EIPLAIN)
EIHIBIT I - SAME SOURCE i
w me e
4 9
e D
9
A 1 AGE DAILY UN11 POWER LEVE DOCKET NO. 50 - 277 UNIT PbALH 8OTTOM UNIT 2 DATE APRIL 12 e 1983 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH MARCH 1983 OAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-N ET )
1 1050 17 387 2
1051 18 0
3 1032 19 109 4
1000 20 773 5
1054 21 924 e
1055 22 747 7
1054 23 0
8 1056 24 0
9 1056 25 0
10 1053 26 0
j 11 1056 27 0
l 12 1055 28 0
13 1055 29 0
14 1054 30 525 15 1056 31 867 16 1054
AVERAGt
>AILY UNIT POWER LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 1983 DATE APRIL 12,
COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENER AT ION DIVI SION-NUCLE AR TELEPHONE (215) 841-5022 MONTH MARCH 1983 DAY AVERAGE DA3LY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (M W E-N ET )
(MWE-NET) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
b 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
Docket No 50-277 4~
Attachment to Monthly Oparating Report For Month of March, 1983 REFUELING INFORMATION 1.
Name of Facility:
Peach Bottom Unit'2 2.
Scheduled date for next refueling shutdown:
October 15, 1983 3.
Scheduled date for restart following refueling:
January 14, 1984 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes If answer is yes, what, in general, will these be?
Technical Specifications to accommodate reload fuel.
Modifications to reactor core operating limits are expected.
5.
Scheduled date(s) for submitting proposed licensing action and
. supporting information:
September 30, 1983 6.
Important licensing considerations associated with refueling, e.g.,-new or different fuel design or supplier, unreviewed design or performance analysis m'ethods, significant changes in fuel design, new operating procedures:
None expected 7.
The number of fuel assemblies (a) in the core, and (b) in the spent fuel storage pool:
(a)
Core - 764 Fuel Assemblies (b)
Fuel Pool - 1170 Fuel Assemblies, 58 Fuel Rods 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
March, 1990 (September,-1985 with reserve for full core discharge)
,f' Dockot No. 50-278
,/
Attachm:nt to Monthly Op3 rating Rnport For Month of March, 1983 REFUELING INFORMATION 1.
Name of Facility:
Peach Bottom Unit 3 2.
Scheduled date for next refueling shutdown:
February 13, 1980 3.
Scheduled date for restart following refueling:
May 2, 1983 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes If answer is yes, what, in general, will these be?
Technical Specifications to accommodate reload fuel.
Modifications to reactor core operating limits are expected.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
Submitted December 30, 1982 6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, now operating procedures:
None expected 7.
The number of fuel assemblies (a) in the core, and (b) in the spent fuel storage pool:
(a)
Core - 764 Fuel Assemblies (b)
Fuel Pool - 928 Fuel Assemblies, 6 Fuel Rods 8.
'The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
September, 1990 (March,~1986 with reserve for fuel core discharge)
t Peach Bottom Atomic Power Statio'n Narrative Summary of Operating Experiences MARCH, 1983 UNIT 2 The unit began the month at full power.
On March 4, a load drop was taken for control rod pattern adjustment.
The reactor scrammed on March 17 due to low turbine electro-hydraulic control fluid pressure.
This resulted from the loss of the il 13KV Bus which was caused by workmen bumping bus protective relaying.
The unit was returned to ppwer on March 18 and achieved full power on March 21.
Feedwater heater leakage forced power reduction then removal of the 4
unit from service on March 23.
During this outage, both ECCS logic power supplies were replaced with.the improved design "GE" power supplies and the 71G main steam relief valve was replaced.
The unit was returned to service on March 29 and achieved full power on April 1.
UNIT 3 The unit continues it its fifth refueling outage.
On March 3, an inadvertent ECCS activation resulted in an injection into the reactor vessel.
Approximately 60,000 gallons of water over-flowed from the reactor cavity / fuel pool, damaging I
l reactor building ventilation ductwork and wetting lower l
elevations.
The ductwork has been repaired and decontamination l
of reactor building lower elevations. continued throughout the month.
Control rod blade and drive changeout is complete.
The main turbine rotor inspections have been completed and reinstallation i
of the generator rotor begur.,
Power range neutron detector replacement is in progress.
To date, the induction heating stress improvement process has been performed on 58 recirculation system and residual heat removal system welds.
1 r
rw,-
w y w
w a
m r
..\\
PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 (215)8414000 April 13, 1983 Docket Nos: 50-277 50-278 Director Office of Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Attention:
Document Control Desk
SUBJECT:
Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:
Attached are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of March, 1983 forwarded pursuant to Technical Specification 6.9.1.C under the guidance of Regulatory Guide 10.1, Revision 4.
Very truly yours,
/ t
/ ;64 % -
M Cooney
[/
erintendent l
N clear Generation Division Attachment l
cc:
Mr. J. M. Allan, NRC Mr. A.
R.
Blough, NRC Site' Inspector Mr.
S.
P. Mangi, Dept. of Envir. Resources
.s 0?1Nk k
s_
.gae
.. p.
pd,c, j J
V T
'I I
_