Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures HP/O/B/1009/02 Re Alternate Method for Determining Dose Rate within Reactor Bldg & PT/O/A/4600/06 Re Exercises & Drills
ML20076M103
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 08/30/1983
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20076M102 List:
References
NUDOCS 8310110077
Download: ML20076M103 (2)


Text

e .

l i

I Duxn Pownn Comusy 18.0. HO.4 331f30 CILtitto RTE. N.C. 2152 4 2 ,

j m,. ,, n o y, HALu.Trcnna t704p 37a-4s:n

" " = = "

=ensaa rannosvrus, August 30, 1983 Mr. Earold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Conmission Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: McGuire Nuclear Station I Docket Nos. 50-369, 50-370

Dear Sir:

Enclosed for NRC Staff use and review are two copied of the latest revisions to the following McGuire Nuclear Station Emergency Plan Implementing Procedures:

1) RP/0/A/5700/05 " Care and Transportation of Contaminated Injured Individual (s) from Site to Offsite Medical Facility" (changes 0-0, dated August 3, 1983)
2) HP/0/B/1009/02 " Alternate Method for Determining Dose Rate within the Reactor Building" (changes 0-0, dated July 20, 1933)
3) HP/0/B/1009/03 " Recovery Plan" (changes 0-1, dated July 13, 1933)
4) PT/0/A/4600/06 " Exercises and Drills" (changes 0-0, dated July 20, 1933)
5) PT/0/A/4600/ll " Function Check of Emergency Vehicle and Equipment" (changes 0-2, dated July 13, 1983)
6) OP/1/A/6200/48 ' " Operating Procedure for the Operation of the Pcst Accident Liquid Sample Systen - Unit 1" (changes 0-2, dated August 5, 1933)

Also included are two loose leaf binders entitled Crisis Management flan Implementing Procedures, Volu=c 3. These are being provided to enable expansion of the implementing procedures into three volumes.

These revisions are being submitted in accordance with 10 CFR 50.3a(q) and do not decrease the effectiveness of the Energency Plan Implementing Precedures.

By copy of this letter, one binder and one copy of eaca of the above documents are being provided to the NRC, Region II.

Very truly yours, a /

, d /.,dAcMhv ' ' -

a;) $

Hal 3. Tucker 'd.

/. 'e f / ,' -

. l' I ,

WHM/php G310110077 831007 Enclosures PDR ADOCK 05000369 PDR F .-

o .

Mr. Harold R. Denton, Direttor August 30, 1983 Page 2 cc: (w/ Enclosure)

Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303 (w/o Enclosure)

Mr. W. T. Orders NRC Resident Inspector McGuire Nuclear Station

- - . - .