ML20076K789

From kanterella
Jump to navigation Jump to search
Ro:On 830704,during Routine Tour of Containment,Leak Discovered in Nonessential Svc Water Sys.Written Rept Will Be Forwarded within 14 Days,Per IE Bulletin 80-24
ML20076K789
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/05/1983
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-80-24, NUDOCS 8307180104
Download: ML20076K789 (1)


Text

,- e

,,,, IN0 LANA & MICHIGAN ELECTRIC _ COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465 5901 July 5, 1983 Mr. J.G. Feppler, Ibgional Administrator thited States Nuclear Regulatory Cbmmission Region III 799 Roosevelr. Road Glen Ellyn, IL 60137 Operating License DPR-74 Ibcket No. 50-316

Dear Mr. I@ppler:

'Ihis is to confirm my verbal report to your Mr. N.E. DuBry, ?EC Resident Inspector, on July 4,1983, at 1049 hours0.0121 days <br />0.291 hours <br />0.00173 weeks <br />3.991445e-4 months <br />, at which time I informed him that during a routine tour of the thit 2 Containment a leak was dis-covered in the Nonessential Service Mter Systen. As rapiired by the criteria established in IE Bulletin 80-24, pronpt notification was made to the IEC which entailed notifying the Resident Inspector and making a red phone call (1052).

As required by IE Bulletin 80-24, a written report will be forwarded to  !

you within 14 days. I Sincerely, W.G. Snith, Jr.

Plant Manager

/bab cc: John E. Iblan M.P. Alexich R.S. I!unter R.F. Kroeger B. GeImano 4 E.R. Swanson/N.E. DuBry, RO:III ,

na$ R.C. Callen, MPSC 1g" G. Charnoff, Esq.

@@ J.M. Hennigan Lm R.O. Bruggee, EPRI

/ ItEC

$2 PNSRC

("b J.F. Stietzel

$$ E.L. Townley , h b Dir., IE (40 copies)

Dir., MIPC (4 copies) o