ML20076K282

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Changes to Emergency Plan Implementing Procedures.W/O Encl
ML20076K282
Person / Time
Site: Fort Calhoun 
Issue date: 07/21/1983
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20076K267 List:
References
LIC-83-176, NUDOCS 8309140257
Download: ML20076K282 (1)


Text

i Omaha Public Power District 1623 Harney Omaha, Nebraska 68102 402/536 4000 July 21, 1983 LIC-83-176

@@h Mr. J.

T.

Collins, Administrator Ju.2 5 953 lj U.

S.

Nuclear Regulatory Commission Region IV J

611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

Reference:

Docke t No. 50-285

Dear Mr. Collins:

Pursuant to 10 CPR 50, Appendix E,

Section V, five (5) copies of changes to the Fort Calhoun Station Emergency Plan Implementing Procedures are being provided to the Commis-sion.

Three (3) copies (for control copy numbers 154, 155, and 156) are provided for your office.

Two (2) copies (for control copy numbers 165 and 166) have been provided to the Document Control Desk in Washington, D.C.

A transmittal sheet is provided for each copy to confirm receipt of the serialized document.

It is requested that these sheets be ccmpleted and returned within five (5) days of receipt.

Since ely,

)

W.

C.

<bnes Divisi]p' ion Operations Manager Producr WCJ:jmm nm Enclosures

$8 Mo cc:

Document Control Desk GQ U.

S.

Nuclear Regulatory Commission g

Washington, D.C.

20555 no 00 LeBoeuf, Lamb, Leiby & MacRae Z$

1333 New Hampshire Avenue, N.W.

$g Washington, D.C.

20036 no*

Mr.

L.

A.

Yandell, Senior Resident Inspector

-/V c5 Employmengt Qua10pportunity I

45 5124

.--