ML20076K091

From kanterella
Jump to navigation Jump to search
Requests to Schedule Listed Depositions Per ,Upon Reviewing Schedule of Availability.Related Correspondence
ML20076K091
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/10/1994
From: Lamberski J
GEORGIA POWER CO., TROUTMANSANDERS (FORMERLY TROUTMAN, SANDERS, LOCKERMA
To: Barth C
NRC OFFICE OF THE GENERAL COUNSEL (OGC)
References
CON-#494-15794 OLA-3, NUDOCS 9410270153
Download: ML20076K091 (2)


Text

A h p.gf) CORRESPONDENCE TROUTMAN SAN 9ERStra

~

a past e

ir

=

0=$ en nats ma cceec 5

N A?1CNSBANK PL AZ A 4300 PEACHTREE STREET. N E SUtTE 5200 j

ATLANTA. GEORGIA 30308 g4 g 11 P 20 TELE PHONE: 404 885-3000 FACSMLE 404 885 3900 JOHN LAMBERSKI DIRE CT 404-885 3360

_nn S RVG i

10,1994.rJE T OG -

October Bk nhi.H 4

I i

Charles Barth, Esquire Office of General Counsel i

One White Flint North i

Stop 15B18 U.S. Nuclear Regulatory l

Commission Washington, D. C. 20555 4

j Re:

Georgia Power Company (Vogtle Electric Generating Plant, Units 1 and 2)

{

NRC Docket Nos. 50 424-OLA-3, 50-425-OLA-3; License Amendment for Transfer to Southern Nuclear Operating Company l

Dear Charles:

1 l

We have reviewed the schedule of availability of NRC employees provided in your October 5,1994 letter and wish to schedule the following depositions at this time:

1.

Mr. Pete Taylor, October 19, 8:30 a.m., in the NRC's Region II offices in

}

Atlanta.

i 2.

Mr. Al Chaffee, October 21, 8:30 a.m., in the NRC's White Flint North l

offices in Rockville.

l 3.

Mr. Ken Brockman, October 26, 8:30 a.m., in the NRC's White Flint North offices in Rockville.

l Georgia Power will arrange for a court reporter for each of these depositions.

i 1

{

Georgia Power plans to conduct the depositions of Messrs. Ebneter and Robinson i

following the three depositions identified above on a schedule to be discussed with the NRC i

Staff.

I 1

i i

i 9410270153 94101o PDR ADOCK 05000424 o

,}6y)

O PDR i

b' TROUTMAN SANDERS j

ra.: Inca:.htw,=

1 Charles Barth, Esquire October 10, 1994 i

Page 2 i

1 Your October 5 letter also stated that the "88 inches" of NRC material in the Region jl II offices would not be available to the parties for inspection and copying "for some time."

l Georgia Power assumes that this material will not be made available prior to dates for the l

depositions listed above.

4 e

s

{

Very

yours, 1

1

.A 2

l John Lamberski i

i i

1 J

l i

cc:

Service List j

1 4

A J

i i

1 i

b i

4