Ca'a u tPlant Past Offce Box b?O M
fG'!ali ib3DJfr b5?bI October 11,1994 Uniou Euscnac P3 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ULNRC-3084
Dear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT SEPTEMBER.1994 The enclosed Monthly Operating Report for September,1994 is submitted pursuant to section 6.9.1.8 of the Callaway Unit i Technical Specifications.
I eS&W l
J. D. Blosser g
Manager, Callaway Plant f
ts JOB /h'EB/JA "/F..M/ J.'. ':rd
/
Enclosure l
cc: Distribution attached
- cc
- s. o u... A,
b CI C O f Q g T, g
l i
'ec distribution for ULNRC-3084 I
with enclosures Mr. M. J. Farber, Chief Reactor Projects Section 3C U.S. Nuclear Regulatory Commission Region III 801 Warremille Road Lisle, IL 60532-4351 i
Mr. L. R. Wharton (2 copics)
OfIice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 1155 Rockville,MD 20852 NRC Resident Inspector Manager, Electric Department Missouri Public Senice Commission P.O. Box 360 JefTerson City, MO 65102 I
t 5
i i
f i
i t
}
~
s
' DOCKET NO.
50-483 i
UNIT NAME CALLAWAY UNIT I DATE 10/10/94 COMPLETED BY J. B. McInvale TELEPliONE 314/676-8247 i
PART A OPERATIONS
SUMMARY
The plant operated at approximately 100% power for the month of September with the following exception:
Power was reduced to 97% briefly for instrument calibrations on 9-9-94 and 9-30-94.
PART B PORV AND SAFETY VALVE SUMAMRY r
None P
i i
l l
Page1of4
PART C I
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO
$0-483 UNIT Callaway Unit 1 DATE 10/10/94 COMPLETED BY J. B. McInvale TELEPHONE 314/676-8247 MONTil: SEirTEMBER 1994 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL D_AY (MWc-Net)
DAY (MWe-Net) 1 1155 17 1147 2
1153 18 1147 3
1152 19 1146 4
1146 20 1146 5
1136 21 1144 6
1147 22 1154 7
1150 23 1160 8
1147 24 1159 9
1137 25 1159 10 1140 26 1156 l
11 1140 27 1156 12 1136 28 1153 13 1131 29 1149 14 1129 30 1120 15 1130 16 1138
)
I l
Page 2 of 4 l
l l
PART D OPERATING DATA REPORT DOCKET NO. 50-483 UNIT NAME CALLAWAY UNIT I DATE 10/10/94 COMPLETED BY J. B. McInvale TELEPHONE 314/676-8247 OPERATING STATUS (YTD) (CUM) 1.
REPORTING PERIOD. SEPTEMilER 1994 GROSS llOURS IN REPORTING PERIOD: 720 6551 85,716.5 2 CURRENTLY AUTIIORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1115 DESIGN ELECTRICAL RATINO (MWe-Net): 1171 3.
POWER LEVELTO WillCil RESTRICTED (IF ANY)(MWe-Net):
4.
REASONS FOR RESTRICTION (IF ANY):
h
'O R YR TO DATE CUMULATIVE 5.
NUMBER OF llOURS REACTOR WAS CRITICA1....
720 6551 75,497.7 6.
REACTOR RESERVE SilUTDOWN llOURS...
0 0
0 7.
IlOURS GENERATOR ON LINF 720 6,517.7 74,072.8 8.
UNIT RESERVE SlIUTDOWN liOURS..
0 0
0 9.
GROSS TIIERMAL ENERGY GENERATED (MWII)...
2,549,205 22.875,126 249,740,214 10.
GROSS ELECTRICAL ENERGY GENERATED (MWil)...
864.248 7,801,545 85,172.668 11.
NET E11CTRICAL ENERGY GENERATED (MWil) 824,732 7,447,077 81,011,128 12.
REACTOR SERVICE FACTOR.....
100.0 100.0 88.1 13.
REACTOR AVAILABILITY FACTOR.
100.0 100.0 88.1 14.
UNIT SERVICE FACTOR.
100.0 99.5 86.4 15.
UNIT AN 0./HilJTY FACTOR 100.0 99.5 86.4 16.
UNIT CAPACFFY FACTOR (Using MDC).
102.7 102.0 84,8 17.
UNIT CAPACITY FACTOR (LMng Design MWe)...
97.8 97.1 80.7 18 UNIT FORCED OUTAGE RATE 0.0 0.0 232 19.
SIIUTDOWNS SCIIEDUlID OVER NEXT 6 MONTils (TYPE, DATE, AND DURATION OF EAcil): Refueling Date: 30195 Duration: 56 days 20.
IF S1IUT DOWN AT END OF REIORTING PERIOD, ESTIMATE DATE OF STARTUP: N/A 1
Page 3 of 4
.I J
i t
PART E LNIT SIIUTD0%3S AND PO%TR REDUCTIONS DOCKET No.
50-483 UNIT NAME CALIAWAY LWIT 1 DATE 10/1034 COMPLETED LY J. B. McInvale TELEPIIONE 314 676-8247 REPORT MONTII: SEPTEMBFR1994 METIIOD OF TYPE SIIUITING D0%W F: FORCED DURATION Tile REACTOR OR E
DATE S: SCIIEDULED (IIOURS)
REASON REDUCING POWER CORRECTIVF/ ACTIONS COMMENTS
SUMMARY
REASON METIIOD A EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B: MAINT.ORTEST
' 2: MANUALSCRAM C: REFLTLING 3: AUTOMATIC SCRAM D; REGULATORY RESTRICTION 4: OTIIER(EXPLAIN)
E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATION 0: OPERATIONAL ERROR (EXPIAIN)
IL OBIER(EXPLAIN)
Page 4 of 4
..