ML20076E734
| ML20076E734 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 05/16/1983 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Sternberg D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| REF-PT21-83 10CFR-050.55E, 10CFR-50.55E, ANPP-23759-BSK, DER-82-78, NUDOCS 8306010272 | |
| Download: ML20076E734 (3) | |
Text
.
HECENED NGC Arizona Public Service Company'
!,?
P J GOX 21666 e PHOENIX. art 2ONA 85036 May 16, 1983 a
ANPP-23759-BSK)ggggg y p~ ~
RQT U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. D. M. Sternberg, Chief Reactor Projects Branch 1
Subject:
Final Report - Revision 2 - DER 82-78 A 50.55(e) Reportable Condition Relating to Improperly Crimped Termination Lugs In Control Panels For Water Chillers By Carrier Air Conditioning File: 8 3-019-026 ; D.4.33.2 Re fere nc e : A) Telephone Conversation between T. Young and J. Cook on December 17, 1982 B) ANPP-22734, dated January 17, 1983 (Final Report)
C) ANPP-23443, dated April 6,1983 (Final Report - Revision 1)
Dear Sir:
Enclosed is revision two of the subject Deficiency Evaluation Report under the requirements of 10CFR50.55(e). This revision provides the current status of equipment affected under condition description.
Very truly yours,,
k s m (Q
c'OLll E. E. Van Brunt, Jr.
APS Vice President, Nuclear Projects Management ANPP Project Director EEVB/RQT:db Enclosure cc:
See Page 2 8306010272 8'30516 PDR ADOCK 05000528 g l S
PDR hM7
F
]
Mr. D. M. Sternberg ANPP-23759-RQT/BSK May 16, 1983 Page 2 cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum P. P. Klute/D. D. Green A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli l
l l
l I
l
e e
FINAL REPORT - DER 82-78 DEFICIENCY EVALUATION 50.55(e) l ARIZONA PUBLIC SERVICE COMPANY (APS)
PVNGS UNITS 1, 2 & 3 1
- I.
DESCRIFIION OF DEFICIENCY i
I During surveillance activity and random inspection of the Unit 2 Control Building Chiller Control Panels 2J-ECA-E01, 2J-ECB-E02, 2J-ECA-E03 and 2J-ECB-E04 supplied by Carrier Air Conditioning, it I
was found that electrical terminations did not comply with the visual inspection criteria for the included Thomas & Betts and AMP
- crimp lug terminations. These criteria are established by Thomas & Betts basic Criteria and Installation Procedures (TRMH1) i dated June, 1978, and related AMP installation criteria. The visual defects include:
i Terminations exceed 1/16" of conductor extending beyond the o
s barrel of the lug.
o Conductor-not exposed from barrel of the lug.
o Paper not removed from conductor prior to crimping barrel of the lug.
Lugs were reversed, preventing visual inspection.
o II.
ANALYSIS OF SAFETY IMPLICATIONS This condition is evaluated as reportable.
If inadequately crimped lugs are left uncorrected, potential hazards of open or short circuits could occur which possibly could jeopardize the functional requirements of this safety related equipment.
j i
III. CORRECTIVE ACTION All Class 1E terminations utilizing crimp type lugs in the subject equipment shall be inspected to visual criteria which provides that the conductor shall be approximately flush with or protrude through j
the barrel approximately 1/16". Any connectors which do not meet these criteria shall be repaired as applicable following the termination practices established in Bechtel Construction i
Specification 13-EM-306.
This condition will be corrected per the following Investigation Requests:
1-IR-004 2-IR-0 04 3-IR-004 In addition to reportability under 10CFR50.55(e), Bechtel PVNGS Project considers the deficiency to be reportable under the i
requirements of 10CFR Part 21 by the supplier. This report satisfies the reporting requirements specified under 10CFR21 - 21 (b) (3) with the exception of sub-part (vi) which requires the number and location (customers and/or facilities) of other possible defective equipment. A copy of this report will be transmitted to Carrier Air Conditioning requesting their review for reporting under 10CFR Part 21.