Interim Deficiency Rept DER 83-9 Re Low Pressure Safety Injection Pump a Suction Strainer Containing Foreign Matl & Pump B W/Torn Strainer.Initially Reported on 830216.Due to Extensive Evaluation,Final Rept Will Be Submitted by 830715
ML20076E547
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 05/11/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-23731-RQT, DER-83-9, NUDOCS 8306010137
Download: ML20076E547 (2)


Text

.

G - 517 t .

Arizona Public Service Company P O BOX 216(4

  • PHOENIX. AR!ZON A 85036 I '

f_ .

May 11, 1983 ANPP-23731-RQT/BSK U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Time Extension For Report - DER 83-9 A 50.55(e) Potentially Reportable Deficiency Relating to Unit 1 LPSI Pump "A" Suction Strainer Contains Foreign Material, and Pump "B" Strainer is Torn File: 83-019-026; D.4.33.2 Re fere nce: (A) Telephone Conversation between T. Young and G. Duckworth on February 16, 1983 (B) ANPP-23238, dated March 14, 1983 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in

[ Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by May 12, 1983.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by July 15, 1983, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly youra,

. ClllbhQ W E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects Management ANPP Project Director EEVBJr/RQT:db l

cc: See Attached Page 2 l

l 8306010137 830511 PDR ADOCK 05000529 ,- q1 l

S PDR / v /

o Mr. D. M. Sternberg May 11, 1983 ANPP-23731-RQT/BSK Page 2 cc: Richard DeYoung , Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

J. A. Roedel D. B. Fasnacht G. C. Andognini J. R. Bynum A. C. Rogers l B. S. Kaplan W. E. Ide J. Vorees P. P. Klute/D. D. Green A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli l