RECEMD s
tmc Arizona Public Service Company P O. BOX 21666. PHOENIX. ARIZONA 85036 h83 MAY 23 FM I: 12 May 16, 1983 ANPP-23756-RQT/BSK REGIC:lvic; U. S. Nuclear Regulatory Con. mission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. D. M. Sternberg, Chief Reactor Projects Branch 1
Subject:
Time Extension - DER 82-68 A 50.55(e) Reportable Condition Relating to Underground Cables to Startup Transformers May Not Carry Full-Load Current At Maximum Site Soil Temperature File: 83-019-026; D.4.33.2 Re fere nce: A) Telephone Conversation between J. Eckhardt and J. Cook on November 26, 1982 B) ANPP-22521, dated December 13,1982 (Interim Report)
C) ANPP-23025, dated February 16, 1983 (Time Extension)
D) ANPP-23347, dated March 24, 1983 (Time Extension)
E) ANPP-23470, dated April 12, 1983 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and Time Extensions were requested by References (C), (D) and (E). At that time, it was estimated that a Final Report would be available by May 10, 1983.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by July 29, 1983, when a complete report will be submitted.
There is no new information or change to the interim Report at this time.
Very truly ours, 9S cudEp E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects Management ANPP Project Director EEVB/RQT:db Enclosure cc:
See Page 2 I 9 8306010119 830516 PDR ADOCK 05000528 a
w ff S
PDR j,p
.= __. -
". v *-
l Mr. D. M. Sternberg ANPP-23756-RQT/BSK May 16,1983 Page 2 cc:
Richard DeYoung, Director Office' of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
G. C. Andognini
+
- J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum P. P. Klute/D. D. Green A. C. Gehr l
W. J. Stubblefield l
W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli s
-t.n,
,--e r+y-y-ram w--
er
- e v
-e w
- ,e,-.-.w.,
,,m
...,v.3
- g y
s-s---
--e-.
-=-