ML20076E203
Jump to navigation
Jump to search
| ML20076E203 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 06/30/1991 |
| From: | Sedar J GENERAL PUBLIC UTILITIES CORP. |
| To: | |
| Shared Package | |
| ML20076E198 | List: |
| References | |
| NUDOCS 9108190030 | |
| Download: ML20076E203 (2) | |
Text
l r-l l.
Revised Operating Pata page for June,1991 I
i t
I 1
i
?
l 1
l l
t l-l l
t l
i I
r i
I i
l i
e
[-
b 1
(
l>
l i-L P
9108190030 91081'2 PDR ADCiCK 05000219 R
PDR r
4 i
?
.~.
s.'
l' OPERATING DATA REPORT OPERATING STATUS
- 1. DOCKET:
50-219
- 2. REPORTING PERIOD:
6/91
- 3. UTILITY CONTACT:
JOHN.SEDAR (609)971-4698
- 4. LICENSED THERMAL POWER (MWt).
1930
- 5. NAMEPLATE RATING (GROSS MWe):
687.5x0.8=580
- 6. DESIGN ELECTRICAL RATING (NET MWe):
650
- 7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
642
- 8. MAXIMUM DEPENDABLE CAPACITY (NET HWe):
620
- 9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:
NONE
- 10. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWo):
NONE
- 11. REASON FOR RESTRICTION, IF ANY:
NONE MONTH XEAB CUMULATIYE
- 12. REPORT PERIOD HOURS 720.0 4343.0 188639.0
- 13. HOURS RX CRITICAL 124.3 1235.3 120300.5
- 14. RX RESERVE SHUTDOWN HRS 0.0 0.0 918.2
- 15. HRS GENERATOR ON-LINE 67.8 1177.0 117090.0
- 17. GROSS THERM ENERGY (MWH) 73032 2172120 197067076
- 18. GROSS ELEC ENERGY (MWH) 17130 724160 66330083
- 19. NET ELEC ENEPOY (MWH) 12286 682384 63642416
- 20. UT SERVICE FACTOR 9.4 27.1 62.1 M.
UT AVAIL FACTOR 9.4
~27.1 62.7
25.3 54.4
- 24. UT FORCED OUTAGE RATE 0.0 0.0 11.5
- 25. FORCED OUTAGE HRS 0.0 0.0 15270.0
- 26. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION):
NONE I'
- 27. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE:
N/A l
NRC_RPT.WPD/18
-