Responds to NRC Re Violations Noted in IE Insp Rept 50-302/83-09.Corrective Actions:Instruments Identified within Violation Calibr & Study Performed to Determine Validity of ASME Code-tested Operability Due to Miscalibr
ML20076D402
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/16/1983
From: Westafer G
FLORIDA POWER CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20076D358 List:
References
3F-0683-08, 3F-683-8, NUDOCS 8308230383
Download: ML20076D402 (2)


Text

i I

/

tl

-.nonca

.,P wu Ss tiCT, CDil USNRC P F Q ')f 3.,'

pS W,, / b,:,

bp,,c.

csGIA

Cyn$

r w ;:

&<i C[I0 83 JUN 23 A 9 ; 22

\\C kh Florkia Power C0mPOaateoas June 16,1983 3F-0683-08 Mr. James P. O'Reilly Regional Administrator, Region 11 Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30303

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 IE Inspection Report No. 83-09

Dear Mr. O'Reilly:

Florida Power Corporation provides the attached as our response to the subject inspection report. This report was delayed for one week after discussion with Mr. A. V. Crienjak, of your staff, on June 6,1983, in order to provide more adequate time for our investigation to progress.

Sincerely,

,b G. R. Westafer Manager Nuclear Licensing and Fuel Management Attachment 0300230303]go$$b2 PDR ADOCK PDR O

General Office 3201 Tnirty fourin street soutn. P O. Box 14042, St Petersburg. Fionda 33733 e 813-866-5151

~

INSPECTION REPORT 83-09 JUE 16,1983 VIOLATION Technical Specification 4.0.5b requires inservice testing of ASME Code Class I, 2, and 3 pumps and volves in accordance with Section XI of the ASME Boller and Pressure Vessel Code 1974 Edition and Addenda through Summer 1975.

The 1974 Edition of Section XI requires in Article IWP-4113, Calibration, that all Instruments used for testing be calibrated and be verified for proper calibration on a regular basis established by the licensee.

Contrary to the above, as of March 10,1983,47 of 6S instruments used to perform inservice testing of pumps were found to be out of calibration. In addition, there is no established program to verify proper calibration on a regular basis.

This is a Severity Level IV Violation (Supplement I).

RESPONSE

(1)

FLORIDA POWER CORPORATION'S POSITION: The established calibration interval for several instruments used for testing ASME Code Class I, 2 and 3 pumps was exceeded.

However, while our investigation is not yet complete, many of the instruments were found to be acceptably calibrated.

(2)

DESIGNATION OF ADPARENT CAUSE: This violation was caused either by the failure to update or follow the existing calibration program.

(3)

IMMEDIATE CORRECTIVE ACTIONS:

The instruments identified within the violation were calibrated.

A study is being performed to evaluate whether any systems required to be tested by the ASME code were incorrectly determined to be operable due to instruments that were out of calibration.

A review has been performed identifying any additional instruments that should be calibrated prior to restart.

(4)

LONG TERM CORRECTIVE ACTIONS:

The instrument calibration program is being revised and updated to preclude similar occurrences.

All of the instruments that have been identified will be calibrated prior to restart.

(5)

DATE OF FULL COMPLIANCE: By July 10, 1983, all of the identified instruments used for ASME or other required testing will be calibrated.

.