. _ _

t OPER ATLNG DATA REPORT DOCKET NO.

S.0-317 DATE 8IU/83 COMPLETED BY Elaine Lotito TELEPHONE ]301) 781-5363 OPERATING STA TUS Calvert Cliffs No. 1 Notes

1. Unit Name:
2. Reportmg Period. July, 1983
3. Licensed Thernul PuuriMW );

2,700 8

4. Nameplate Rating (Gross Mhet
5. Design Electrical Rating INet Mhel: 8'S 860
6. Matimum Dependable Capa:ity (Grou MWel:

825

[

7. Maximum Dependable Capaeay sNet MWe).
8. If Changes Oecur in tapaty Ratin3:s illems Nur,ter 3 Throyh 7) Sin c Last Report.Gise Reasons.
9. Poa ct Lesel To which Re.I'iered. lf Any (Net Mhct
10. Reasor.s Tor Re. strict.e:a. It i,y :

This Mottth Yr.to.Dat?

Ct.raulatise 11 ilot.rs in Reporting Period 744.0 5.037.0 72.156.0

12. Number Or lioun Reactor has Critic!

744.0 4,871.7 57,967.6

13. Reactor Renne Shutdown liaurs 0.0 11.8 1.820.3
14. Hours Generator On Lir.c 744.0 4,850.4 56,874.3,
15. Ur.!: Resene Shutdown llours 0.0 0.0 0.0
16. Cross Thermal En-rgy Generated IMWit, 1,984,154 12,790,135 139,460,161 11 Gruss Electrical Energy Genersted MWill 653,965 4,293,654 45,894.597
15. Net Electrical Erergy Geocrated IMbtl, 626,765 4,112,957

_ 43,777,165

19. Unit Senite Factor 100.0 95.4 78.8
0. Unit.\\s:ilability F:cter 100.0 95.4 78.8
21. Unit Capscity Factor IUsing \\fDC Neil 102.1 98.0 74.6
22. Unit Capacity factar ILiing I)ER %:n 99.7 95.7 71.8

~

23. Urit f orced Outage Hate 0.0 2.3 7.6
24. Shutdowns Scheduled 0,cr Nest 6 Montits ( Type. Date.ar.d Duration of Eacht:
25. If Shut Down At End Of Rep.rt Perio1. Tstimated Date of Startup:
26. Un ;in Test Status irrior o Commercial Optr* tion).

Focecut Achiesed INITIA L CRITICA LITY INITl 4 L EL EC T RICITY COMMERCI A L OPE R A TION 8308220359 830812 f f 'f,()/

PDR ADOCK 05000317 y

p PDR Gl77 6

OPERATLNG DATA REPORT DOCKET NO. jo-318 DATE 87I'2/83 COMPLETED BY Elaine Lotito TELEPHONE (301) 76l.5363 OPERATING STATUS

!. Uni: Name:

Calvert Cliffs No. 2 Notes

2. Retortmg Period:

July, 19,8,3

3. Licensed Thermal Puwer:MWt): 2.700
4. Nameplate Rating (Gross MWet 911 845
5. Design Electries! Raimg(Net MWe):

860

6. Matimum Dependa')le Capacity (Gross MWel:

825

7. Manimum Depend 3ble Capacity (Net MWe):

S. If Changes Oecur in Capscity Ratings titems Number 3 Throgh 7) Since Last Report.Gise Reasons.

9. Fower Leiel To %hich He.t6cted. lf Any (Net Mhel: -

10 Renons For Re.trierens,if Ans:

1his Month Yr..to Date Curnuhtise I1. Ilours in Reporting Period 744.0 5,087.0 55,511.0

12. Number Oi Hours Resetor Was Critical 744.0 4.6P3.2 46,784.1
13. Reacter Resene Shutdown Hours 0.0 95.6 890.8
14. Ifours Generator On-Line 744.0 4,525.4 46,068.3
15. Unit Resene Shutdown flours 0.0 0.0 0:0
16. Grass Thermal Energy Generated IMWH) 1,989.322 11,864,874 114,085,631

!7 Gross Electrical Energy Generated IMWill 634,297 3,889.249 37,545,453

18. Net Electrical Energy Generated (MWH, 607,047 3,714,184

[ 35,804,946

~

49. t., nit Senice Factor 100.0 89.0 83.0
20. Unit Assalabi!!ty Factor 100;0 89.0 83.0
21. Unit Capacity factor IUsing MDC Net s 98.9 88.5

_ 78.8

22. Unit Capacity Factor (Caing DER Net) 96.6 86.4 76.3
23. Urit I orced Outage Rate 0.0 2.8 5.2
24. Shutdowns Scheduled Onct Nest 6 Months tType. Date, and Duraison of Eachi.
25. # 5 hut Down At End of Rep,rt Period. Estimated Date of Startup:
26. U.:its in Test Status (Prior eo Commercial Oper.*: ion 1 Foceces Achiesed INITIA L CRiflCA LITY INITl 4 L ELEC T RICITY COMMERCI A L OPER A TION (457)

AVERAGE D 41LY UNIT POWER LEVEL 50-317 DOCKET NO. -

UNIT Calvert Cliffs No. 1 DATE 8/12/83 Elaine Lotito COMPLETED BY (301) 787-5363 TELEPHONE MONTil July, 1983 DAY AVER ACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(Mwe. Net t 3

856 857 g7 2

855 gg 854 3

810 854 gg 4

853 20 856 5

851 21 856 6

849 22 851 852 803 7

73 g

855 24 751 25 850' 9

815 10 850 26 851 851 850 gg 3

12 "4

28 857 g3 856 850 3

l4 860 30 830 15 858 835 33 16 835 INS 111UCTIONS On this format.hst the average daily unit power levelin MWe Net for each day in the reporting month. Compete to the nearest whole nwpwatt.

(9/77) t

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-318 Calvert Cliffs No. 2 DATE 8/12/83 COMPLETED BY Elaine Lotito TELEPPIONE (301) 787-5363 MONTli July. 1983 DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Neti (MWe Net t 684

~3 g7 827 819 2

3g 3

nos I9 823 825 824 4

20 5

824 21 822 820 819 6

22 823 822 7

23 8

826 24 807 9

827 25 816.

10 775 814 26 829 814 gg 27 818 32 yg 13 825 29 819 l4 826 821 30 15 825 31 818 16 824 lNSTRUCTIONS On this format, hst the aserage daily unit power levelin MWe Net for each day in the reporting month. Compete to the r.earest whole nwpuatt.

(9/77)

DOCKETWO. 50 317 UNITSHU1 DOWNS AND POWER REDUCTIONS UNITNAME calvert cliffs #1-DATE 8/12/83 Elaine Lotito REPORT MONT11 July, 1983 COMPLETED BY TILLPif0NE (301) 787-5363 E

E 50

'E

_O No.

Date k

j3 k

} (E 3 LNcnsee E-r Ee Cauw & Corrective 8

{y E.i 5

Esent Attam to fE 5

3 g =!

Report a mV 8V Picsent Recurrer.cc e

L 6

No outages or reportable reductions.

t 3

4 F Forced Reason:

Methw!:

E sjubit G - Inst ructions S: Scheduled A.Equipmem Failure (Esplain) 1 Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram.

Entry Sheets for Ucensee C-Refueling 1 Autunut.e Sciam.

Esent Report (LE R) Fde (NUREG.

D Regulator) RestrLieun 4 Oontinuation D i t> l i I. Oper ios Tmnmg & beens Eununation 5-1.oad R.duceior.

F Adamnistralise 9-Other G-Operational Ee ror ( E splam )

E shibii I. Same Source (9/77) llother ( E splain)

50-316 WET WO.

UNITSHU1 DOWNS AND POWER REDUCT10NS Ca! vert Clifft #2 UNIT N AME DATE 8/12/83 uaine totito COMPLETED BY REPORT MONT11 Julv. 1983 TELEPHONE (301) 787-5363 C

ee 3

  • .o 4 5"

EX Laansee 52 c.,

Cauw & Corrective a

2 :-

G 7

OJ'#

h 3$

i

1. 5 E Esent s7 hi Action to

$3 5

[ is g Repost n 80

}O Picsent Recurrence 6

83-05 830717 S

12 5 A

5 XX ZZZZZZ Repair a steam leak on the pump casing of No. 21 Steam Generator Feed Pi:sp.

I 1

3 4

F Forced Reason.

Methext:

E sjubit G - Instructions S: Scheduled A Equipmen Failure (Esplain) 1 Manual for Prepar.ition of Dais B-Maintenance of Te:t 2-Manual Scram.

Enttv Sheets for Licensee C.Refuelerg

.L Ausonut.c Scrain.

Esent Repuri (LE RI Fde (NUREG-D I egt:lator) Restiieteun 4sContinuation 0161l

1. Operator Tsaining A Lians: Esenunation 5-1.oad Reduction F. Adminnt rat ne 9-O t ha G-Operational Einer (E spian)

Eshibis I. Sa:ne Sourse (9/77) llother ( E spf am)

August 2,1983 REFUELING INFORMATION REQUEST 1.

Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1 2.

Scheduled date for next Refueling Shutdown: September 30,1983 3.

Scheduled date for restart following refueling: December 1,1983 4.

Will refueling or resumption Of operation thereaf ter require a technical specification change or other license amendment?

Resumption of operation af ter refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

September 1,1983 6.

Important licensing considerations associated with the refueling.

Reload fuel will be similar to that reload fuel inserted into the previous cycle.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 732 Spent Fuel Pools are common to Units 1 and 2 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

1830 Licensed 830 Currently Installed 9.

The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.

April,1991

August 2,1983 REFUELING INFORMATION REQUEST 1.

Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.

2.

Scheduled date for next refueling shutdown: April 20,1984.

3.

Scheduled date for restart following refueling: June 10,1984.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other licensed amendment?

Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

March 3,1984 6.

Important licensing considerations associated with refueling.

Reload fuel will be similar to that reload fuelinserted in the previous cycle.

7.

The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.

(a) 217 (b) 732 Spent Fuel Pool is common to Units 1 and 2.

8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.

1830 Licensed 830 Currently Installed 9.

The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.

April,1991

o

SUMMARY

OF UNIT 1 OPERATING EXPERIENCE JULY 1983 7/1 At the beginning of this reporting period Unit I was operating at 852 MWe with the reactor at 100% power.

7/3 Decreased load to 730 MWe at 0510 for Main Turbine Control Valve testing and Main Condenser Water Box cleaning. Resumed full load operation (850 MWe) at 1430.

7/9 Decreased load to 775 MWe at 0600 to clean condenser water boxes. Load was increased to capacity (850 MWe) at 1915.

7/16 At 0400 load was decreased to 700 MWe to test Main Turbine Valves. Load was increased to capacity (850 MWe) at 0700.

a 7/23 At 0245 load was decreased to 735 MWe to clean condenser water boxes.

7/24 Main Condenser Water Box cleaning was completed at 2100 however, load remained limited to 735 MWe to investigate saltwater leakage into the main condenser.

7/25 Load was increased to 850 MWe at 0110 when indications of saltwater leakage disappeared.

1

i

SUMMARY

OF UNIT 1 OPERATING EXPERIENCE JULY 1983 7/29 Decreased load to 825 MWe at 2205 for Moderator Temperature Coefficient testing.

7/31 Load was increased to 850 MWe at 1620. At the end of this reporting period Unit I was operating at 850 MWe with the reactor at 100%

J t

l l

SUMMARY

OF UNIT 2 OPERATING EXPERIENCE JULY 1983 7/1 At the beginning of this reporting period Unit 2 was operating at 827 MWe with the reactor at 100% power.

7/10 At 0600 load was decreased to clean condenser water boxes and Main Turbine Control Valve testing. Resumed full load operation (820 MWe) at 2310.

7/17 At 0130 load was decreased to 550 MWe to repair a steam leak on the pump

(

casing of 21 Steam Generator Feed Pump. Resumed full load operation (820 MWe) at 1900.

7/24 Decreased load to 720 MWe at 0030 for Main Turbine Control Valve testing.

Resumed full load operation (815 MWe) at 0500.

7/31 At the end of this reporting period Unit 2 was operating at 820 MWe with the reactor at 100% power.

e B ALTIMORE GAS AND ELECTRIC CHARLES CENTER. P.O. BOX 1475 BALTIMORE, MARYLAND 21203 FOS $1L POWER DEPARTMENT August 12, 1983

'4 Director Office of Inspection and Enforcement U. S. Nuclear Regualtory Conenission Washington, D.C.

20055 ATTENTION: Document Control Desk Gentlemen:

Enclosed herewith is the July 1983 - Operation Status Report for Calvert Cliffs No. 1 Unit, (Docket 50-317) and Calvert Cliffs No. 2 Unit, (Docket 50-318).

Sincerely, E=-

h%.

E. M. Lotito Performance Data Analyser Production Economy and Results Unit Fossil Power Department Enclosure cc:

Messrs W. Lavallee J. Tiernan C. McCabe, Jr.

R. Architzel-P. Krause L. Russell P. Ross P. Sierer, Jr.

M. Beebe C. Shoemaker D. Reilly R. Ash T. Magette V. Stricklin A. Lundvall EML/bew wp/2/(NCR)

TE 2Y Ifi