ML20076B527
| ML20076B527 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 08/11/1983 |
| From: | Dale L MISSISSIPPI POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| RO-83-065, RO-83-65, NUDOCS 8308190392 | |
| Download: ML20076B527 (3) | |
Text
%
L'
]
MISSLBMWi3i BOisNR & LIGHT COMPANY
' Helping Build Mississippi EuhMMdMdA P. O. B O X 16 4 0, J A C K ON, MISSISSIPPI 39205 63 M O N ugu t'l, 1983 A
NUCLEAR PROoUCTioH OEPARTMENT Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 !!arietta St., N.W., Suite 2900 Atlanta, Georgia 30303 Attention:
Mr. J. P. O'Reilly, Regional Administrator
Dear Mr. O'F.eilly:
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File: 0260/L-835.0 Special Report 83-065/0 - Fire Rated Penetrations Reworked AECM-83/0462 On July 8, 1983, the fire rated penetrations listed on the attached page were reworked due to incomplete documentation and secondary containment penetrations not being sealed properly (improper sealing resulted in air in-leakage). A Limiting Condition for Operation was entered in accordance with Technical Specification 3.7.7.
The discrepancies and corrective actions are identified on Material Non-Conformance Reports 00416-83 and 00479-83. This is reported as a Special Report pursuant to Technical Specification 6.9.2.
This condition has no affect on the health and safety of the public and does not constitute a threat to plant safety. The work tasks are expected to be completed by September 30, 1983.
Yours truly, L., H Mk 6 L. F. Dale Manager of P< clear Services EBS/SHH:rg cc: See next page 8308190392 830811 PDR ADOCK 05000416 S
PDR 1,Cf. i f Y" f
Member Middle South Utilities System lll
- 88
- MIMISSIPPI POWER Q LIGHT COMPANY cc:
Mr.:J. B. Richard.(w/a)
Mr. R. B. McGehee (w/o)
Mr. T. B. Conner'(w/o)
Mr. G. B. Taylor (w/o)
Mr. Richard C. DeYoung, Director (w/a) i Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Document,Centrol Desk (w/a) l U.'S. Nuclear Regulatory Commission Washington, D. C.
20555 I
1 h
I I
t l
,A Attachm:nt to AECM-83/0462 On July 8, 1983, the following fire rated penetrations were reworked:
PENETRATIONS INCIDENT REPORT NUMBER AE70A 83-07-17 AE71A 83-07-17 AE35C 83-07-17 AE43C 83-07-17 AE88C 83-07-17 AE185C 83-07-17 AC38E 83-07-17 AE289D 83-07-17 AE405C 83-07-19 AE411C 83-07-19 AE217D 83-07-19 AE220D 83-07-19
,