Final Deficiency Rept Re Restart of Control Complex Chiller Following Either Loss of Offsite Power or Loca.Initially Reported on 830407.AE Design Changes Expected to Be Completed by 840101 & Implemented by 840301
ML20076B421
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 08/15/1983
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8308190350
Download: ML20076B421 (2)


Text

,

b v 1; - ;a j rqt p ~ ' n.

cr, c

Is; u, u L c.

1 P.o. BOX 5000 - CLEVELAND, OHlo 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG-

- 55 PUBLIC SOUARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRESinENT August 15, 1983 NUCLEAR Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:

Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Restart of the Control Complex Chiller [RDC 70(83)]

Dear Mr. Keppler:

This letter serves as the final report pursuant to 10CFR50.55(e) on the significant deficiency concerning restart of the Control Complex Chiller following either a Loss of Offsite Power (LOOP) or a Loss of Coolant Accident (LOCA). This problem was identified to Mr. Pelke of your of fice on April 7, 1983, by Mr. E. Riley of The Cleveland Electric Illuminating Company. Our interim report dated May 6, 1983, stated that Gilbert Associates, Inc. (GAI) was evaluating this situation.

GAI's evaluation indicated that this situation represents a significant deficiency and GAI subsequently notified Mr. R. C.

DeYoung of this via a letter dated June 30, 1983.

This report contains a description of the deficiency, an analysis of the safety implications, and the corrective action to be implemented.

Description of Deficiency Either a Loss of Offsite Power (LOOP) or Loss of Coolant Accident (LOCA) will cause a trip of the control complex chiller which is operating. This chiller will be inoperable for a minimum of twenty minutes due to protective interlocks.

Operator action would be required to start the other chiller. This is in l

conflict with FSAR Section 9.4.9.5.la, for a LOOP, which specifies an automatic restart. The failure to restart would result in a loss of control room cooling for approximately eighteen minutes. The temperature reached in the control room by this time could compromise the capabilities of both the control room operator and the safety-related equipment contained therein.

In addition, assuming a single failure in the redundant chiller, the time to restore a chiller would be in excess of twenty minutes. This would create even a more severe temperature problem in the control room.

f OO o

PDR 5N gg1 ll0

'T..

.Mr. A me G. K:ppler August 15, 1983 Analysis of Safety Implications Cooling of the control complex is necessary during both normal operations and accident conditions.

If cooling capability is lost for a period of time (as described above), temperatures in the control complex would exceed the qualification j

temperatures of the safe shutdown equipmont located therein, thereby compromising the safe operation of the plant. Additionally, the control room operators' abilities to operate safe shutdown equipment may be compromised.

Corrective Action Gilbert Associates, Inc., the Architect / Engineer, is processing appropriate design changes that will provide automatic restart capability of the Control Complex Chillers. We currently anticipate the design changes to be complete by January 1, 1984, and to be implemented by March 1, 1984.

In addition, GAI is performing a Safe Shutdown System Review. This review will assure that automatic or manual start of support systems is provided for as required by the design. We anticipate completion of this review by September 30, 1983, with any recommendations for further corrective action to be received from GAI by October 14, 1983. Any significant results which may arise from the GAI review will be documented in accordance with our program.

Please call if there are additional questions.

Sincerely, Murray R.

delman Vice President Nuclear Group MRE:pab cc:

Mr. M. L. Gildner NRC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C.

20555 Records Center, SEE IN Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339