ML20076B086

From kanterella
Jump to navigation Jump to search

Amends 32 & 24 to Licenses NPF-2 & NPF-8,respectively, Correcting Administrative Error in Tech Specs Re Testing & Insp of River Water Sys
ML20076B086
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/02/1983
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20076B090 List:
References
TAC-51892, TAC-51893, NUDOCS 8308190065
Download: ML20076B086 (8)


Text

.

pp.

+0 "* W,jo,,

UNITED STATES

.E NUCLEAR REGULATORY COMMISSION g

g yE WASHINGTON, D. C. 20555 9x, * *,. *.#

m ALABAMA POWER COMPANY DOCKET N0. 50-348 4

JOSEPH M. FARLEY NUCLEAR PLANT, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 32 License No. NPF-2 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment hy Alabama Power Company (the licensee) dated June 20, 1983, supplemented hy letter dated.

June 29, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I;

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

8308190065 830802 DR ADOCK 050003g8

-?,rM r

-Tv c

7

-?-vt-

+

7 r--t 2wr tw r-1e 7

fN-

^

. 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-2 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 32, are hereby incorporated in the license. The licensee shall operate the facility in accordance wich the Technical Specifications.

2., This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMtilSSION (l-.

(*

rd/ c u r. u,

(

" Steven A. Varga, Chief Operating Reactors Bra h No. 1 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: August 2, 1983 h

e O

e b

e m--.-.----.,-e

-c

.,--n-.

y

, k ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO.~ 32 TO FACILITY OPERATING LICENSE NO. NPF-2 DOCKET NO. 50-348 Revise Appendix A as follows:

Remove Page Insert Page 3/4 7-13 3/4 7-13 f

O en 4

9 T

e d

  • h 4

. - - _ -.. -.. _ _ _.. -. _ _ _. _ _ _ _ _ _ _..... _... _ _ _.. _, _. - _ _ ~ _ _ _ _., _,. _

1 W

PLANT SYSTEMS 3/4.7.5. RIVER WATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.5 At least two independent river water loops shall be OPERABLE with at least two river water pumps per loop.

APPLICABILITY:

MODES 1, 2, 3 and 4.

ACTION:

With only one river water loop OPERABLE, restore at least two loops to OPERABLE status within 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTOOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.7.5 Each river water. loop shall be ' demonstrated OPERABLE:

a.

At least once per 31 days by verifying that each valve (manual, power operated or automat,1c), in the flow path, servicing safety related equipment that is not locked, sealed, or otherwise secured in position, is in its correct position.

At least once per 18 months by:

b 1.

Verifying that each automatic valve servicing safety related equipment actuates to its correct position on a low pond level signal.

2.

Verifying that the buried piping is leak tight by a visual inspection of the ground area.

e FARLEY-UNIT 1 3/4 7-13 AMENDMENT N0. 32

![

jo UNITED STATES M

y}\\

[gg NUCLEAR REGULATORY COMMISSION jf; WASHINGTON, D. C. 20555 0, %r

%,..... f.

ALABAMA POWER COMPANY DOCKET N0. 50-364 JOSEPH M. FARLEY NUCLEAR PLANT, UNIT N0. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 24 License No. NPF-8 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Alabama Power Company (the licensee) dated June 20, 1983, supplemented by letter dated June 29,1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I;

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

g 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-8 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 24, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

2.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

--A I

ddIk I

s Steven A. Varga, Chi f Operating Reactors B h No. 1 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: August 2, 1983 e

6 9

a I

g.

t ATTACHMENT'TO LICEf;SE AMENDMENT AMENDMENT NO. 24 -T0' FACILITY OPERATING LICENSE f;0. NPF-8 DOCKET NO. 50-364 4'

Revise Appendix A as follows:

Remove Page Insert Page

}

3/4 7-13 3/4 7-13 e

i

~

i -

1 4

4

=**e t

J 4

i 4

f 2

4

- -._.. _ _.., _,,-_.. _ _. - _.... _...., _ _. _...., _. -., _ _ _.. -... _,. ~.. - _ _,, _ _ _ _. _. _,

~

a PLANT SYSTEMS 3/4.7.5 RIVER WATER SYSTEM J

LIMITING CONDITION FOR OPERATION 3.7.5 At least two independent river water loops shall be OPERABLE with at i

least two river water pumps per loop.

APPLICABILITY:

MODES 1, 2, 3 and 4.

ACTION:

With tnly one river water loup OPERABLE, restore at least two loops to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.7.5 Each river water loop shall'be demonstrated OPERABLE:

a.

At least once per 31 days by verifying that each valve (manual, power operated or automatic), in the flow path, servicing safety related equipment that is not locked, sedled, or otherwise secured in position, is in its correct position.**

b.

At least once per 18 months by:

^

'1.

Verifying that each automatic valve servicing safety related equipment actuates to its correct position on a low pond level signal.

2.

Verifying that the buried piping is leak tight by a visual inspection of the ground area.

Amendment No. 24 FARLEY-UNIT 2 3/4 7-13

- _. _ _, _. _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _. _ -, _ _