ML20074A610
| ML20074A610 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/29/1983 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Sternberg D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, ANPP-23647-RQT, DER-83-20, NUDOCS 8305130210 | |
| Download: ML20074A610 (1) | |
Text
/ l m ;,,
('
(
A
?
y,} W O b6 o
O I '.
\\>
1
' r, s
Arizona Public Service Company PO. BOX 21666.
PHOENIX. ARIZONA 85036
- p.,
?,.
/;
April 29, 1983 ANPP-23623-BSK/RQT CORRECTED NUMBER U. S. Nuclear Regulatory Commission ANPP-23647-RQT/BSK Regica V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. D. M. Sternberg, Chie f Reactor Projects Branch 1
Subject:
Deficiency Evaluation Report DER 83-20 A 50.55(e) Evaluation Relating to Startup Test Personnel Qualifications File: 83-019-0 26; D.4.33.2
Reference:
Telephone Conversation between A. D'Angelo and R. Tucker on April 6,1983
Dear Sir:
The NRC was notified of the subject Deficiency Evaluation in the referenced telephone conversation, with a determination of reportability to be made within thirty (30) days (May 5, 1983).
The deficiency has subsequently been determined to be Not Reportable under the requirements of 10CFR50.55(e), therefore no written report is required. Necessary documentation of the evaluation will be maintained in APS files.
Very truly your,
\\
/r b.k.kcat h a E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects Management ANPP Project Director EEVB/RQT:db cc:
See Page 2 8305130210 830429 PDR ADOCK 05000528 S
PDR IZ5 CI..CED Or.ICINAL cc.ma sd /Ait ga7