Ro:On 830506,discovered That Chemical Vol Control Sys Holdup Tanks Not Sampled in 12 H Time Period Required When Automatic Gas Analyzer Inoperable.Sample Performed Approx 4-5 H Late
ML20074A606
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/09/1983
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8305130206
Download: ML20074A606 (1)


Text

.*

L (

,2,,

IN0/ANA & MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465-5901 May 9, 1983 Mr. J.G. Yeppler, Regional Administrator United States IAlclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License Nos. DPR-58, DPR-74 Ibcket. Nos. 50-315 and 50-316

Dear Mr. Feppler:

This is to confirm a verbal report which was given to Mr. N.E. DuBry of your office at 1517 hours0.0176 days <br />0.421 hours <br />0.00251 weeks <br />5.772185e-4 months <br /> on May 6, 1983. At that time I informed Mr.

DuBry that during a data review we discovered that the Gemical Volure Control System Ibidup Tanks were not sampled in the 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> time period required when the autcmatic gas analyzer is inoperable (sample was performed approximately 4 - 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> late).

As required by Technical Specification 6.9.1.12, a followup report will be subnitted within 14 days.

~

Sincerely,

& Y W.G. Snith, Jr.

Plant Manager

/bab l

cc: John E. Dolan R.S. Illnter M.P. Alexich R.F. Kroeger B. Germano R.C. Callen G. G arnoff E.R. Swanson/N.E. DuBry RO:III J.M. Hennigan R.O. Bruggee, EPRI INPO PNSRC J.F. Stietzel E.L. Townley h

Dir., IE (40 copies)

Dir., MIPC (4 copies)

MAY 111983

[

8305130206 830509 PDR ADOCK 05000315 S

pyp