.pa Arizona Public Service Company
! ) f ',9 P.O. Box 21666 e PHOENIX. ARIZONA 85036 c.,
l: e.-
April 26, 1983 ANPP-23597-RQT/BSK '"%,
U. S. Nuclear Regulatory Commission
$142d b
Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. D. M. Sternberg, Chief Reactor Projects Branch 1
Subject:
Time Extension For Report - DER 82-51 A 50.55(e) Potentially Reportable Deficiency Relating to Pullman-Kellogg Pipe Line Failure In Unit 1 Essential Cooling Water System File: 83-019-026; D.4.33.2
Reference:
(A) Telephone Conversation between J. Eckhardt and G. Duckworth on September 10, 1982 (B) ANPP-21973, dated October 8, 1982 (Interim Report)
(C) ANPP-22433, dated December 1, 1982 (Time Extension)
(D) ANPP-22823, dated January 26, 1983 (Time Extension)
(E) ANPP-23426, dated April 5, 1983 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and Time Extensions were requested by References (C), (D) and (E). At that time, it was estimated that a Final Report would be avnilable by April 26, 1983.
Due to the extensive evaluation required, it is now expected that this information will be finalized by May 31, 1983, when a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly youps, L. L. 'CtLL ritLL i
E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects Management ANPP Project Director EEVB/RQT:db cc: See Page 2 8305130183 830426 PDR ADOCK 05000528 S
PDR Tf97
r L
Mr. D. M. Sternberg ANPP-23597-RQT/BSK April 26, 1983 Page 2 cc:
Richard DeYoung, Director Office of Inspection and Enforcement U.-S. Nuclear Regulatory Commission Washington, D. C. 20555
'T. G. Woods, Jr.
G..C. Andognini J. A. Roedel D. B. Fasnacht
'A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum P. P. Klute/D. D. Green A. C. Gehr W. J. Stubblefield W. G. Bingham-R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiore11i Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 i-t l