ML20074A504

From kanterella
Jump to navigation Jump to search
Deficiency Evaluation Rept 83-18 Re Installation of Pipe Supports Which Do Not Meet Seismic IX Requirements.Initially Reported on 830329.Deficiency Determined Not Reportable Per 10CFR50.55(e).Documentation Will Be Maintained in Files
ML20074A504
Person / Time
Site: Palo Verde  
Issue date: 04/28/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-23621-BSK, DER-83-18, NUDOCS 8305130124
Download: ML20074A504 (2)


Text

... _

_

c..

  • ypp%y o

Arizona Public Service Company l%e J

  • j P.o. Box 21666. PHOENIX, ARIZONA 850M

'N.

h' 2P April 28, 1983 Q,

ANPP-23621-BSK/RQT to U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Deficiency Evaluation Report DER 83-18 A 50.55(e) Evaluation Relating to The Installation of Pipe Supports Does Not Meet 4

Seismic IX Requirements File: 83-019-026; D.4.33.2 Re ference: Telephone Conversation between P. Stewart and G. Duckworth on March 29, 1983

Dear Sir:

The NRC was notified of the subject Deficiency Evaluation in the referenced telephone conversation, with a determination of reportability to be made within thirty (30) days (April 28, 1983).

The deficiency has subsequently been determined to be Not Reportable j

under the requirements of 10CFR50.55(e), therefore no written report is i

required. Necessary documentation of the evaluation will be maintained l

In APS files.

1 Very truly yours,

\\

CL a t.LL

^

E. E. Van Brunt, Jr.

APS Vice President l-Nuclear Projects Management l

ANPP Project Director EEVB/RQT:db cc:

See Page 2 l

l 8305130124 830428 PDR ADOCK 05000528 S

PDR y

Mr. D. M. Sternberg ANPP-23621-RQT/BSK April 28, 1983 Page 2 cc:

Richard DeYoung, Director Office of Inspection and Eniorcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum D. D. Green P. P. Klute/D. D. Green A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 l

l I

I i

<