ML20073T314
| ML20073T314 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 05/03/1983 |
| From: | Adensam E Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20073T315 | List: |
| References | |
| NUDOCS 8305110249 | |
| Download: ML20073T314 (8) | |
Text
.
1
.;:t i
i
[
TENNESSEE VALLEY AUTHORITY DOCKET No. 50-327 i
SEQUOYAH NUCLEAR PLANT, UNIT 1 l
AMENDHENT TO FACILITY OPERATING LICENSE j
i Amendment No. 28 i
License No. DPR-77 i
i 1.
The Nuclear Regulatory Commission (the Commission) has found that:
I A.
The application for amendment to the Sequoyah Nuclear Plant, Unit 1 i
(the facility) Facility Operating License No. DPR-77 filed by the l
Tennessee Valley Authority (licensee), dated March 28, 1983, complies-i with the standards and requirements of the Atomic Energy Act of 1954, i
as amended (the Act) and the Commission's regulations as set forth in 10 CFR Chapter I; i
L B.
The facility will operate in confonnity _with the license, as amended, j
the provisions of the Act, and the rules and regulations of the Com-.-
mission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such' activities will be conducted
~
in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and i
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 l
of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is hereby amended by page changes to the Appendix A Technical Specifications as indicated in the attachments to this license amend-ment'and paragraph 2.C.(2) of Facility Operating License No. DPR-77 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in' Appendix A, as revised i
through Amendment No.28, are hereby incorporated into the license.-
8305110249 830503 PDR ADOCK 05000327 P
pm o,,,c. >
CURNAM h 04re )
l ' unc row sis no-e nacu ono OFFICIAL RECORD COPY usano:,wi-us
b h
$k.
k
.o
- The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license anendment is effective as of its date of issuance.
FOR,THE NUCLEAR REGULATORY COMMISSION
/
1 Elinor G. Adensam, Chief Licensing Branch No. 4 Division of Licensing Attachaent:
Appendix A Technical Specification Changes Date of Issuance: May 3, 1983
.'L
,4,
LA;DLgBg4 DL ; LB,,,y,4,,,,,,,,
.DL
,,f,4,.,...#df...,,,,0E.LD,,,$,,S.
nsa....1 v a x...........
- ornce, sin,.,,sw.. mmp3.e
..cs
.e.....
e -=, >
4a.683...
4./.. 21n...
..u
..u$u....
. /3/u..... ph83.........
om>
NRC FORM 313 00 80) NRCM Om OFFICIAL RECORD COPY usceo. mi-ass-xe
r ATTACHMENT TO LICENSE AMENDHENT NO. 28 FACILITY OPERATING LICENSE NO. DPR-77 DOCKET NO. 50-327 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by Amendment number and contains a vertical line indicating the area of change.
Amended Page 3/4 5-4 omc.,
sunsaus >
oare >
NRC FORM Si$ (10-80) NRCM 024o OFFICIAL RECORD COPY usapo:ie i-.m.
EMERGENCYCOREC00LkNGSYSTEMS(ECCS)
SURVEILLANCE REQUIREMENTS (Continued) b.
At least once per 31 days and within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after each solution volume increase of greater than or equal to 1% of tank volume by verifying the boron concentration of the solution in the water-filled accumulator.
c.
At least once per 18 months by:
1.
Verifying that each' accumulator isolation valve closes automa-tically when the water level in the water-filled accumulator is 82.1 1 5.6 inches above the tank vendor working line.
This corresponds to 87.1 1 5.6 inches when corrected for the mass of cover gas.
2.
Verifying that the total dissolved nitrogen and air in the water-filled accumulator is less than 80 SCF per 1800 cubic
-5 feet of water (equivalent to 5 x 10 pounds nitrogen per pounds water).
d.
At least once per 5 years by removing the membrane installed between the water-filled and nitrogen bearing accumulators and verifying that the removed membrane bursts at a differential pressure of 40 + 10 psi.
SEQUOYAH.. UNIT 1 3/4 5-4 Amendment No. 28
i t
F
(
TEHNESSEE VALLEY AUTHORITY DOCKET NO. 50-328 SEQUOYAH NUCLEAR PLANT, UNIT 2 AMEN 0 MENT TO FACILITY OPERATING LICENSE Amendment No.17 License No. DPR-79 1.
The Nuclear Regulatory Cocnission (the Commission) has found that:
A.
The application for amendment to the Sequoyah Nuclear Plant, Ur:it 2 (the facility) Facility Operating License No. DPR-79 filed by the Tennessee Valley Authority (licensee), dated March 28, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations as set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the license, as amended, the provisions of the Act, and the rules and regulations of the Com-mission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is hereby amended by page changes to the Appendix A' Technical Specifications as indicated in the attachments to this license amendment and paragraph 2.C.(2) of Facility Operating License No. DPR-79 is hereby anended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.17, are hereby incorporated into the license.
OFFICE )
suzuns >
one>
nne FORM 318 (10 80) NRCM 0240 OFFiClAL RECORD COPY usam mi-mm
s 2-1 The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendnent is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COM:11SSION
)(
i Elinor G. Adensam, Chief Licensing Branch No. 4 Division of Licensing
Attachment:
Appendix A Technical Specification Change Date of Issuance: May 3, 1983 e
OFF6CE p.LA D QL.#4..DL:LB..J.4.....
..M..
..... 0 ELD..........
Bf... N.......
wi.nc'4..
mftM!.D..........C...!.9.........W..!h..
d m
.o. ~. >
4./.'. /.aa............. 4./...aa..........a z.Wa a....
..... z.3...aa....
.g..).a.3.........
.a/.das.....
- o.,
NAC FOnM 318 (3480) NRCM 033 OFFiClAL RECORD COPY.
usom ini-sa =
3 ATTACHMENT TO LICENSE AMENDMENT NO. 17 FACILITY OPERATING LICENSE NO. DPR-79 73CKET NO. 50-328 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by Amendment number and contains a vertical line indicating the area of change.
Amended i
Page 3/4 5-4
't 1
i omer>
sonnawe >
DATE) nac ronu sie no-eq nncu om OFFICIAL RECORD COPY usom mi-m-=
EMERGENCYCOREC00LkNGSYSTEMS
~
SURVEILLANCE REQUIREMENTS (Continued) b.
At least once per 31 days and within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after each solution volume increase of greater than or equal to 1% of tank volume by verifying the boron concentration of the solution in the water-filled accumulator.
c.
At least once per 18 months b'y:
1.
Verifying that each accumulator isolation valve closes automa-tically when the water level in the water-filled accumulator is 82.1 15.6 inches above the tank vendor working line.
This corresponds to 87.1 1 5.6 inches when corrected for the mass of cover gas.
2.
Verifying that the total dissolved nitrogen and air in the water-filled accumulator is less than 80 SCF per 1800 cubic
-5 feet of water (equivalent to 5 x 10 pounds nitrogen per pounds water).
d.
At least once per 5 years by removing the membrane installed between the water-filled and nitrogen bearing accumulators and verifying that the removed membrane bursts at a differential pressure of 40 + 10 psi.
L a
t i
i 4
SEQUOYAH - UNIT 2
'i 3/4 5-4 Amendment'No. 17-y
>s:
a.
s
-_aA