Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARBSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 BSEP-98-0055, Monthly Operating Repts for Feb 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0038, Monthly Operating Repts for Jan 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0007, Monthly Operating Repts for Dec 1997 for Brunswick Steam Electric Plant,Unit 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Brunswick Steam Electric Plant,Unit 1 & 2 BSEP-97-0528, Monthly Operating Repts for Nov 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0500, Monthly Operating Repts for Oct 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0456, Monthly Operating Repts for Sept 1997 for Brunswick Steam Electric Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Brunswick Steam Electric Plant BSEP-97-0410, Monthly Operating Repts for Aug 1997 for Bsep,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Bsep,Units 1 & 2 BSEP-97-0373, Monthly Operating Repts for Jul 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0323, Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0266, Monthly Operating Repts for May 1997 for Brunswick Steam Electric Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-97-0219, Monthly Operating Repts for Apr 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0142, Monthly Operating Repts for March 1997 for Bsep,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Bsep,Units 1 & 2 BSEP-97-0105, Monthly Operating Repts for Feb 1997 for Bsep,Units 1 & 21997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Bsep,Units 1 & 2 BSEP-97-0055, Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 21997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 2 ML20138H7881996-12-31031 December 1996 Corrected Monthly Operating Rept for Dec 1996 for Brunswick Unit 1 BSEP-97-0015, Monthly Operating Repts for Dec 1996 for Brunswick Steam Electric Plant Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0451, Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 2 ML20138H7821996-11-30030 November 1996 Corrected Monthly Operating Rept for Nov 1996 for Brunswick Unit 1 BSEP-96-0422, Monthly Operating Repts for Oct 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0375, Monthly Operating Repts for Sept 1996 for Brunswick Steam Electric Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Brunswick Steam Electric Plant Unit 1 & 2 BSEP-96-0330, Monthly Operating Repts for Aug 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0295, Monthly Operating Repts for July 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0253, Monthly Operating Repts for June 1996 for Brunswick Steam Electric Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0236, Monthly Operating Repts for May 1996 for Brunswick Steam Electric Plant Units 1 & 21996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0204, Monthly Operating Repts for April 1996 for BSEP1996-04-30030 April 1996 Monthly Operating Repts for April 1996 for BSEP BSEP-96-0146, Monthly Operating Repts for Mar 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0097, Monthly Operating Repts for Feb 1996 for BSEP1996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for BSEP BSEP-96-0053, Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 21996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 2 BSEP-96-0008, Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N3271999-10-21021 October 1999 Part 21 Rept Re non-linear Oxygen Readings with Two (2) Model 225 CMA-X Containment Monitoring Sys at Bsep.Caused by High Gain Produced by 10K Resistor Across Second Stage Amplifier.Engineering Drawings Will Be Revised BSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210P9441999-08-10010 August 1999 Safety Evaluation Accepting Licensee Assessment of Impact on Operation of Plant,Unit 1,with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers ML20210P9181999-08-10010 August 1999 Safety Evaluation Authorizing Request for Reliefs CIP-01,02, 06,07,08,09,10 & 11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Request CIP-04 & 05 Would Result in hardship,CIP-03 Not Required & CIP-11 Denied in Part ML20210N2341999-08-0505 August 1999 SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20210M8581999-05-14014 May 1999 B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, Rev 0 ML20211L3711999-05-10010 May 1999 Rev 0 to ESR 98-00333, Unit 2 Invessel Feedwater Sparger Evaluation ML20206G1871999-05-0404 May 1999 Safety Evaluation Approving Third 10-year ISI Program Requests for Relief (RR) RR-08,RR-15 & RR-17 BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With ML20206N1791999-04-23023 April 1999 Rev 0 to 2B21-0554, Brunswick Unit 2,Cycle 14 Colr BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20205F9031999-03-30030 March 1999 Safety Evaluation Supporting Proposed Rev to BSEP RERP to Licenses DPR-62 & DPR-71,respectively ML20206N1831999-02-28028 February 1999 Rev 0 to Suppl Reload Licensing Rept for Bsep,Unit 2 Reload 13 Cycle 14 BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20203D7061999-02-0909 February 1999 SER Accepting Proposed Alternatives Contained in Relief Requests PRR-04,VRR-04,VRR-13,PRR-01,PRR-03,VRR-01.VRR-07, VRR-08 & VRR-09 Denied BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0210, Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired1998-10-30030 October 1998 Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired ML20154P8151998-10-16016 October 1998 SER Accepting Revised Safety Analysis of Operational Transient of 920117,for Plant,Unit 1 ML20154P8591998-10-16016 October 1998 SER Accepting Equivalent Margins Analysis for N-16A/B Instrument Nozzles for Plant,Units 1 & 2 BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151Y6211998-09-14014 September 1998 BSEP Rept Describing Changes,Tests & Experiments, for Bsep,Units 1 & 2 ML20151Y6371998-09-14014 September 1998 Changes to QA Program, for Bsep,Units 1 & 2 BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151T5021998-08-0505 August 1998 Project Implementation Plan, Ngg Yr 2000 Readiness Program, Rev 2 BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 ML20236T1961998-07-0101 July 1998 Rev 1 to 2B21-0088, Brunswick Unit 2,Cycle 13 Colr ML20236T1921998-07-0101 July 1998 Rev 1 to 1B21-0537, Brunswick Unit 1,Cycle 12 Colr BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20236T1971998-06-30030 June 1998 Rev 2 to 24A5412, Supplemental Reload Licensing Rept for Brunswick Steam Electric Plant Unit 2 Reload 12 Cycle 13 ML20249B9691998-06-11011 June 1998 Rev 1 to VC44.F02, Brunswick Steam Electric Plant,Units 1 & 2,ECCS Suction Strainers Replacement Project,Nrc Bulletin 96-003 Final Rept BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 ML20247N7501998-04-30030 April 1998 Rev 0 to BSEP Unit 1,Cycle 12 Colr ML20247N7721998-04-30030 April 1998 Rev 0 to J1103244SRLR, Supplemental Reload Licensing Rept for BSEP Unit 1,Reload 11,Cycle 12 ML20217K8461998-04-24024 April 1998 Safety Evaluation Approving Proposed Use of Code Case N-535 at Brunswick Unit 1 During Second 10-yr Interval,Pursuant to 10CFR50.55a(a)(3)(i).Authorizes Use of Code Case N-535 Until Code Case Included in Future Rev of RG 1.147 ML20217K3941998-04-24024 April 1998 SER Approving Relief Request for Pump Vibration Monitoring, Brunswick Steam Electric Plant,Units 1 & 2 ML20217E6841998-04-23023 April 1998 Safety Evaluation Accepting Code Case N-547, Alternative Exam Requirements for Pressure Retaining Bolting of CRD Housings ML20217E7471998-04-21021 April 1998 Safety Evaluation Accepting Alternative to Insp of Reactor Pressure Vessel Circumferential Welds ML20217B5241998-04-20020 April 1998 SE Accepting Licensee Request for Approval to Use Alternative Exam Requirement for Brunswick,Unit 1,reactor Vessel Stud & Bushing During Second 10-yr ISI Interval Per 10CFR50.55a(a)(3)(ii) BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 ML20216B1041998-03-0404 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Brunswick Steam Electric Plant, Unit 1 1999-09-30
[Table view] |
Text
_. __. __
APPENDIV R l
AVERAGE DAILY POWER LEVEL DOCMET NO. 050-0325 UNIT BRLINSWICK LINIT 1
' DATE 05/03/83 i COMPLETED BY FRANCES HARRISON I TELEPHONE (919)457-9521 APRIL 1983 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (HWE-NET) (HWE-NET) 1 -6 17 --S 2 -6 18 -5 l 3 -6 19 -5 1 1
i 4 -6 20 -5 i l
5 -6 21 -5 !
6 -5 22 -5 7 -4 23 -5 l 8 -5 24 -5 9 -4 25 -4 10 -3 26 -4 l 11 -4 27 -4 l 12 -4 28 -6 13 -4 29 -6 14 -4 30 -6 15 -4 16 ~4 1 16 - 0 8305100417 830505 PDR ADOCK 05000324 R PDR
a . . . . . . ,
k OPERATING DATA REPORT l
\
~
DOCl(CT NO. 050-0325 DATE 05/03/83 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 OPERATING STATUS
- 1. UNIT NAME: BRUNSWICK UNIT 1 i NOTES I
- 2. REPORTING PERIOD: APRIL 83 I I
- 3. LICENSED THERMAL POWER (MUT): 2436 i i i I
- 4. NAMEPLATE RATING (GROSS MWE): 867.0 l l
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I I f
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 i i
- 7. MAX DEPENDAPLE CAPACITY (NET MWE): 790.0 -------------------------------
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
i 1
- 9. POWER LEVEL. TO WHICH RESTRICTED IF ANY (NET MWE):
i
- 10. RFASONS FOR RESTRICTION IF ANY:
I r THIS YR TO CUMUL MONTH DATE ATIVE ;
l s
- 11. HOURS IN REPORTING PERIOD 719.00 2879.00 53640.00 !
- 12. NUMBER OF HOURS REACTOR CRITICAL .00 .00 33588.47 l
- 13. REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10
- 14. HOURS GENERATOR ON LINE .00 .00 31970.03
- 15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00 [
- 16. GROSS THERMAL ENERGY GEN. (MWH) .00 .00 63896018.86 d
- 17. GROSS ELEC. ENERGY GEN. (MWH) .00 .00 21062188.00
- 19. NET ELEC. ENERGY GENERATED (NWH) -3497.00 -13915.00 20211204.00
- 19. UNIT SERVICE FACTOR .00 .00 59.60
- 20. UNIT AVAILABILITY FACTOR .00 . 00 59.60
- 21. UNIT CAP. FACTOR (USING MDC NET) .62 .61 47.70
- 22. UNIT CAP. FACTOR (USING DER NET) - 59 .59 45.89 i
- 23. UNIT FORCED OUTAGE RATE 00 .00 24.03 l
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): ;
i I
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 06/23/83 !
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)
- FORCAST ACHEIVED l INITIAL CRITICALITY --------
INITIAL ELECTRICITY -------- --------
COMMERCIAL OPERATION -------- --------
l 1.16 - 9 i
APPENDIX DOCKET No.. 050-325 UNIT: Brunswick No.1 DATE: May 1983 COMPLETED BY: Frances liarrison OPERATIONS SUmfARY BRUNSWICK UNIT NO. 1 Brunswick Unit No. I was shut down the entire month of April for a refueling /
maintenance outage.
There are 948* BWR and 160 PWR spent fuel bundles in the Brunswick No. 1 fuel j pool.
I
- 472 bundles have been moved to spent fuel during refueling; of these, 180 will remain in the pool when the core is reloaded.
I
{
l t
)
I i !
l
, i l
! l l
i l
1 ,
! l 1
l I
I t 1
DOCKET NO. 050-0325 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunswick 1 DATE Mnv 1981 COMPLETED BY Frances liarrison REPORT MONTH April 1983 TELEPilONE (919) 457-9521 w.
e _ ci 4.5.
c
%. Date E. k ,,$ !2 ?5b -5 3 E Iivent g ?"
og go Cause & Corrective Action to g g .5!
MU g" CO E j Ui j RCP"'I # Prevent Recurrence 6
83-116 821211 S 719 C *4 NA RC FUELXX Refueling Outage i
i o
I 2
- Continued from previous month 3 4 F: Forced Reason: Method: Exhibit G. Instructions S: Scheduled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entsy Sheets for Licensee C Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatwy Restriction 0161)
E-Operator 1. iining & Ucense Examination i-Continuations t -
F-Administrative S-Load Reductions s G-Operational Error (Explain) 6-Other Exhibit 1. Same Source 19/77) Il-Other (Explain) i
l I
I i
l l
DOCKET NO.: 050-324 I UNIT: Brunswick 2 l DATE: April 1983 ;
COMPLETED BY: Frances Harrison i
f
)
I i
Effective with the enclosed monthly report, the Brunsuick units have completed t
I a conversion to a newer computerized system for reporting operating data. Small !
"round-off" variances can be observed when compared to earlier reports due to small software differences. i l.
r i
k I
b I
i 1
t i
l r
i t
l l
t
APPENDIX B AVERAGE DAILY POWER LEVEL i .
j DOCr(ET NO. 050-0324 :
j UNIT BRUNSWICK UNIT 2 +
1 DATE 05/03/83 !
! COMPLETED BY FRANCES HARRISON
] TELEPHONE (919)457-9521 ,
i .
APRIL 1983 i 1
- DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL 4
(MWE-NET) (MUE-NET)
! 1 570 17 -9 l
l 2 782 18 -9 i !
I 3 769 19 -9 j i
s 4 783 20 -9 ;
t 1
i 5 785 21 -9 ,
} 6 783 22 -10 '
i
! 7 781 23 -10 i 8 551 24 -11 i
25 -12 l i '9 -12 1
10 -10 26 -12 j
$- 11 -10 27 -11 1'
i j 12 -10 28 -10 e
l 13 -9 29 -9 ,
14 -9 30 -9 1
15 -9 l 16 -9 ,
t i
i 1.16 - O r
l
,- - -,e ~. . - - ~ _ . . , . - . _ ,_ ___,_n, __n,,,- .-, ,. w -- m
t I
UPERATlNG DATA Rt. PORT DOCHET NO. 000-0324 ,
DATE 05/0E/83 CONP' ETED DY FRANCE 9 HARRISDN T EL EPH0 t>E ( 9 .1 9 ) 4 5 7 - 9 5 2 1 i i
1 OPERATIts STATUS l
i UNIT NAME: PRUNSWICK UNIT 2 ! 60TES i
. t 2 RFPORTiND PERIOD: APRIL B3 i e i t
7 LICENSED 7HERNAL POWER (MWT): 2436 ! ! l I
- 4. NAMEPLATE RATING (GRUSS MWE): 867 o i ,
i
- 5. DESIGN ELFCTRICAL NATING (NE. MWL): 821.0 t i l
(
- 6. MAX DEPENDABLF Cof'AClTY (GROSS MWn)- 815.0 1 l
- 7. MAX DEPENI ABLE CAPACITY (NET MWE)- 700 0
- 8. IF CiiANGES OCCUR [N EAPACITY RATINGS (ITEMS 7 THRU 7) SINCE LAST NEPORT, !
I GIVE REoSONS:
- 9. Pois.R LEVEf TO WiiICii RdSTRICTED IF ANY (NEl HWE ) : ,
10 REASONS FOR RESTRICTION IF arf - l i
l THIS 's N TO CUNUL MONTH DOTE ATIVE
- 11. HOURS IN RFi'ORTIlh. FLRIOD 719 00 2079.00 65664.00 l
- 12. NUI1FER OF N0bRS REACTOR CRITICAL 247.-10 21 L 1.12 40887.44 l
- 13. RFACTOR RESERVE 4HUTDOWN HMS .00 00 .00 l
- 14. HOURS GLNERATOR ON LINE f86 65 2007.80 39158.62 ,
- 15. UNIT RESERVE SHUTDOLlN HOURS .00 00 00 l
- 16. GRGAS TliEGMAL ENf~RGY GEN. (MWH) 428342.34 43 9309.70 70634293.On l
- 17. GROSS ELEC. ENERGY GEN. (MWH) 143513.00 t466846.00 23493538.00
- 18. NET ELEC. ENERGY oft,ERATED (MWH) 134063.00 t4i4706 00 22506632.00 SG.11 {
j 19. UNIT SERVICL irACTOR 25.96 M . 74 j
- 20. UNIT AVAILABILITY FACT 0" 25 06 ,9 '/ 4 58.11 i
- 21. UNIT CAP FACTOR (USING MDC NET > 23.60 6;.20 43.39 ?
22 (! NIT CAi" i/ ACTOR (USING DER NET) 22 71 S+. 65 41.75 {
- 23. UN1T FOCCED OUTAGE RATE 00 1 4R 16 12 (
- 24. SNUTDOWNS SCHED. DVER NEXT 6 MONTHS (T f PE, DATE. AfiD DUR4T10N OF EACH)- l i
i Maintenance / Condenser Outage- 9-3-83 22 weeks
- 25. 3 F SiiU i D aia N AT t:ND i REPORT H.RIOD, 7 ESTINATED DATE OF 4 TART U- 03/09/83 t
I 26. UNITS IN 1EST STATUS (PRIOR TO C0rW RCIA! OPERATTON) iORCART ACHEIVETi i
] NT T [ A! i. . e: ' 'IniITY
- ~ ~ ~ - - - - -
- ----- - - - - - 1 IN17IAI ElECThICiTY I i
j b['id E Rb l bb OI(kb [ON ~ ~ ~ ~ ~ "'-~~~~
t
]
i f
I
- 3 -v i
gm g.Wowg*en'
t I
S/RV FAILURE / CHALLENGES REPORT l I
DATE: 3 January 1983 j TIME OF OCCURENC": 0233 k
DETAILS OF S/RV's FAILURE: Following a reactor scram with MS1V closure, S/RVs j lifted and resented automatically to control initial pressure transient. Later, tya S/RVs were cycled manually to control reactor pressure. Both S/RVs lifted and ;
reseated normally. B21-F013B, B, C, F, G, K auto-lifted. Later during the transient, B21-F013K and B21-F013B were manually opened to control reactor pressure.
l l
l l
\ l t
l N
f l
e i
I i
I I
i l i
i (
(
f t
i I
! f -
1 I
L__ _ - - - - - _ _ _ - _ _ _ - _ . . .__ _ _ _ _
APPENDIX DOCKET NO.: 050-324 UNIT: Brunswick No. 2 DATE: April 1983 COMPLETED BY: Frances liarrison OPERATIONS
SUMMARY
BRUNSWICK UNIT NO. 2 Brunswick Unit No. 2 operated at 25.96% availability factor for the month of April with a 23.60% capacity factor. There were two power reductions and one scheduled outage. They are detailed in Appendix D, the unit shutdowns and power reductions log.
There are 424 BWR and 144 PWR. spent fuel bundles in the Brunswick No. 2 fuel pool.
l I
i I
( I 8
9 .
3
/
7 SF 0
- N 7 : :
.o
) 3 SF c
1 hr o ec de ud l
e 8 d 3 0 D a
4 t 0 e 8
2 IIGFEDCBAR
- - - e S Hg -
OOAORRMEa tp dp ee aqs hemegl fiu o r a ia r u e unin er tp 5 i nt (Eott siot ognnm ai l e 3 2 $3!
xnr r ae .
a a Ty r
nn 3 EgE pllia a
t r ct e F 5 i
nrEviR ene oa
) r is fil o gnt i r Tu r
(
r E &ci t e
s e t(
B 5@3 x L o E in x pl c pl ai e n a j.g n s i n U
) e E
)
1
@gY -
6g 5h .
N I
x T a
S mi R H n E U a
t P T i
o R L O D n pe vEci e R O -
o N W A oen ns r T t t e M N
- e S O
N A T N 3
i f D P
X A O 654
- - - 321M X Nu,E p W OLC AMMe t 0?g r E t oo uaah R han o uud t
nno i l R edt r
ml i a aa :l X '. 1 E
Rn i ctc rS X 9 D eu X fo 8 U da Sa X -
3 C ut cm ei r
a.
X X
". T I -
O -
t in o m . N S
os n
s 5 4 D C u O a P C E 0EEfE o l r
e a TM D x 1 vn r x v u E P UO h 6et h O e nae s L L NC i
b 1 nr
) t yPir b u t c & E P T E I T EK R Sp ei t
i t
t t a Ri oC HEDNT I
ehaG per g
e c no ODAA S
a r ea -
ot t I e ut r r
r oe r NBTM N EYEE.O s ion e ct m ( fns n Lr o or t i e c v S E u e e o Lfc ( F M B 0 u
r RiDi
) c eao t
9 1
r a r 5 a y u 0 c Fnt e i s an s 9 n n -
le e ) c 1 s 0
( e e 9 w 3 N 4 s 8 i 2 U 5 3 c 4 7 H k R - a E 9 r 2 G -
5 r 2 i 1 s
. o n .
Il \1j
DOCKET NO. 050-0324 UNIT SHUIDOWNS AND POWER REDUCTIONS UNIT NAME Brunswick 2 DATE May 1983 April 1983 COMPLETED BY Frances Harrison REPORT MONTil TELEPHONE (919) 457-9521 w.
c c re % wE li C" No' Date "E- 5 _3 $ 753 f Event 5%
??
$*3 g
Cause & Corrective Action to p 3 .3 0 5ge OO 2 y EE j d5 RePori # "i '
3' Prevent Recurrence 83-032 830401 F .0 A 5 NA ZZ XXXXXX Reduced power to withdraw control rods following repair of rod block monitor channel A/B.
l I 2 3 4 F: Forced Reason: Method: Exhibit G lastructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restrictien 0161)
E-Operator Training & License Examination 4-Continuations -
F Administrative 5-Load Reductions 5 G Ornational Error (Explain) (-Other Exhibit I - Same S>urce 2
(9/77) 11-01her (Explain)
s DOCKET NO. 050-0324
' UNIT SHUTDOWNS AND POWER REDUCTIONS Brunswick 2 UNIT NAME DATE Mnv 1983 COMPLETED BY Frances Harrison -
REPORT MONTil April 1983 (919) 457-9521 TELEPHONE
% ~
c_
E t:
ri E
.3 c.o Li censee c=t S"
- c. Cause & Corrective
". 7 .E M o No. Date g 3g g jg5 Event u? E.3 Action to H
$E 5 jig Report # did u Prevent Recurrence 6
83-033 830403 S .0 B 5 NA ZZ XXXXXX -
Reduced power for rod improve-ment.
I l
i 1 2 3 4 F: Forced Reason: Method: Exhibit G - instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation os Data B-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3-Automatic Scram. Event Report (LER) File (NUREG.
D-Regulatory Restriction 0161)
E-Operator Training & Ucense Examination 1-Continuations -