APPENDIV R l
AVERAGE DAILY POWER LEVEL DOCMET NO. 050-0325 UNIT BRLINSWICK LINIT 1 DATE 05/03/83 i
COMPLETED BY FRANCES HARRISON I
TELEPHONE (919)457-9521 APRIL 1983 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (HWE-NET)
(HWE-NET) 1
-6 17
--S 2
-6 18
-5 3
-6 19
-5 1
1 i
4
-6 20
-5 i
l 5
-6 21
-5 6
-5 22
-5 7
-4 23
-5 l
8
-5 24
-5 9
-4 25
-4 10
-3 26
-4 11
-4 27
-4 l
l 12
-4 28
-6 13
-4 29
-6 14
-4 30
-6 15
-4 16
~4 1 16 - 0 8305100417 830505 PDR ADOCK 05000324 R
a k
OPERATING DATA REPORT l
\\
DOCl(CT NO. 050-0325 DATE 05/03/83
~
COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 OPERATING STATUS 1.
UNIT NAME: BRUNSWICK UNIT 1 i NOTES I
2.
REPORTING PERIOD: APRIL 83 I
I 3.
LICENSED THERMAL POWER (MUT): 2436 i
i i
4.
NAMEPLATE RATING (GROSS MWE): 867.0 l
l I
f 5.
DESIGN ELECTRICAL RATING (NET MWE): 821.0 I
I 6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 i i
7.
MAX DEPENDAPLE CAPACITY (NET MWE): 790.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
i 1
9.
POWER LEVEL. TO WHICH RESTRICTED IF ANY (NET MWE):
i
- 10. RFASONS FOR RESTRICTION IF ANY:
I r
THIS YR TO CUMUL MONTH DATE ATIVE l
s
- 11. HOURS IN REPORTING PERIOD 719.00 2879.00 53640.00
- 12. NUMBER OF HOURS REACTOR CRITICAL
.00
.00 33588.47 l
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00 1647.10
- 14. HOURS GENERATOR ON LINE
.00
.00 31970.03
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
[
- 16. GROSS THERMAL ENERGY GEN. (MWH)
.00
.00 63896018.86 d
- 17. GROSS ELEC. ENERGY GEN. (MWH)
.00
.00 21062188.00
- 19. NET ELEC. ENERGY GENERATED (NWH)
-3497.00
-13915.00 20211204.00
- 19. UNIT SERVICE FACTOR
.00
.00 59.60
- 20. UNIT AVAILABILITY FACTOR
.00
. 00 59.60
.62
.61 47.70
- 22. UNIT CAP. FACTOR (USING DER NET)
- 59
.59 45.89 i
- 23. UNIT FORCED OUTAGE RATE 00
.00 24.03 l
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
i I
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 06/23/83
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED l
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l
1.16 - 9 i
APPENDIX DOCKET No..
050-325 UNIT:
Brunswick No.1 DATE: May 1983 COMPLETED BY:
Frances liarrison OPERATIONS SUmfARY BRUNSWICK UNIT NO. 1 Brunswick Unit No. I was shut down the entire month of April for a refueling /
maintenance outage.
There are 948* BWR and 160 PWR spent fuel bundles in the Brunswick No. 1 fuel j
pool.
I
- 472 bundles have been moved to spent fuel during refueling; of these, 180 will remain in the pool when the core is reloaded.
I
{
t
)
I i
l i
l l
l i
l 1
1 l
I I
t 1
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
050-0325 UNIT NAME Brunswick 1 DATE Mnv 1981 COMPLETED BY Frances liarrison REPORT MONTH April 1983 TELEPilONE (919) 457-9521 w.
4.5 c
e _
ci og Cause & Corrective Date E.
k,,$
?5b g ?"
go Action to E
Iivent g
g.5!
2
-5 3 g"
j Ui j RCP"'I #
MU Prevent Recurrence CO E
6 83-116 821211 S
719 C
- 4 NA RC FUELXX Refueling Outage i
i o
I 2
- Continued from previous month 3
4 F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entsy Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatwy Restriction 0161) i-Continuations -
t E-Operator 1. iining & Ucense Examination F-Administrative S-Load Reductions s
G-Operational Error (Explain) 6-Other Exhibit 1. Same Source 19/77)
Il-Other (Explain) i
l I
I i
l l
DOCKET NO.:
050-324 I
UNIT: Brunswick 2 l
DATE: April 1983 COMPLETED BY: Frances Harrison i
f
)
I i
Effective with the enclosed monthly report, the Brunsuick units have completed t
I a conversion to a newer computerized system for reporting operating data.
Small "round-off" variances can be observed when compared to earlier reports due to small software differences.
i l
r i
k I
b I
i 1
t i
l r
i t
l l
t
APPENDIX B AVERAGE DAILY POWER LEVEL i
j DOCr(ET NO. 050-0324 j
UNIT BRUNSWICK UNIT 2
+
1 DATE 05/03/83 COMPLETED BY FRANCES HARRISON
]
TELEPHONE (919)457-9521 i
APRIL 1983 i
1 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL 4
(MWE-NET)
(MUE-NET) 1 570 17
-9 l
l 2
782 18
-9 i
I 3
769 19
-9 j
i s
4 783 20
-9 t
1 i
5 785 21
-9
}
6 783 22
-10 i
7 781 23
-10 i
8 551 24
-11 i
i
'9
-12 25
-12 l
1 10
-10 26
-12 j
11
-10 27
-11 1'
i j
12
-10 28
-10 e
l 13
-9 29
-9 14
-9 30
-9 1
15
-9 l
16
-9 t
i i
1.16 - O r
l
,- - -,e ~.. - - ~ _
___,_n,
__n,,,-
,. w -- m
t I
UPERATlNG DATA Rt. PORT DOCHET NO. 000-0324 DATE 05/0E/83 CONP' ETED DY FRANCE 9 HARRISDN T EL EPH0 t>E
( 9.1 9 ) 4 5 7 - 9 5 2 1 i
i 1
OPERATIts STATUS l
i UNIT NAME: PRUNSWICK UNIT 2
! 60TES i
t 2
RFPORTiND PERIOD: APRIL B3 i
e i
t 7
LICENSED 7HERNAL POWER (MWT): 2436 l
I 4.
NAMEPLATE RATING (GRUSS MWE): 867 o i
5.
DESIGN ELFCTRICAL NATING (NE. MWL): 821.0 t
i i
l 6.
MAX DEPENDABLF Cof'AClTY (GROSS MWn)- 815.0 1
(
l 7.
MAX DEPENI ABLE CAPACITY (NET MWE)- 700 0 8.
IF CiiANGES OCCUR [N EAPACITY RATINGS (ITEMS 7 THRU 7) SINCE LAST NEPORT, I
GIVE REoSONS:
9.
Pois.R LEVEf TO WiiICii RdSTRICTED IF ANY (NEl HWE ) :
10 REASONS FOR RESTRICTION IF arf -
l i
l THIS
's N TO CUNUL MONTH DOTE ATIVE
- 11. HOURS IN RFi'ORTIlh. FLRIOD 719 00 2079.00 65664.00 l
- 12. NUI1FER OF N0bRS REACTOR CRITICAL 247.-10 21 L 1.12 40887.44 l
13.
RFACTOR RESERVE 4HUTDOWN HMS
.00 00
.00 l
- 14. HOURS GLNERATOR ON LINE f86 65 2007.80 39158.62
- 15. UNIT RESERVE SHUTDOLlN HOURS
.00 00 00 l
- 16. GRGAS TliEGMAL ENf~RGY GEN.
(MWH) 428342.34 43 9309.70 70634293.On l
- 17. GROSS ELEC. ENERGY GEN. (MWH) 143513.00 t466846.00 23493538.00
- 18. NET ELEC. ENERGY oft,ERATED (MWH) 134063.00 t4i4706 00 22506632.00
{
19.
UNIT SERVICL irACTOR 25.96 M. 74 SG.11 j
j
- 20. UNIT AVAILABILITY FACT 0" 25 06
,9
'/ 4 58.11 i
23.60 6;.20 43.39
?
22
(! NIT CAi" i/ ACTOR (USING DER NET) 22 71 S+. 65 41.75
{
- 23. UN1T FOCCED OUTAGE RATE 00 1 4R 16 12
(
- 24. SNUTDOWNS SCHED. DVER NEXT 6 MONTHS (T f PE, DATE. AfiD DUR4T10N OF EACH)-
l i
i' Maintenance / Condenser Outage-9-3-83 22 weeks H.RIOD, ESTINATED DATE OF 4 TART U-03/09/83 7
- 25. 3 F SiiU i D aia N AT t:ND i REPORT t
I
- 26. UNITS IN 1EST STATUS (PRIOR TO C0rW RCIA! OPERATTON) iORCART ACHEIVETi i
] NT T [ A! i.. e: ' 'IniITY
~ ~ ~ - - - -
IN17IAI ElECThICiTY 1
I i
b['id E Rb l bb OI(kb [ON
~ ~ ~ ~ ~
"'-~~~~
j t
]
i f
I
- 3
-v i
gm g.Wowg*en'
t I
S/RV FAILURE / CHALLENGES REPORT l
I DATE:
3 January 1983 j
TIME OF OCCURENC":
0233 k
DETAILS OF S/RV's FAILURE:
Following a reactor scram with MS1V closure, S/RVs j
lifted and resented automatically to control initial pressure transient. Later, tya S/RVs were cycled manually to control reactor pressure.
Both S/RVs lifted and reseated normally.
B21-F013B, B, C, F, G, K auto-lifted.
Later during the transient, B21-F013K and B21-F013B were manually opened to control reactor
)
pressure.
l l
l l
\\
l t
l N
f l
e i
I i
I I
i l
i i
(
(
f t
i I
f 1
IL__
APPENDIX DOCKET NO.:
050-324 UNIT:
Brunswick No. 2 DATE: April 1983 COMPLETED BY: Frances liarrison OPERATIONS
SUMMARY
BRUNSWICK UNIT NO. 2 Brunswick Unit No. 2 operated at 25.96% availability factor for the month of April with a 23.60% capacity factor.
There were two power reductions and one scheduled outage. They are detailed in Appendix D, the unit shutdowns and power reductions log.
There are 424 BWR and 144 PWR. spent fuel bundles in the Brunswick No. 2 fuel pool.
l I
i I
8
(
I 3
9
/
N 7
SF 0
.o 7
3
)
SF 1
c o
hr ec de ud l
8 e
d 3
D 0
a 4
te 0
8 2
Hg -
IIGFEDCBAR S
e OOAORRMEa tp dp ee aqsfiu o hemegl er r u unin 5
r a ia e tp i nt ai l e 3
nnm 2
$3!
( t iot s
Eot og ae r
xnr r
a a Ty nn EgE ct 3
pllia e
t r 5
i EviR F
anr ene oa r
is fil
)
o nt r
g i Tu r
5@3 r
e e B
&ci t(
(
t s
E o
E x
Lin x
pl c
pl j.g ai en a
n i
@gY -
s U
)
e n
1 N
)
E 6g 5h.
T I
xa S
mi R
H na E
U i
P T
t R
L O
D o
e Eci R
O n
o N
p v e oe n T
W A
r n t
t se M
N S
e ON A
T ND i
3 f
PO 321M X
Nu,E A
W 654 X
p AMMe 0?g E
OLC t
r uaah R
t oo i
nno t
han o uud l
R edt ml aa :
E l
i a X
1 r
D t S X
9 Rn i c eu r
X fo 8
U c
da Sa X
3 C
ut cm X
T r
I ei a.
X O
t o m N
in S
os ns 5
4 D
C u
O a
P C
E 0EEfE l
e a
T M D
r x
1 vn x
v u
E P U O o
r e
s L
N C h
6et h
O nae LE E i
1 nr Pi I
y r b u
t c &
P T T K b
t i
)
ei t
t E
t R Sp RioC H E t
D N T a
e ehaG g
c no O D I
A A per NBTM N ea -
e ut r S
ot t I r
a s ion e
ct EYEE.O oe r
r r
m fns n
(
o e
Lr c
i t
v or S
E u
e e
Lfc
(
F M B 0 o
RiDi 9
r a r
5 t
c u
) eao a y u 0 1
rc Fnt n 9 n n
e i s a s
le
)
c 1
s 0 e e e
9 w 3
(
N 4
s 8
i 2
5 3
c 4 U
7 H
k R
a E
9 r
2 G
5 r
2 i
1 s on Il
\\1j
UNIT SHUIDOWNS AND POWER REDUCTIONS DOCKET NO.
050-0324 UNIT NAME Brunswick 2 DATE May 1983 REPORT MONTil April 1983 COMPLETED BY Frances Harrison TELEPHONE (919) 457-9521 w.
% wE c
c re f
5%
$*3 li C" "E-5 _3 753 Cause & Corrective No' Date Event
??
g Action to p
3.3 0
5ge 3'
y EE j RePori #
"i '
Prevent Recurrence OO 2
d5 83-032 830401 F
.0 A
5 NA ZZ XXXXXX Reduced power to withdraw control rods following repair of rod block monitor channel A/B.
l I
2 3
4 F: Forced Reason:
Method:
Exhibit G lastructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restrictien 0161) 4-Continuations -
E-Operator Training & License Examination F Administrative 5-Load Reductions 5
G Ornational Error (Explain)
(-Other Exhibit I - Same S>urce 2
(9/77) 11-01her (Explain)
s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
050-0324 UNIT NAME Brunswick 2 DATE Mnv 1983 REPORT MONTil April 1983 COMPLETED BY Frances Harrison TELEPHONE (919) 457-9521
~
c_
ri
.3 c.o S"
Li ensee c=t c.
Cause & Corrective E t:
E 7.E M c
No.
Date g
3g g
jg5 Event u?
E.3 Action to o
H
$E 5
jig Report #
did u
Prevent Recurrence 6
83-033 830403 S
.0 B
5 NA ZZ XXXXXX Reduced power for rod improve-ment.
I l
i 1
2 3
4 F: Forced Reason:
Method:
Exhibit G - instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation os Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG.
D-Regulatory Restriction 0161) 1-Continuations -
4 E-Operator Training & Ucense Examination F-Administrative 5-Load Reductions 5
G-Operational Error (Explain) 6-Other Exhibit I-Same Source 19/77)
Il-Other (Explain) t e