Forwards Addl Justification Supporting Adequacy of Test of Electrical Load to Satisfy License Condition 2.C & WCAP-8921, Setpoint Study,Duke Power,William B McGuire Nuclear Plant,Units 1 & 2. Rept Withheld (Ref 10CFR2.790)
ML20073T136
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/05/1983
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19301C220 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8305100347
Download: ML20073T136 (2)


Text

. - -

=

9 Duxn POWER GOMMNY P.O. ISOX $3180

('IIAHLOTTE, N.C. 28242 IIAL II. TUCKER retersnome May 5, 1983 po4pm>-4sai j

mum.m

.mu. --m Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: McGuire Nuclear Station Docket No. 50-369

Dear Mr. Denton:

A loss of electrical load test was conducted at McGuire Unit I to satisfy condi-tion 2.C. (11).g of Facility Operating License No. NPF-9.

The NRC stated in Supplement No. 6 to the McGuire Safety Evaluation Report (NUREG-0422) that the test method was inadequate to satisfy the license condition and that the test must be performed as required before exceeding 50% power level. The attachment to this letter provides additional justification for Duke Power's position that the previous test was adequate to satisfy the license condition, and that another test need not be performed. We request that the NRC provide their concurrence with this position by May 10, 1983, the date when 50% power is expected to be achieved.

In support of this request, attached is a copy of WCAP-8921, "Setpoint Study, Duke Power Company, William B. McGuire Nuclear Plant, Units 1 and 2".

Please note that this document contains information proprietary to Westinghouse Electric Corporation. Accordingly, it is respectfully requested that the information which is proprietary to Westinghouse be withheld from public disclosure in accordance with 10 CFR Section 2.790 of the Commission's regulations. An Application for Withholding will be submitted later along with an affidavit signed by Westinghouse, the owners of the information, which will set forth the basis on which the infor-mation may be withheld from public disclosure by the Commission.

Please advise if there are any questions.

Very truly yours,

[' 'We Hal B. Tucker REH:j fw Attachment f

OA Gh"Y 5

8305100347 830505 DR ADOCK 05000369 PDR 9y

,.,--,--+v-

- - - - - - _ + - -, - - - - - -,

.,----.-3

-,w,,+y p--

g-

,,,,,y

--,,.-,,,-,-,--,,,.-,a y,y,,,y.,

--yw

Harold R. Denton May 5, 1983 Page 2 cc:

(w/o WCAP)

Mr. James P. O'Reilly, Regional Administ;ator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303 Mr. W. T. Orders NRC Resident Inspector McGuire Nuclear Station

._-