Application for Amends to Licenses DPR-77 & DPR-79,modifying Ts,By Revising Section 5.3.1, Fuel Assemblies, Per GL 90-02,suppl 1
ML20073R962
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/07/1994
From: Fenech R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20073R967 List:
References
GL-90-02, GL-90-2, TAC-M77246, TAC-M77247, NUDOCS 9402160200
Download: ML20073R962 (2)


Text

a a

.,, - +

a.-

4

'o i

k 1

i Tennessee Valley Authonty, Post Office Box 2000. Soddy Daisy. Tennessee 37379-2000 i

l 1

1 i

Robert A. Fenech Vice President. Sequoyah fJuclear Plant February 7, 1994 TVA-SQN-TS-93-19 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk.

l Washington, D.C. 20555 Gentlemen:

j f

In the Matter of

)

Docket Nos. 50-327

{

Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CHANGE 93-19,

" SUBSTITUTION OF FILLER RODS FOR FUEL RODS" i

Reference:

TVA letter to NRC dated October 6, 1992, "Sequoyah.Nuclehr Plant (SQN) - Technical Specification (TS) 90 Partial Withdrawal Request (TAC Nos. 77246 and 77247)"

In accoedance with 10 CFR 50.90, we are enclosing a requested amendment to Licenses DPR-77 and DPR-79 to change the TSs of SQN Units 1 and 2.

This TS change was previously submitted as part of TS Change 90-12.

However, as the result of additional guidance provided in Generic Letter (GL) 90-02, Supplement 1, the request for the change was withdrawn in the l

above referenced letter.

SQN is presently resubmitting this change request utilizing the guidance provided in the'GL.

The proposed TS change is identified in Enclosure 1.

The justification for the proposed TS change is provided in Enclosure 2.

A proposed determination of no significant hazards. consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3.

TVA requests a 45-day implementation period for this TS change following issuance.

L~

140042 L

9402160200 940207 7

800f-PDR ADOCK-05000327 1

P ppg

.y sh a

3 j

l*'

1 1

I U.S. Nuclear Regulatory Commission

)

Page 2 i

February 7, 1994 i

i i

5 i

Please direct questions concerning this issue to J. D. Smith at (615) 843-6672.

l Sincerely, j

Robert A. Fenech l

Sworn to and subscribed before me j

this 724 day of 8 1994 Notary Public

/j My Commission Expires y/ f/ 77 i

Enclosures cc (Enclosures):

j Mr. D. E. LaBarge, Project Manager i

U.S. Nuclear Regulatory Commission 1

One White Flint, North i

11555 Rockville Pike l

Rockville, Maryland 20852-2739 i

Mr. Michael H. Mobley, Director (w/o Enclosures) l Division of Radiological Health j

3rd Floor i

L & C Annex l

401 Church Street Nashville, Tennessee 37243-1532 i

l NRC Resident Inspector j

Sequoyah Nuclear Plant i

l 2600 Igou Ferry Road l

Soddy-Daisy, Tennessee 37379-3624 l

1 j

Regional Administrator U.S. Nuclear Regulatory Commission I

Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 d

l i

i 0

i

_ _