._

VIHOINIA ELECTHIC AND POWEH COMPANY Ricnwoxu,vinoisir ununi i

February 1, 1994 U. S. Nuclear Regulatory Commission Serial No.94-004 Attention: Document Control Desk NL&P/GSS:

RO Washington, D.C. 20555 Docket Nos.

50-338 l

50-339 l

License Nos. NPF-4 l

NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 SAFEGUARDS CONTINGENCY PLAN --REVISION 4 Pursuant to 10 CFR 50.54 (p) (2), Virginia Electric and Power Company hereby submits the enclosed changes to the North Anna Power Station Safeguards Contingency Plan. This revision incorporates a new format for the Safeguards Contingency Plan. A description and justification of the changes are enclosed. We have determined that these changes and clarifications do not reduce the effectiveness of the plan.

l The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.

Very truly yours, i

g p -j.

W. E. Siedah' Senior Vice President - Nuclear Enclosure (Contains Safeguards Information)

(Original and three copies) i p(p'3r p,

~

ENCLOSURE CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED p$g20gggggo$8 s

F

I cc-D. S. Nuclear Regulatory Commission P. O. Box 2257 Atlanta, GA 30323 Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station n

l l

ENCLOSURE CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED