Text
_ _ _ _
l Effect M rch 16, 1983 OPERATIO N AL QUALITY ASSURANCE PROGRAM DESCRIPTION (WPPSS-QA-004)
APPROVED:
I- / I M Director, Licensing & Assurance Date ORIGINAL ISSUE: May 10,1978 l
Washington Public Power Supply System Richland, Washington 99352
$D 0
PE WP S C
PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM OPERATIONAL ii QUALITY ASSURANCE PROGRAM DESCRIPTION 7
MANAGEMENT STATEMENT h
It is the policy of Washington Public Power Supply System (hereinafter called the " Supply System") to design, construct and operate its nuclear power plants without, jeopardy to the health and safety of the public.
In support of this policy, the Supply System has established a Corporate Quality Assurance Program that is described in the following three docu-ments:
1.
Quality Assurance Program for Design and Construction.
2.
ASME Quality Assurance Manual (Design and Construction) 3.
Operational Quality Assurance Program Description (Operations Phase).
The three documents contain the official Supply System Quality Assurance policies. Adherence by all affected Supply System organizations is mandatory.
The Operational Quality Assurance Program Description meets the applicable requirements of 10 CFR 50, Appendix B.
The Licensing & Assurance Directorate is mandated the responsibility and authority for establishing, administering and assuring implementation of the Supply System Corporate Quality Assurance Program. The Licensing &
Assurance Director has the responsibility and authority, including stop work authority, to perform actions necessary to accomplish this mandate as delineated in the Corporate Quality Assurance Program manuals.
l The Licensing & Assurance Directorate has my delegated approval authority 1
for the Operational Quality Assurance Program Description and any necessary modifications.
2/14/83 R. L. Fergus n, Manag ng Director /Date FORM: NOS-3 A, REV. 0 l
I WASHINGTON PUBLIC POWER SUPPLY SYSTEM iii OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
LIST OF EFFECTIVE PAGES PAGE REVISION 1-iv 7
1 1-29 7
2 2-5 7
3 3-3 5
4-1 & 4-2 5
5-1 5
6 6-3 7
7-1 5
7-2 & 7-3 6
8-1 & 8-2 5
9-1 & 9-2 7
10-1 & 10-2 7
11-1 & 11-2 5
12-1 & 12-2 5
13-1 5
14-1 5
15-1 & 15-2 7
l 16-1 5
17-1 & 17-2 5
18-1 5
I-1 & I-2 7
II II-19 7
FORM: NOS-3A, REV. O
av WASHINGTON PUBLIC POWER SUPPLY SYSTEM iv OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
TABLE OF CONTENTS SECTION TITLE N/A Approval Page N/A Management Statement N/A List of Effective Pages N/A Table of Contents 1
ORGANIZATION 2
QUALITY ASSURANCE PROGRAM 3
DESIGN CONTROL 4
PROCUREMENT DOCUMENT CONTROL 5
INSTRUCTIONS, PROCEDURES, AND DRAWINGS 6
DOCUMENT CONTROL 7
CONTROL OF PURCHASED MATERIAL, EQUIPMENT, AND
[
SERVICES 8
IDENTIFICATION AND CONTROL OF MATERIALS; PARTS, AND COMPONENTS 9
CONTROL OF SPECIAL PROCESSES 10 INSPECTION 11 TEST CONTROL 12 CONTROL OF MEASURING AND TEST EQUIPMENT 13 HANDLING, STORAGE, AND SHIPPING 14 INSPECTION, TEST, AND OPERTING STATUS 15 NONCONFORMING MATERIALS, PARTS OR COMPONENTS 16 CORRECTIVE ACTION 17 QUALITY ASSURANCE RECORDS 18 AUDITS APPENDIX I QUALIFICATION REQUIREMENTS APPENDIX II POSITION STATEMENTS FORM: NOS-3A, REV. O
WASHINGTON PUBLIC POWER SUPPLY SYSTEM 11 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
1 - ORGANIZATION 1.1 PURPOSE This section provides a description of the authorities and re-sponsibilities assigned to Supply System organizational units and individuals involved in establishing, implementing, verifying im-plementation, and measuring the overall effectiveness of the ad-ministrative controls and quality assurance program during the initial testing (pre-operational and startup testing) and subse-quent operations phases of Supply System nuclear power plants.
1.2 SUPPLY SYSTEM ORGANIZATION The Supply System organization responsible for establishing, im-plementing, verifying implementation, and measuring the overall effectiveness of the administrative controls and quality assurance program for its nuclear power plants is as depicted in Figures 1-1 through 1-6.
Portions of these activities may be delegated to ex-l ternal organizations qualified to the requirements of this Opera-tional QA Program, hereafter referred to as QA Program, however, the responsibility shall remain with the Supply System.
1.3 MANAGEMENT RESPONSIBILITIES 1.3.1 The Managing Director / Deputy Managing Director is responsible for the establishment of policies and for overall management of Supply System operations. The Managing Director has issued a " Management Statement" which comits the Supply System to design, construct, and operate its nuclear power plants without jeopardy to the health and safety of the public. The Managing Director is the ultimate FORM: NOS-3A, REY. 0
--_J
l WASHINGTON PU8LIC POWER SUPPLY SYSTEM l-2 OPERATIONAL QUAIJTY ASSURANCE PROGRAM DESCRIPTION 7
1.3.1 (contd.)
Supply System authority on matters involving quality. The Managing Director / Deputy Managing Director operates through the Director of Operations, the Director of Licensing & Assurance, the Director of Support Services, and the Chief Financial Officer to provide for engineering, construction, procurement, quality assurance / quality control, and operations activities for all Supply System nuclear power plants.
1.3.2 The Director, Operations, reports to the Managing Director and is responsible for engineering, construction, initial testing, and subsequent operation and maintenance activities for all Supply System nuclear power plants. To accomplish this role, the Director of Operations operates through the Director of Power Generation, the Program Directors (Projects), and the Director of Technology.
1.3.2.1 The Director, Power Generation, reports to the Director of Opera-tions, and is responsible for:
Safe and efficient operation of all Supply System nuclear power a.
- plants, b.
Safe and successful completion of initial testing actvities for WNP-2.
Establishment and monitoring of maintenance systems comon to c.
all nuclear power plants.
d.
Generic Training of Power Generation staff.
FORM: NCS-3A, REY. 0
- r WASHINGTON PUBLIC POWER SUPPLY SYSTEM
'3 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
1.3.2.1 (centd.)
Development of corporate programs and procedures for power e.
generation to ensure uniform application at all nuclear power plants.
s To accomplish this role, the Director of Power Generation operates through the Plant Managers, tne Generation Services & Training Manager, and the WNP-2 Test & Startup Manager.
1.3.2.1.1 The Plant Manager for each of the Supply System nuclear power plants reports to the Director of Power Generation and is directly responsible for safe and efficient operation of the plant in accordance with the requirements of the Operating License, the Plant Technical Specifications, and the Plant Procedures Manual.
Some of the specific responsibilities of the Plant Manager are:
Planning, coordinating, and directing all test, operation, a.
maintenance, and refueling activities subsequent to the issuance of an Operating License.
b.
Authorizing all plant modifications subsequent to the issuance of an Operating License, c.
Qualification and training of plant staff.
d.
Approval and control of procurement documents for safety related items and services.
FORM: NOS-3A, REV. O
PAM WASHINGTON PU8UC POWER SUPPLY SYSTEM l-4 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
1.3.2.1.1 (contd.)
Controlling purchased rquipment and materials intended for e.
plant use.
f.
Establishment and implementation of a calibration program for Measuring & Test Equipment (including installed instruments covered by the Plant Technical Specifications).
g.
Dispositioning of nonconforming items.
h.
Control and maintenance of on-site quality assurance records, i.
Implementation of the in-service inspection program.
The Plant Manager operates through the Operations Manager, the Maintenance Manager, the Technical Manager, the HeaIth Physics /
Chemistry Manager, the Training Manager, and the Administrative Manager. The plant organization and functional responsibilities of key plant personnel are described in Chapter 13 of the Final Safety Analysis Report for the applicable nuclear power plant.
1.3.2.1.2 The Manager, Generation Serv' A t Trainino, reports to the Director of Power Generti n.m/ :s responsible for operations training policy and guiuyse % ce nuclear plants; conduct of central training services for nuclear plant operations; providing support services to the Plant Managers in acquisition, storage, and reporting of operational and maintenance data; planning and sched-uling plant outages for refueling and maintenance S.ctivities; pre-paration/ coordination for review and approval /transm htal to the Nuclear Regulatory Commission or operating reports required by FORM: NOS-3A, REV. 0
l WASHINGTON PUBLIC POWER SUPPLY SYSTEM 1-5 OPERATIONAL m
QUALITY ASSURANCE PROGRAM DESCRIPTION 7
1.3.2.1.2 (contd.)
the applicable plant Technical Specifications; maintenance of a j
common policy for test and startup for nuclear projects; and providing central maintenance and non-destructive examination services.
1.3.2.1.3 The Test & Startuo Manager for WNP-2 reports to the Director of Power Generation and is responsible for supporting the WNP-2 Plant Manager by providing direction and coordination of initial testing activities at WNP-2. See Chapter 14 of the WNP-2 FSAR for a full description of the WNP-2 initial test program.
1.3.2.2 The Program Director for each of the Supply System nuclear projects reports to the Director of Operations and is directly responsible for safe and successful completion of engineering and construction activities for that project. Additionally, the Program Directors l
for WNP-1 and WNP-3 Projects are responsible for safe and success-ful completion of initial testing activities for the respective project. See Chapter 14 of WNP-1 and WNP-3 FSARs for a full de-scription of the respective project's initial test program.
1.3.2.3 The Director, Technoloay, reports to the Director of Operations and is responsible for providing engineering and design control, reactor safety evaluation, nuclear and environmental analysis, plant simu-lator support, nuclear fuel supply, and maintenance / surveillance engineering support as required for each Supply System nuclear plant. The Director of Technology is specifically responsible for:
a.
Corporate design control establishment and maintenance.
b.
Design and engineering for plant system design changes and mod ifications.
FORM: NCS-3 A, REV. O
FMN WASHINGTON PUBLIC POWER SUPPLY SYSTEM l-6 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
1.3.2.3 (contd.)
Planning and over-viewing the implementation of the plant pre-c.
service and in-service inspection.
d.
Technical resolution of nuclear safety, licensing, environ-mental, geological, and radiological issues, e.
Initial fuel supply.
Reload fuel supply, design, and licensing.
f.
g.
Maintaining a current engineering data base for each plant.
To accomplish this role, the Director of Technology, operates through Assistant Directors, Systems Engineering, Generation Engineering, WNP-2 Plant Engineering, and Fuels & Environment.
1.3.2.3.1 The Assistant Director, Systems Engineering, reports to the Director of Technology and is responsible for:
Design and engineering for plant changes and modifications.
a.
b.
System engineering support for plant turnover, c.
The control of the plant design data.
d.
Control of Q-list changes, Design procedures and standards required for plant configura-e.
tion control.
FORM: NOS 3A, REV. O i
PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM y,7 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
1.3.2.3.1 (contd.)
f.
Preparation, maintenance, and distribution control of pre-service and in-service inspection programs, technical overview of program implementation, and preparation of data reports, g.
Materials and welding engineering.
l h.
ASME Code interpretation.
- i. Providing reliability and availability and related analyses.
- j. Providing engineering support in acquiring, operating, and maintaining training simulators.
k.
Providing analyses to demonstrate the response characteristics of training simulators and to certify the validity of the simulation.
1.
Providing plant transient analyses to support operational decision making and. to form a basis for reload licensing and technical specification changes.
1.3.2.3.2 The Assistant Director, WNP-2 Plant Engineering, reports to the Director of Technology and is responsible for:
Coordination and control of the plant design change process, a.
b.
WNP-2 Technical program management and licensing issue resolution.
FORM: NCS-3 A, REV. 0
,.,w r,--
-.nw WASHINGTON PUBLIC POWER SUPPLY SYSTEM l-8 OPERATIONAL ov.
QUALITY ASSURANCE PROGRAM DESCRIPTION 7
1.3.2.3.2 (contd.)
Review of Significant Event Reports and other similar documen-c.
tation of potential safety significance.
d.
Engineering support to the plant staff.
1.3.2.3.3 The Assistant Director, Generation Engineering, reports to the Director of Technology and is responsible for:
Environmental and seismic qualification of plant equipment.
a.
b.
WNP-3 Technical program management and licensing issue resolution.
Construction engineering support for non-generation facilities.
c.
d.
Development and implementation of on-site engineering organi-zation at WNP-3 for the operational phase.
1.3.2.3.4 The Assistant Director, Fuels & Environment, reports to the Director of Technology and is responsible for:
Assuring an adequate and timely supply of high-quality fuel for a.
each plant through fuel cycle planning and surveillance, ac-quisition of fuel and fuel cycle services, technical contract administration and coordination of reload licensing, b.
Review of nuclear fuel designs.
FORM: NCS-3A, REV. 0
PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM l-9 OPERATIONAL m.
QUALITY ASSURANCE PROGRAM DESCRIPTION 7
l 1.3.2.3.4 (contd.)
{
c.
Providing analytical support in areas such as fuel reactor performance, fuel isotopic concentrations and analysis of' off-standard reactor operating conditions.
{
d.
Environmental monitoring and assuring compliance with environ-mental regulations during design, construction and operations.
Review of proposed changes to #the Environmental Technical e.
l Specifications.
f.
Performing off-site environmental, geological and radiological monitoring studies, and providing support to the Plant Managers in the implementation of off-site Environmental Technical Specifications.
g.
Reviewing and/or authoring portions of Safety Analysis Reports and Environmental Reports.
h.
Reviewing, upon request, Reportable Occurrence Reports, Operat-ing Experience Reports, etc.
1.3.3 The Director, Licensing & Assurance,, reports to the Managing Direc-tor and is directly responsible for the definition, direction, and effectiveness of the overall QA program during design, construction, and operations phases of all Supply System nuclear power plants.
Major functions of the Licensing & Assurance organization are:
FORM: NCS-3A, REV. 0
PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM 1-10 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
1.3.3 (contd.)
Establishment and maintenance of assurance programs, nuclear a.
operation standanfs and Directorate procedures which incorpor-ate nuclear safety considerations and comply with the Quality Assurance criteria delineated in Appendix B to 10CFR50.
b.
Assuring through reviews, surveillances, inspections, and audits that Supply System and its suppliers' activities are being per-formed in accordance,with written and approved documents which f
comply with applicable requirements defined by the assurance programs and nuclear operation standards, Assessing the overall effectiveness of assurance programs im-c.
plementation including evaluation of plant performance and reporting conclusions to the Managing Director, d.
Stopping unsatisfactory work and control further processing, delivery or installation of nonconforming material.
Managing accomplishment of independent reviews of plant acti-e.
vities in accordance with the provisions of plant technical specifications.
l f.
Establishment and maintenance of adequate and qualified assur-ance staffing (on-site as well as off-site) levels based on workload analysis.
e s
FCRM: NCS-3A, REV. O
PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM 1-11 OPERATIONAL m.
QUALITY ASSURANCE PROGRAM DESCRIPTION 7
1.3.3 (contd.)
g.
Maintaining cognizance of changing regulatory requirements and providing controlled interface between the Supply System and regulatory agencies to assure that commitment documents receive the necessary degree and depth of reviews prior to transmittal.
h.
Providing licensing support functions in such areas as acquisi-tion and maintenance of nuclear power plant construction per-
~
mits and operating licenses.
The Director of Licensing & Assurance has effective communication channels with all Supply System senior management positions and has no duties or responsibilities unrelated to quality / safety assurance and licensing. To accomplish the above defined role, the Director of Licensing & Assurance operates through the Manager of Opera-tional Assurance Prograns, the Manager of Audits, the Manager of Construction Quality Assurance, and the Manager of Nuclear Safety &
Regulatory Programs. The qualification requirements for this posi-tion are as described in Appendix I, " Qualification Requirements".
1.3.3.1 The Manager, Operational Assurance Programs, reports to the Direc-tar of Licensing & Assurance and is primarily responsible for inte-grating and directing the performance of all quality assurance, quality control,,and safety assurance functions that are necessary to assure that the programs for initial testing and subsequent operation of Supply System nuclear power plants are adequate, that they are being implemented, and that the operating experience is being evaluated and utilized where appropriate to improve the safe-ty of the plants. Some of the specific responsibilities for this position are:
FORM: NCS-3 A, REV. 0
~-
e--
e.w,.,
e-.,,--,s.,
,--,....-,_..,-n,_.,_,
e
.-.n--
l PACS WASHINGTON PUBLIC POWER SUPPLY SYSTEM l-12 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
1.3.3.1 (contd.)
Establishment and maintenance of the Operational QA Program a.
Description (WPPSS-QA-004) and QA, QC, and Safety Assurance procedures utilized by the Operational Assurance staff.
b.
Providing for review of plant documents (such as programs, plans, and procedures) from quality and safety assurance aspects.
QA/QC functions related to procurement of nuclear fuel.
c.
d.
Providing supporting QA/QC staff to the Plant QA Managers in order to assure adequate coverage of peak period activities (such as maintenance, modification, refueling, and in-service inspections).
To stop unsatisfactory work and control further processing, e.
delivery, or installation of nonconforming material.
The Manager of Operational Assurance Programs operates through the Plant QA Managers, the Nuclear Safety Assurance Manacers and staff engineers. The qualification requirements for this position are as described in Appendix I, " Qualification Requirements".
1.3.3.1.1 The Plant GA Manager (located on-site) for each nuclear plant reports to the Manager of Operational Assurance Programs and is directly responsible for all in-plant QA functions that are neces-sary to assure that documents (such as programs, plans, and pro-cedures) to be used for the performance of plant activities are FCRM: NCS 3A, REV. O
PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM 1-13 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
1.3.3.1.1 (contd.)
acceptable from quality assurance aspects and that they are being implemented. The Plant QA Manager has no duties or t
responsibilities unrelated to QA/QC matters and has effective comunication channels with all plant supervisory and manage-ment personnel. The Plant QA Manager is a member of the Plant Operating Committee (see Chapter 13 of the FSAR) and the Test Working Group (see Chapter 14 of the FSAR) and has sufficient authority and organizational freedom to identify problems; to initiate, recommend, or provide solutions; and to verify imple-mentation of solutions. The Plant QA Manager has the authority and responsibility to stop unsatisfactory work and control further processing, delivery, or installation of nonconforming material. When the unit is operating, the Plant QA Manager may recommend that the unit be shut down, the Plant Manager, i
however, has the final responsibility for the overall evalua-tion of all aspects and implications of shutting down the operating unit. Qualification requirements for this position are described in Appendix I, " Qualification Requirements". The Plant QA Manager is-specifically responsible for:
Review of and concurrence with documents affecting safety, in-a.
cluding changes thereto, to assure that applicable QA require-ments have been identified and specified therein. Documents subject to review and concurrence by QA reviewers include but are not limited to the following:
N FORM: NOS-3 A, REV. 0
WASHINGTON PUBUC POWER SUPPLY SYSTEM l-14 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
t 1.3.3.1.1 (contd.)
(i) administrative procedures which address: operations, main-tenance, technical specifications, in-service inspection and testing, modifications, calibration, testing, fuel handling, and procurement; (ii) nonconformance and corrective action re-ports; (iii) plant originated procurement documents; (iv) plant work orders; and (v) plant modification packages.
b.
Surveillance verification of in-plant activities to assure that they are being conducted in accordance with approved programs, plans, procedures, or instructions.
Included in the scope of this surveillance program are:
(1) control room operations; pre-operational, startup, and operational tests; maintenance, modification, repair, and calibration; personnel training; and refueling activities; (ii) activities associated with satisfy-ing technical specifications and in-service inspection and testing; and (iii) activities associated with the implementa-tion of security, emergency response, fire protection, and radiological protection, programs.
Initiating procedures or instructions necessary for the accom-c.
plishment of plant QA/QC activities.
d.
Performance of required inspections, examinations, and measure-ments asscciated with maintenance, modification, repair, test, radioactive waste shipping, refueling activities, and on-site receipt of purchased items (including nuclear fuel).
FORM: NCS-3A, REV. O
PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM 1-15 OPERATIONAL m.
QUALITY ASSURANCE PROGRAM DESCRIPTION 7
1.3.3.1.1 (contd.)
e.
Participating in plant meetings which involve discussions of daily and projected plant work loads and assuring proper staff-ing (QA/QC) levels during peak period activities (such as main-tenance, refueling, modifications, or In-Service Inspection).
1.3.3.1.2 The Manager, Nuclear Safety Assurance, (located on-site) for each I
nuclear plant reports to the Manager of Operational Assurance Programs and is responsible for:
r Evaluation of plant operations from a nuclear safety a.
perspective.
b.
Evaluation for technical adequacy and clarity of selectcd procedures important to the safe operation of the plant.
Assessment of plant performance regarding conformance to c.
requirements related to safety.
d.
Comparison of the operating experience of the plant and plants of similar design.
Assessment of plant nuclear safety programs.
e.
1.3.3.2 The Manager, Construction Ouality Assurance, reports to the Direc-tor of Licensing & Assurance and is primarily responsible for pro-curement QA, major plant modifications QA, and non-destructive examination (NDE) certification functions during initial testing and subsequent operations phase activities of Supply System nuclear power plants. Some of the specific responsibilities of the Manager of Construction Quality Assurance are:
FORM: NCli-3 A, REV. 0
1 1
PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM 1-16 OPERATIONAL m.
QUALITY ASSURANCE PROGRAM DESCRIPTION 7
1.3.3.2 (contd.)
Qualification / certification of Supply System inspection and a.
test personnel, as required, and non-destructive examination d
personnel.
b.
Quality assurance functions associated with major plant modifi-cations that are comparable to activities occurring during the initial construction phase.
Vendor qualification, review and concurrence with vendor fur-c.
nished programs and procedures, source verifications (e.g.,
surveillances, inspections, and audits at vendor facilities),
and receiving inspection of vendor furnished items received at the corporate warehouses.
d.
Reviewing and concurring with off-site originated procurement documents to assure conformance to the QA Program requirements.
Acquisition and maintenance of ASME Certificates of Authoriza-e.
tion and/or Owners Certificates.
f.
Ensuring that a written agreement with an Authorized Inspection Agency is obtained to provide for Authorized Nuclear In-Service Inspection Services.
The Manager of Construction Quality Assurance accomplishes this role through the Manager of Procurement Quality Assurance and staff engineers.
FORM: NCS-3A, REV. O
PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM 1-17 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
1.3.3.2.1 The Manager, Procurement Quality Assurance, reports to the Manager of Construction Quality Assurance and is primarily responsible for the definition and implementation of source surveillance / audit pro-gram for verification of activities performed by the Supply System vendors (including the Nuclear Steam Supply System vendors). The Manager of Procurement Quality Assurance is specifically respon-sible for:
Review of and concurrence with procurement documents for items a.
and servic'es (other than nucle'ar fuel) initiated by corporate personnel.
b.
Establishment and maintenance of evaluated vendors list.
c.
Planning, coordination, and performance of source surveil-lances, source inspections, and source audits to verify implementation of vendors' QA/QC programs.
d.
Review and approval of vendor furnished QA/QC procedures and programs.
e.
Receiving inspection of vendor furnished items received at the corporate warehouses.
1.3.3.3 The Manaoer, Audits, reports to the Director of Licensing & Assur-ance and is responsible for maintaining an organization of qualified auditors responsible for verifying implementation of the QA Program as follows:
Performing QA audits of Supply System organizations and exter-a.
nal organizations (e.g., the Architect Engineers and the Con-struction Management).
FORM: NCS-3 A, REV. 0
TO REPLY BY MMLGRAM, SEE REVERSE SIDE FOR WESTEF'. L'N'ON'S TCLL FR E E F "C'.E NU?/EE PS PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM l-18 OPERATIONAL m.
QUALITY ASSURANCE PROGRAM DESCRIPTION 7
1.3.3.3 (contd.)
b.
Developing audit schedules and selecting qualified personnel to perform the activities of this function.
A c.
Cortification of Audit Team Leaders.
d.
Training of audit personnel.
Forwarding of audit reports to the Chairman of the Corporate e.
Nuclear Safety Review Board, the Director of Operations, and management positions responsible for the areas audited, for their review, assessment, and/or correction of identified deficiencies.
f.
Maintenance of audit records.
1.3.3.4 The Manager, Nuclear Safety & Regulatory Programs, reports to the Director of Licensing & Assurance and is responsible for:
Development and maintenance of the Supply System Functional a.
Manual for Nuclear Operation.
b.
Assuring that off-site safety-affecting Supply System proce-dures are clear and adequate from technical and quality assur-ance aspects.
Establishment and maintenance of Supply System / regulatory c.
interfaces and assuring that nuclear licensing transmittals receive an adequate, competent and timely review prior to making commitments.
FORM: NCS-3A, REV. O
PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM 1-19 OPERATIONAL m.
QUALITY ASSURANCE PROGRAM DESCRIPTION 7
1.3.3.4 (contd.)
To accomplish this role, the Manager of Nuclear Safety &
P,egulatory Programs operates through the Manager of Programs &
Safety Performance and the Manager of Regulatory Programs.
1.3.3.4.1 The Manager, Programs & Safety Performance, reports to the Manager of Nuclear Safety & Regulatory Programs and is responsible for:
Establishment, maintenance, add control of the Supply System a.
Functional Manual for Nuclear Operation, b.
Maintenance and control of corporate QA procedures and/or instructions.
Review of and concurrence with procedures and/or instructions, c.
including changes thereto, of off-site Supply System organiza-tions to assure that they address appl
- cable QA requirements, prior to approval for release, d.
Review of procedures and/or instructions, including changes thereto, of off-site Supply System organizations to assure that they are clear and technically acceptable.
Periodically analysing reports of non-conformances (such as e.
non-conformance reports, audit reports, surveillance reports, NRC inspection reports, reportable occurrence reports, etc.) to identify quality trends, if any, and reporting significant results to appropriate management for their review and assessment.
FORM: NCS-3A, REV. 0
TO REPLY BY MAILGRAM MESSAGE. SEE REVERSE SCE FOR WESTERN UNION'S TOLL - FREE PHONE NUMBERS PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM 1-20 OPERATIONAL m.
QUALITY ASSURANCE PROGRAM DESCRIPTION 7
1.3.3.4.1 (contd.)
f.
Providing technical expertise, where necessary, to support the performance of independent review and audit activities.
g.
Assessment of on-site nuclear safety programs to assure that they are adequate, that they are being effectively implemented, and that identified corrective action recomendations are being satisf actorily resolved by the cognizant management.
1.3.3.4.2 The Manager, Regulatory Programs, reports to the Manager of Nuclear Safety & Regulatory Programs and is responsible for:
Acquisition and maintenance of operating licenses of Supply a.
System nuclear power plants.
b.
Establishment' and maintenance of interfaces between the Supply System and federal and statt agencies (such as the Nuclear Regulatory Comission and the Energy Facility Site Evaluation Council).
Defining and implementing programs which assure that licensing c.
submittals receive an adequate technical review from cognizant Supply System, NSSS, and AE personnel prior to transmittal.
d.
Tracking licensing comitments and taking action necessary to assure that they are being met in a timely manner.
Maintaining awareness of changing licensing requirements.
e.
FCRM: NCS-3A, REV. 0
l PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM l-21 OPERATIONAL
..v.
QUALITY ASSURANCE PROGRAM DESCRIPTION 7
1.3.3.4.2 (contd.)
j f.
Providing coordinated development of responses to and coments to new laws, regulations, regulatory guides, and other regula-tory issuances.
1.3.4 The Director, SuDoort Services, reports to the Managing Director and is responsible for the development and implementation of poli-l cies and programs which support operation of Supply System nuclear power plant in the areas.of radiol'agical protection, safeguards and physical security, industrial safety and fire protection, emergency preparedness and administration. To accomplish this role, the Director of Support Services operates through the Manager of Health
& Safety Programs, the Manager of Administration and the Manager of Security Programs.
1.3.4.1 The Manager, Health & Safety Programs, reports to the Director of Support Services and is responsible for the development and coor-dination of Supply System programs for industrial safety and hy-giene, health physics, fire. protection, medical, and emergency preparedness. The Manager of Health & Safety Programs is speci-fically responsible for providing:
Assistance to appropriate management in the implementation of a.
their responsibilities for an effective program of cersonnel safety and loss prevention.
b.
Technical assistance and support services in the areas of health physics, radio-chemistry, and emergency preparedness.
Dose assessment, dosimetry and bio-assay function.
c.
FORM: NCS-3A, REV. 0
PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM 1-22 OPERATIONAL m.
QUALITY ASSURANCE PROGRAM DESCRIPTION 7
1.3.4.1 (contd.)
d.
Maintaining a radiation exposure program which meets the intent of as low as reasonably achievable (ALARA).
e.
On-site meteorological services.
f.
Development and maintenance of emergency preparedness plans and providing related training.
g.
Fire brigade, radiological, and plant chemistry training.
1.3.4.2 The Manager, Administration, reports to the Director of Support Services and is responsible for providing support services in the areas of records and corporate policies and procedures.
1.3.4.3 The Manager, Security Programs, reports to the Director of Support Services and is responsible for overall Supply System security activities. The Manager of Security Programs is specifically responsible for:
Administration of a security program which includes pre-employ-a.
ment screening, physical security surveys, and investigations and loss prevention, b.
Management of security force during the operational phase by assuring that physical security is consistent with needs and is maintained within individual plant safeguards security plans.
Providing training, administrative, and technical assistanct to c.
Plant Managers in the area of plant security.
FORM: NCS-3A, REV. O
I PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM 1-23 OPERATIONAL m.
QUALITY ASSURANCE PROGRAM DESCRIPTION 7
1.3.5 The Chief Financial Officer reports to the Managing Director and is
(
responsible for providing procurement and storage control services that are required to support operation and maintenance of Supply System nuclear power plants. To accomplish this role, the Chief Financial Officer operates through the Manager of Corporate Contracts & Materials Management.
1.3.5.1 The Manaaer, Corporate Contracts & Materials Manaaement, reports to the Chief Financial Officer and is responsible for:
Development of corporate level procurement policies and a.
procedures.
b.
Procurement of items and services in response to approved purchase requisitions.
Coding, cataloging, handling, storage, shipping, and disposal c.
of procured items.
FORM: NCS 3A, REV. O
PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM OPERATIONAL m
QUALITY ASSURANCE PROGRAM DESCRIPTION 7
FIGURE 1-1 s
MANAGING DIRECTOR DEPUTY MANAGING DIRECTOR 1
l l
l l
l
'$SUR A
C OPERATONS ERV S FINA C@L DI ECTOR DIRECTOR DIRECTOR OFFICER L
.L L
SEE FIGURE 1-4 SEE FIGURE 1-5 SEE FIGURE 16 POWER WNP-1 WNP2 WNP-3 GENERATON TECHNOLOGY PROGMM PROGRAM PROGRAM DIRECTOR DIRECTOR DIRECTOR DIRECTOR DIRECTOR 1
I L
SEE FIGURE 12 SEE FIGURE 13 SUPPLY SYSTEM ORGANIZATION RELATIVE TO OPERATIONAL QA FORM: NOS-3A, REV. O mm ia
PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
FIGURE 1-2 i
POWER GENERATION
)
DIRECTOR GENERATON SERVCES &
TRAINING MANAGER OFF-SITE ON-SITE
/
(
TEST &
PLANT MANAGER Pt. ANT MANAGER PLANT MANAGER MAN ER ASSISTANT ASSISTANT ASSISTANT PLANT MANAGER PLANT MANAGER PLANT MANAGER u
u TRAINING
- ADMINISTRATNE MANAGER MANAGER MAINTENANCE CPERATONS TECHNICAL CHEM STRY MANAGER MANAGER MANAGER MANAGER POWER GENERATION ORGANIZATION FORM: NOS-3A, REV. O s m n-u
PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM 25 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
FIGURE 1-3 TECHNOLOGY DIRECTOR SYSTEMS GENERATION
-2 M ant FUELS &
ENGINEERING ENGINEERING ENGINEERING ENVIRONMENT
/
ASST. DIRECTOR ASST. DIRECTOR ASST DIRECTOR ASST. DIRECTOR TECHNOLOGY ORGANIZATION FORM: NOS-3 A, REV. O amm.s4 1
PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM 27 OPERATIONAL
,, m QUALITY ASSURANCE PROGRAM DESCRIPTION 7
FIGURE 1-4
\\
LICENSING &
ASSURANCE DIRECTOR CONSTRUCTON OPERATONAL NUCLEAR SAFETY &
AUDITS QUAUTY ASSURANCE REGULATORY MANAGER ASSURANCE PROGRAMS PROGRAMS MANAGER MANAGER MANAGER I
l PLANT PROGRAMS &
REGULATORY PROCUREMENT MODIFICATONS SAFETY PROGRAMS CA MANAGER QA STAFF PERFORMANCE MANAGER MANAGER OFF-SITE m._
ON SITE 1
1 4
- : WNP-2 NuC. Safety
^"
QA MANAGER AGER LICENSING & ASSURANCE ORGANIZATION FORM: NOS-3A, REV. O er22rra
PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM 28 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
FIGURE 1-5 SUPPORT SERVICES DIRECTOR P
S ADMINISTRATION MANAGER MANAGER MANAGER SUPPORT SERVICES ORGANIZATION FORM: NOS-3 A, REV. O s22:27-sa
WASHINGTON PUBLIC POWER SUPPLY SYSTEM OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
FIGURE 1-6 CHIEF FINANCIAL OFFICER CORPORATE CONTRACTS
& MATEHIALS MGMT.
MANAGER FINANCE PROGRAMS FORM: NOS-3A, REY. O azame
PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM 2-1 OPERATIONAL m.
QUALITY ASSURANCE PROGRAM DESCRIPTION 7
2 - QUALITY ASSURANCE PROGRAM 2.1 PURPOSE This section provides an overall description of the QA Program that will be applied to initial testing and subsequent operation and maintenance activities throughout the life of Supply System nuclear power plants.
2.2 GENERAL 2.2.1 The QA Program will be implemented through a series of Nuclear Operation Standards (N0Ss) contained in the Supply System Functional Manual for Nuclear Operation. These NOSs, in turn, will be imple-
'(
mented by Supply System organizational procedures, programs or plans which prescribe detailed methods for functional accomplishment. The NOSs will address the applicable requirements of Appendix B to 10CFR50 and Sections 1 through 18 of the QA Program. A matrix of Nuclear Operation Standards cross referenced against each criteria of Appendix 8 to 10CFR50 is included in Table 2-1.
Thu NOSs and implementing procedures, programs or plans will collectively comply with the Regulatory Positions of QA-related Regulatory Guides as identified and modified in Appendix II, " Position Statements".
2.2.2 A list of safety-related items that will be subject to the appli-cable controls of the QA Program is included in the Final Safety Analysis Report (FSAR) for the applicable Supply System nuclear power plant. Changes to this listing shall be controlled by the Director of Technology and approved by the Plant Manager.
FORM: NCS-3A, REV,0
1 PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM 2-2 OPERATIONAL m.
QUALITY ASSURANCE PROGRAM DESCRIPTION 7
2.2.3 Applicable provisions of the QA Program shall be implemented by the earliest of the following and shall remain in effect for the life of Supply System nuclear power plants:
Prior to inception of the activity.
a.
b.
At the time of temporary / permanent transfer of system / component custody to Test and Startup Organization.
Ninety (90) days prior to init al fuel loading.
c.
2.2.4 Revisions to the QA Program will be made by the Licensing & Assurance organization as follows:
Proposed changes to the QA Program will be evaluated to deter-a.
mine whether or not they would result in a reduction of comit-ments previously accepted by the Nuclear Regulatory Comission (NRC).
b.
Changes that do not reduce the comitments may be implemented prior to forwarding of such changes to the NRC. However, all such changes shall be forwarded to the NRC at least annually.
Changes that do reduce comitments will be forwarded to the NRC c.
for their review and acceptance prior to implementation. Such changes shall be regarded as accepted by the NRC upon receipt of a letter from the NRC to this effect or sixty (60) days after submittal to the NRC, whichever occurs first.
FORM: NCS 3A, REV. O
PAGS WASHINGTON PUBLIC POWER SUPPLY SYSTEM 2-3 OPERATIONAL m.
QUALITY ASSURANCE PROGRAM DESCRIPTION 7
1 2.2.5 Managers of Supply System organizations responsible for implementing the applicable provisions of the QA Program shall assure that activ-ities that affect safety-related functions of plant items are per-formed by personnel who have been indoctrinated and trained. The scope, objective, and method of implementing the indoctrination and training program shall be documented. Proficiency of personnel j
performing activities that affect safety-related functions of plant items shall be maintained by retraining, re-examination, and/or recertifying, as applicab,le. Methods shall be provided for docu-menting training.
2.2.6 The scope, implementation, and effectiveness of the QA Program is routinely audited by the Licensing & Assurance Organization. Copies of audit reports are presented to Supply System management to pro-vide for assessment of the effectiveness of the QA Program.
Additionally, on an annual basis, the Supply System management arranges for an independent audit and evaluation of the adequacy of the scope, implementation, and effectiveness of the QA Program.
This is accomplished by knowledgeable personnel cutside of Licensing
& Assurance Organization to ' assure achievement of an objective pro-gram assessment. Results of these independent audits are reported to the Managing Director / Deputy Managing Director.
1 l
l FCRM: NCS 3A, REV. O
WASHINGTON PUBLIC POWER SUPPLY SYSTEM PAGE 2-4 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
TABLE 2-1 OPERATIONAL QA PROGRAM DESCRIPTION IMPLEMENTING NUCLEAR OPERATION STANDARDS Nuclear Operation Standards 10CFR50 Appendix B Criterion l
Number Title 1
2 3 4 Si 6 7l 89l10l11 1213l14l15l16l17 NOS-1 Organization Responsibilities / X Charters NOS-2 Control of the Functional X X l
Manual for Nuclear Operation, N05-3 Operational QA Program X
X X
Description Control N05-5 Personnel Training, X
Qualification & Certification NOS-6 Review Comittees X
NOS-9 Procedures / Instructions X
X Control l
NOS-Il Coriduct of Licensing X
Activities N05-18 Operational Surveillance X
X Program N05-19 Operational Quality Control l
X Inspection Program N05-20 Audits X
N05-22 Q-List Control X
X NOS-23 Plant Modification Control X
,N05-24 Document Control X
j NOS-26 Records Control X
N05-27 Procurement and Storage X
X X
Control N05-28 Equipment Control X
i X
X X
e I
!l I
l i
FORM: NOS-3A, REV. 0 m,
WASHINGTON PUBLIC POWER SUPPLY SYSTEM 2-5 OPERATIONAL u,.
QUALITY ASSURANCE PROGRAM DESCRIPTION 7
TABLE 2-1 OPERATIONAL QA PROGRAM DESCRIPTION IMPLEMENTING NUCLEAR OPERATION STANDARDS Nuclear Operation Standards 10CFR50 Appendix B Criterion l
3,456{7h891011l12{1314{l5l16l17l18l Number Title 1
2 NOS-29 Test Control X
I l
N05-30 Control of Nonconformances X
X and Corrective Action
,1 NOS-31 Calibration Control X
NOS-32 Maintenance Control X
X NOS-33 Control of ISI Programs X
X X
X l
l l
l l
l i
t I
j i
lI
}
t i
I I
l i
i
)
i i
I
{
l 1 !
l I
FORM: NOS-3A, REV. 0
~r,m-rcw r-
WASHINGTON FUBLIC FOWER SUFFLY SYSTEM OPERATIONAL PAGE QUALITY ASSURANCE PROGRAM DESCRIPTION 3-1 3 - DESIGN CONTROL Y
3.1 PURPOSE This section sets forth requirements for the control of new designs, changes thereto, and plant modifications that affect safety-related functions of structures, systems, and components.
3.2 GENERAL 3.2.1 Organizations (both internal and external) participating in the pre-paration, review, approval, and verification of design documents (drawings, design input and criteria, specifications, design analy-sis, computer programs, system descriptions, procedures, and instruc-tions-) associated with new designs, changes thereto, and plant modi-fications shall develop and implement procedures that clearly de-lineate actions to be accomplished. These procedures shall contain provisions to assure that:
a.
Applicable regulatory requirements and design bases specified in the Final Safety Analysis Report are correctly translated into design documents.
b.
Appropriate quality standards are specified and included in de-sign documents and that changes from such standards are docu-mented, approved, and controlled.
c.
Design analysis (reactor physics, stress, thermal, hydraulic, accident, etc.) is performed, where applicable.
8 WP 115 C3
WMHINGTON PUBIJC FOWEP. SUFFLY SYSTEL*
"*** 5 OPERATIONAL PAGE QUALITY ASSURANCE PROGRAM DESCRIPTION 3-2 3.2.1 (cont'd.)
d.
Items such as compatibility of materials, parts, components, and processes selected; accessibility for inservice inspection, maintenance, and repair; and delineation of acceptance criteria for inspections and tests are considered, where applicable, dur-ing the design development and review phases.
e.
Errors and deficiencies discovered in approved design documents that could adversely affect safety-related structures, systems, and components are docunented and that appropriate corrective action is taken.
f.
Development, maintenance and use of computer code programs is controlled. Where the use of a particular computer code for performing design calculations is specified, such computer code is verified and certified for use.
3.2.2 Where two or more design organizations are involved in the perform-ance of design, necessary interface controls (both internal and ex-ternal) shall be documented and controlled between the participating organizations, particularly in the area of review, approval, release, distribution and revision of interface documents.
i l
3.2.3 Design verification, to provide assurance that the design meets the i
specified design inputs, shall be performed by utilizing methods such as design reviews, alternate calculations, or qualification testing.
3.2.4 Design verification procedures shall be established and implemented.
These procedures shall:
a.
Provide for the determination of the method for design verifica-tion that will be utilized.
W>ttS R3
WASHINGTON PUBLIC POWEI' S-UPPLY SYSTEI".
5 OPERATIONAL PAGE QUALITY ASSURANCE PROGRA31 DESCRIPTION 3-3 3.2.4 (cont'd.)
b.
Provide assurance that the design verification is performed and documented by personnel other than those who performed the ori-ginal design, but who may be from the same organization.
c.
Identify the responsibilities of the verifier; areas, features, l
and pertinent considerations to be verified; and the documenta-tion to be generated.
d.
Require that where verification method is only by test, the pro-totype, component, or feature testing is performed at the earli-est practicable stage.
e.
Require the accomplishment of design verification, in all cases, prior to relying upon the item to perform its safety function.
3.2.5 Design documents shall be reviewed for adequacy by the originating organization unless delegated to another qualified organization.
Such reviews shall be documented and maintained on file.
3.2.6 Changes to approved design documents shall be subjected to design control measures comparable with those that were applied to the ori-ginal design and shall be approved by the same organization that ap-proved the original design, unless delegated to another qualified organization.
3.2.7 Measures shall be established to assure that plant personnel and other affected organizations are made aware of design changes /-
modifications that affect the performance of their duties.
Whits E3 i~
~
Z ~
~~~
~
.' Z.'"'.'
.-~.
WASHINGTON PUBLIC POWEP. SUFFLY SYSTEI.:
5 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION Il l
l l
l l
4 - PROCUREMENT DOCUMENT CONTROL k
l 4.1 PURPOSE l
This section sets forth requirements for preparation, review, and approval of procurement documents and changes thereto in order to control the quality of vendor furnished safety-related plant items and services.
4.2 GENERAL 4.2.1 Procedures / instructions shall be established and implemented to con-trol procurement-related activities such as procurement planning; preparation, review, approval and control of procurement documents; vendor selection; bid evaluations; and review and concurrence of ven-dors' quality assurance prograns. These procedures / instructions shall clearly delineate the sequence of actions to be accomplished in the preparation, review, and approval of procurement-related docu-ments and shall identify those positions or groups responsible for performing those actions.
4.2.2 Procurement documents for items (other than commercial grade off-l the-shelf items, as defined in 10CFR21) and for services shall re-quire, where necessary, vendors or subvendors to provide a quality assurance program consistent with the applicable provisions of the QA Program.
4.2.3 As deemed necessary, the procurement documents will provide for right of access to the vendor's facilities and records for source inspection / audit by Supply System or its designee.
WW115 C3
WASHINGTON PUBLIC FOWEP. SUFFLY SYSTEL:
"'V-5 OPERATIONAL
'^
QUALITY ASSURANCE PROGRAM DESCRIM' ION 4-2 4.2.4 Procurement documents shall contain or reference applicable technical requirements (such as regulations, specifications, drawings, codes, and standards), test and inspection requirements, and special process instructions that must be complied with by vendors.
4.2.5 Procurement documents shall contain, as applicable, requirements which identify the documentation (such as drawings, specification, inspection and test records, personnel and procedure qualifications, Certificates of Conformance or equivalent certifications, and mater-ial chemical and physical test results) to be prepared, maintained, submitted, or made available to Supply System for review and/or ap-preval.
4.2.6 Procurement documents shall be reviewed by QA personnel.
This review will be perfonned and documented to assure that quality requirements are correctly stated, that they can be inspected and controlled, and the procurement documents have been prepared to incorporate appro-priate provisions of 4.2.2 through 4.2.5.
4.2.7 Changes (other than those that are of administrative nature) to ap-proved procurement documents shall be subjected to the same degree of control that was applied during the preparation of original procure-ment documents.
e Wells R3
^"**
WASHINGTON PUBLIC POUER SUPPLY SYSTEI."
5 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION Y-Y 5 - INSTRUCTIONS, PROCEDURES, AND ORAWINGS 5.1 PURPOSE This section sets forth requirements for instructions, procedures, and drawings for activities that affect safety-related functions of j
plant items.
5.2 GENERAL l
l 5.2.1 Activities that affect safety-related functions of plant items shall be described by and accomplished through implementation of documented procedures, instructions, or drawings, as appropriate.
5.2.2 Procedures / instructions shall be established to assure that procedures, instructions or drawings include appropriate quantitative (such as dimensions, tolerances, and operating limits) or qualitative (such as comparative workmanship samples) acceptance criteria for determining satisfactory work performance and quality compliance.
WPill R3 n_
PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEAt 6-1 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
6 - DOCUMENT CONTROL 6.1 PURPOSE This section sets forth requirements for the control of documents pertaining to activitici-that affect safety-related functions of plant items.
6.2 GENERAL 6.2.1 Procedures shall be established and implemented to control the prepa-ration, review, approval and issuance of documents, including changes thereto, which pertain to activities affecting safety-related func-tions of plant items. As a minimum, the following types of documents shall be controlled:
a.
Operational QA Program Description.
b.
Supply System Functional Manual for Nuclear Operation.
Design documents (e.g., calculations, drawings, specifications, c.
analyses) including documents related to computer codes.
d.
As-built documents.
e.
Final Safety Analysis Reports.
f.
FORM: NCS-3A, REV. 0
PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM 6-2 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
6.2.1 (contd.)
Administrative procedures which address operations, maintenance, g.
technical specifications, inservice inspection and testing, mod-ification, calibration, testing, fuel handling and procurement.
h.
Nonconformance reports.
6.2.2 Procedures that control the preparation, review, approval and issuance of documents, including changes thereto, shall contain provisions sich provide assurance that:
Type documents listed in paragraphs 6.2.1.c through 6.2.1.h are a.
reviewed for technical adequacy, by qualified individuals, prior to approval for release.
b.
Type documents listed in paragraphs 6.2.1.e through 6.2.1.h are reviewed for inclusion of appropriate quality requirements and concurred with by qualified Quality Assurance personnel, prior to approval for release'.
Note: Review aad concurrence requirements by QA personnel will be considered met either by QA participation in the Plant Operating Comittee or the Test Working Group, 'as applicable, or by providing dated signatures on the documents reviewed or on documents traceable to the documents reviewed.-
Documents are approved for release by authorized personnel prior c.
to implementation.
FORM: NCE 3A, REV. 0
WASHINGTON PUBLIC POWER SUPPLY SYSTEM 6-3 OPERATIONAL m.
QUALITY ASSURANCE PROGRAM DESCRIPTION 7
6.2.2 (contd.)
d.
Documents are available at the location where the prescribed activity will be performed prior to commencing the work.
I Changes (other than those that are of administrative nature) to l
e.
approved documents are reviewed and approved by the same organizations that performed the original review and approval unless delegated to other appropriately qualified organizations.
f.
Approved changes to documents are promptly incorporated into l
instructions, procedures, drawings and other appropriate documents.
g.
Obsolete or superseded documents are controlled to prevent their l
inadvertent use.
6.2.3 Current revision status of documents, such as instructions, pro-l cedures, drawings, and specifications shall be identified and main-tained.
FORM: NCS-3A, REV. O
"*V" WAS!!INGTON PUBLIC POWEP. SUPPLY SYSTEI4 OPEllATIONAI.
PAGE QUAL.lTY ASSUllANCE PitOGilAM DESCitIITION 7-1 l
7 - CONTROL OF PURCHASED MATERIAL, EQUIPMENT, AND SERVICES I
7.1 PURPOSE inis section establisnes controls to assure tnat safety-related items and services, whether purchased directly or througn contractors and subcontractors, conform to procurement documents.
7.2 GENERAL 7.2.1 Procedures / instructions snall be estaolisned and implemented for the control of purchased materials, equipment, and services.
These procedures / instructions snall clearly descrioe tne actions to be ac-complished and identify those positions or groups responsible for performing those actions.
7.2.2 Material, equipment, services and spare / replacement parts (other tnan commercial grade /off-the-shelf items as defined in 10CFR21) for safety-related structures, systems and components:
a.
Shall be procured from vendors whose quality assurance qualifi-cations nave been affirmed, either prior to or after award of the contract, by the corporate Quality Assurance, and b.
Shall be subject to the quality assurance program controls and to tecnnical requirements at least equal to the original techni-cal requirements or to revised controls that have been properly reviewed and approved.
7.2.3 Evaluation of vendors, including review and concurrence of vendors' QA programs, shall be performed by QA personnel competent in deter-mining the ability of vendors to provide acceptable quality prod-ucts.
Source selection will be based on one or more of the following:
WP115 R3
DASHINGTON PUBLIC POWER SUFFLY SYSTE11
" "V*
OPERATIONAL 6
QUALITY ASSURANCE PROGRAM DESCRIPTION 7-2 7.2.3 (cont'd) a.
The ability of the vendor to comply with those elements of 10CFR50 Appendix B applicable to the type of material, equip-ment, or services being procured.
b.
A review of previous record and performance of vendors who have provided similar articles of the type being procured, c.
A survey of the vendor facilities and QA program to determine his capability to supply a product which meets design, manufacturing, and quality requirements.
7.2.4 Source verification (vendor surveillance, inspection and audit) shall be comensurate with the relative importance, complexity, and quantity of the items or service procured and the vendor's quality perfonnance.
In-process and final surveillance requirements of vendor products shall be determined in advance and performed to as-sure confonnance with procurement document requirements. Source verification is' not required where the quality of an item can be verified by review of test reports, inspection upon receipt, or other means.
l l
7.2.5 Receiving inspection of vendor-furnished items shall be performed to assure that:
a.
The item is pnperly identified and corresponds to the identi-fication on the procurement document and receiving documentation.
l WWl15 R3
" "V
- WASHINGTON PUBLIC FOWER SUFFLY SYSTEM l
OPERATIONAL 6
PAGE QUALITY ASSURANCE PROGRAM DESCRIPTION 7-3 7.2.5 (Cont'd) b.
The item and the acceptance records satisfy the inspection in-struction prior to relying upon the item to perform its safety function.
c.
Specified inspection, test, and other records are complete and available at the site prior to relying upon the item to perform its safety function, d.
Inspection status of accepted items is identified prior to their being released for storago, use or further work.
7.2.6 Documentary evidence that vendor-furnished items conform to procurement requirements shall be retained at the site for the life of the items.
7.2.7 The validity of vendor-furnished Certificates Of Conformance (or equivalent certifications) shall be evaluated by either audits /
surveillances 5f the vendor or independent inspection or test of the items.
Such evaluations shall be performed at intervals commen-surate with the vendor's past quality performance.
WP1D C3
B
~ " *
- WASHINGTON PUBLIC FOUEI1 SUPPLY SYSTEl."
5 OPEllATIONAL PAGE QUALITY ASSURANCE PROGRAM DESCitIPTION 8-1 8 - IDENTIFICATION AND CONTROL OF MATERIALS, PARTS, AND COMPONENTS 8.1 PURPOSE This section sets forth requirements for identification and control of safety-related materials, parts, and components.
8.2 GENERAL Procedures and/or instructions shall be established and implemented for the identification and control of items so as to prevent use of incorrect or defective items.
These procedures and/or instructions l
shall assure that:
a.
Identification requirements for items are established during initial planning (i.e. during generation of specifications and design drawings).
b.
Identification of the item is maintained by heat number, part number, serial number or other appropriate means.
c.
Identification of the item is maintained either on the item or on records traceable to the item.
d.
The traceability of the item to appropriate documentation, such as specific inspection / test records, code data reports, and physical / chemical mill test reports, is maintained when such traceability is required by codes, standards or specifications.
~
e.
Identification of the item is maintained throughout fabrication, shipping, installation.and use of the item.
WP 115 R3
""V' WAS'IINGTON PUBUC POWER SUPPLY SYSTEI."
OPMilATION AI.
PAGE QUAL.1TY ASSUllANCE PitOGilAM DESCittlTION 8-2 8.2 (Cont'd.)
f.
The location and metnod (sucn as application of metal tags or markings) of identification do not affect the safety-related function of the iten.
g.
Correct identification of the item is verified prior to release of tne item for fabrication, snipping, assemoling and installation.
W>t15 R3
n.
WASHINGTON PUBLIC POWER SUPPLY SYSTEM g_1 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
9 - CONTROL OF SPECIAL PROCESSES 9.1 PURPOSE This section sets forth requirements for special process activities which affect safety-related structures, systems, and components.
9.2 GENERAL 9.2.1 Special processes are those that require interim in-process controls in addition to final inspection and/or examination to assure achieve-ment of requ '. ed quality.
9.2.2 Procedures / instructions shall be established and implemented to as-sure adequate perfonnance and control of special processes such as welding, heat treating, non-destructive testing, and chemical clean-ing. These procedures / instructions shall contain provisions for:
Qualifying the personnel, equipment, and procedures to be uti-a.
lized for performing special processes.
b.
Documenting the evidence (inspection or process results) of ac-ceptable performance of special processes.
~
9.2.3 Special processes shall be performed by qualified personnel utilizing qualified procedures and qualified equipment in accordance with ap-plicable codes, standards, and specifications. For special processes not covered by existing codes or standards, the necessary qualifica-tions of personnel, procedures, and equipment shall be defined in appropriate documents.
FORM: NOS 3A, REV. O
WASHINGTON PUBLIC POWER SUPPLY SYSTEM 9-2 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
9.2.4 Procedures, equipment, and personnel to be utilized for the perform-ance of special processes shall be qualified / certified by authorized personnel from applicable organizations (e.g., Licensing & Assurance, Power Generation. Technology,'and Plant organizations, etc.).
9.2.5 Qualification records of procedures, equipment, and personnel associ-ated with special processes shall be established, filed, and main-tained.
s FCRM: NCS-3A, REV. 0
9MM WASHINGTON PUBUC POWER SUPPLY SYSTEM 10-1 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
10 - INSPECTION 10.1 PURPOSE This section sets forth requirements for inspection of activities that affect safety-related functions of plant items.
10.2 GENERAL 10.2.1 Inspections which provide assurance that safety-related plant items and activities conform to applicable specifications, drawings, codes, standards, and regulations, shall be performed and documented in ac-cordance with written and approved procedures, instructions or check lists.
10.2.2 Inspection procedures, instructions or check lists will, as appropri-ate, provide for:
a.
Date inspection performed b.
Description of inspection method Identification of characteristics and activities to be inspected.
c.
d.
Acceptance or rejection criteria Identification of required procedures, drawings and specifica-e.
tions.
f.
Specifying necessary measuring and test equipment including ac-curacy requirements g.
Identity of inspector and/or data recorder.
FORM: NOfL3A, REV. 0
f WASHINGTON PUBLIC POWER SUPPLY SYSTEM 10-2 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
10.2.3 Inspections shall be performed by individuals other than those who performed or directly supervised the activity being inspected.
In-spections, in general, will be performed by or under the supervision of the Supply System Licensing & Assurance organization. However, l
personnel from the perfoming groups (Operations, Maintenance, Tech-nical, Test & Startup, etc.) may be utilized for performing certain inspections associated with normal plant operation. When such is the case, the related work procedures shall require (a) demonstration of correct perfomance of the work through a functional test where the work involves breaching a pressure retaining boundary, and (b) review and concurrence by the Supply System Licensing & Assurance organiza-l tion of qualification criteria of inspection personnel prior to ini-tiation of inspection activity.
10.2.4 Individuals performing inspections shall be qualified and the status of their qualifications shall be maintained current.
10.2.5 Where mandatory inspection holdpoints are identified in pertinent documents, work shall not proceed beyond those holdpoints without the consent of the responsible inspection personnel or group.
l 10.2.6 Inspection results shall be documented, evaluated, and their status recorded.
l FORM: NOS-3A, REV. 0
UASMNGTON FUBLIC FOWER SUFFLY SYSTEM OPERATIONAL PAGE QUALITY ASSURANCE PROGRAM DESCRIPTION 11 - 1 i
11 - TEST CONTROL 11.1 PURPOSE This section sets forth requirements for testing to assure that safety-related plant items will perform satisfactorily in service.
11.2 GENERAL 11.2.'1 Tests required to demonstrate that plant items will perform satisfactorily in service shall be identified, documented, and performed in accordance with written and approved procedures / instructions.
11.2.2 Tests will include, as appropriate, the following:
a.
Prototype qualification tests.
b.
Proof tests prior to installation.
c.
Preoperational and startup tests.
d.
Surveillance tests during plant operation.
e.
Tests associated with plant modification and maintenance activities.
11.2.3 Test procedures / instructions shall incorporate or reference, as appropriate, the following:
a.
Instructions for performing the test.
W>t15 C3
DASMNGTON FUBLIC FOWER SUFFLY SYSTEM 5
OPERATION'AL ha QUALITY ASSURANCE PROGRAM DESCRIPTION 11 - 2 11.2.3 (Cont'd.)
b.
Test prerequisites such as calibrated instruments, adequate test equipment, completeness of the item to be tested, and suitable environmental conditions.
c.
Mandatory inspection hold points.
d.
Acceptance / rejection criteria.
e.
The requirements and acceptance limits contained in the applicable design documents.
f.
Methods of documenting or recording test data and results.
g.
Provisions for assuring that test prerequisites have been met.
11.2.4 Test results shall be documented, evaluated, and their status recorded by a responsible individual or group.
l l
l l
l l
w n na
.n
WASHINGTON PUBLIC POVIER SUPPLY SYSTEL" 5
OPERATIONAL PAGE QUALITY ASSURANCE PROGRAM DESCRIPTION 12 - 1 l
l l
12 - CONTROL OF MEASURI.NG AND TEST EQUIPMENT l
4 l
12.1 PURPOSE
(
This section sets forth the requirements to establish those meas-ures which will assure that tools, gages, instruments, and other measuring and testing devices used in activities affecting quality are controlled, calibrated, and adjusted at specified periods in order to maintain accuracy within necessary limits.
12.2 GENERAL 12.2.1 Measuring and test equipment (M&TE) shall be calibrated and ad-justed using approved procedures / instructions.
12.2.2 A calibration program for the control and use of M&TE shall be es-tablished, and implemented.
This program, as a minimum, shall pro-vide for:
a.
Unique identification of the item and its traceability to the calibration test data.
b.
Labeling or tagging (or otherwise controlling) to indicate the due date of the next calibration.
c.
Calibration technique and frequency.
d.
Generation and maintenance of records which indicate the com-plete listing of all items under the calibration system toget-her with their current calibration status.
e.
Controlled environment conditions for sensitive and close tol-erance M&TE.
W>ttS R3
WASHINGTON PUBLIC POVIEE SUPPLY SYSTEL" 5
OPERATIONAL
'^ "
QUALITY ASSURANCE PROGRAM DESCRIITION l2 - 2 12.2.3 M&TE shall be calibrated against certified calibrating standards having known valid relationships to nationally recognized stand-ards.
If no national standards exist, the basis for calibration will be documented.
12.2.4 Calibrating standards that are used for calibrating M&TE shall have tolerance not greater than one fourth (1/4) the tolerance of M&TE.
Tolerances greater than 1/4 will be acceptable when limited by the state-of-the art. Calibrating standards shall be calibrated against higher level standards.
12.2.5 M&TE shall be calibrated and maintained at specified periods based on the required accuracy, purpose, stability characteristics, and other conditions affecting the measurement.
12.2.6 When an item of M&TE is found to be out of calibration, an evalua-tion shall be made and documented to determine the validity of pre-vious inspection / test results and the disposition in be made of items previously inspected / tested.
Wkt15 R3
~
1 WASHINGTON PUBLIC FOWER SUPPLY SYSTEM
- 5 OPERATIONAL
)
mas QUALITY ASSURANCE PROGRAM DESCRIITION 13 - 1 13-HANDLING,STOPfGE.,ANDSHIPPING 13.1 PURPOSE This section establishes controls for cleaning, handling, storage, packaging, shipping and preservation of safety-related items.
13.2 GENERAL 13.2.1 Cleaning, handling, storage, packaging, shipping and preservation of items shall be accomplished in accordance with written procedures /
instructions, to prevent damage, loss or deterioration by environ-mental conditions.
These procedures / instructions shall be prepared in accordance with the design and procurement requirements of the items.
13.2.2 When necessary for particular iteins, special coverings, special equipment and special protective environments, such as inert gas atmosphere, specific moisture content levels, and temperature levels, shall be specified, provided, and their existence verified.
13.2.3 Responsible personnel shall assure that items are identified, inven-toried, adequately packaged to ensure integrity during transit, properly addressed and released and that these activities are docu-mented.
13.2.4 Measures shall be established and implemented to control the storage of chemicals, reagents (including control of shelf-life), lubricants and other consumable materials for safety-related application.
WPfl5 E3
WASIUNGTON PUBLIC POWER SUPPLY SYSTEM "N*
5 OPERATIONAL PAGE QUALITY ASSURANCE PROGRA31 DESCRIPTION 14 - 1 14 - INSPECTION, TEST AND OPERATING STATUS l
14.1 PURPOSE This section sets forth tM requirements for identifying the inspection, test, and operating status of safety-related items.
14.2 GENERAL Procedures / instructions shall be established and implemented for identifying the inspection, test, and operating status of plant items.
These procedures / instructions shall include provisions for assuring that:
a.
The application and removal of status indicators (stamps, tags, labels, routing cards, physical barriers, etc.) is controlled.
b.
Items which require inspections and tests are identified and controlled to preclude bypassing of such inspections and tests.
c.
The status of inspections and tests performed upon individual plant items is indicated by the use of status indicators or other suitable means.
d.
The operating status of nonconforming, inoperative, or malfunctioning installed plant items is documented and identified to prevent inadvertent operation.
WP115 R3
PW WASHINGTON PUBLIC POWER SUPPLY SYSTEM 15-1 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
15 - NONCONFORMING MATERIALS, PARTS, OR COMPONENTS 15.1 PURPOSE This section sets forth requirements for the control of safety-related items, services, or activities which do not conform to speci-fied requirements.
15.2 GENERAL 15.2.1 Measures shall be established to control nonconforming items to pre-vent their inadvertent use or installation.. These measures shall include, as appropriate, procedures / instructions for identification, review, documentation, segregation, disposition, approval, and noti-fication to affected organizations of nonconforming items.
15.2.2 Measures shall be established and documented defining the responsi-bility and authority for determining and approving the disposition of nonconforming items.
15.2.3 Nonconformances shall be documented. This documentation shall:
a.
Clearly identify the nonconforming item; and b.
Describe the nonconformance, the disposition of nonconformance, and inspection / test requirements (where applicable).
15.2.4 Nonconforming items shall be reviewed and accepted for use-as-is, rejected, repaired, or reworked in accordance with documented procedures / instructions. The Supply System Licensing & Assurance l
shall review nonconformances to assure that dispositions have been evaluated and approved.
FORM: NOS-3A, REV. 0
PW WASHINGTON PUBLIC FOWER SUPPLY SYSTEM 15-2 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
15.2.5 Acceptability of repaired, reworked and replaced item shall be veri-fied and documented by inspecting and/or testing the item in accord-ance with original inspection and/or test requirements or approved i
alternatives.
15.2.6 Where feasible, nonconforming items shall be segregated from other acceptable items and/or uniquely identified as nonconforming until properly dispositioned for use.
15.2.7 Reports of nonconfonnances shall be periodically analyzed by the Supply System Licensing & Assurance organization to identify quality trends. Significant results shall be referred to appropriate man-agement for review and assessment.
T s
FORM: NOS.3A REV. O A
l.
WASIIINGTON PUBLIC FOWER SUFFLY SYSTEI.:
OPERATIONAL 5
W QUALITY ASSURANCE PROGRAM DESCRIPTION 16 - 1 16 - CORRECTIVE ACTION 16.1 PURPOSE This section sets forth the requirements for identification, correction, documentation, and reporting of conditions adverse to quality such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances.
16.2 GENERAL 16.2.1 Conditions adverse to quality shall be evaluated and the need for corrective actions determined in accordance with established procedures. These procedures shall provide for prompt identification and correction of conditions.
16.2.2 For conditions significantly adverse to quality, the corrective l
action procedures shall provide for the following:
a.
Determination of the cause of the condition, b.
Corrective action so as to preclude repetition of the condition.
c.
Verification of the implementation of the corrective action.
16.2.3 Conditions significantly adverse to quality, its cause, and the corrective action taken shall be documented and reported to appropriate levels of management for review and assessment.
4 W>t14 C3
WASHINGTON PUBLIC POWEI'. SUPPLY SYSTEJ 5
OPEltATIONAl.
PAGE QUAL.lTY ASSUllANCE PitOGilAM DESCitlPTION 17 1 17 - QUALITY ASSURANCE RECORDS 17.1 PURPOSE Tnis section sets forth requirements for generation, transmittal, retention, and maintenance of quality assurance records for Supply System's nuclear power plants.
17.2 GENERAL 17.2.1 Sufficient records snall be maintained to furnisn evidence of tne quality of safety-related plant items and activities. As a minimum tnese records snall include the following:
a.
Operating logs b.
Results of design reviews, inspections, tests, audits, and material analysis c.
Monitoring of work performance d.
Qualifications of personnel, procedures, and equipment.
e.
Drawings, specifications, procedures, and procurement documents.
f.
Nonconformance and corrective action reports g.
Records as required by plant technical specifications.
17.2.2 Inspection and test records snall identify the followin,g where applicable:
WPISS R3
" "V
- WAS'-IINGTON PUBLIC POVIER SUPPLY SYSTEL' OPKKATION Al.
QUAL.lTY ASSUllANCE PROGilAM DESCRIITION 17-2 17.2.2 (Cont'd) a.
Inspector and/or data recorder b.
The type of observation c.
The date and results of inspection or test, d.
Acceptability of results.
e.
The action taken to resolve any deficiencies noted.
17.2.3 Quality assurance records shall be generated-(prepared, reviewed, and approved), accumulated, transmitted for incorporation into the records retention system, retained, maintained, and controlled in
~
accordance witn documented procedures and/or instructions.
17.2.4 The quality assurance records shall be organized and filed so that each document is identifiable and retrievaole.
17.2.5 The quality assurance records shall be filed and maintained in facilities tnat provide protection from possible deterioration or damage and shall be controlled to prevent loss.
o Whits R3
WASHINGTON PUBLIC POUEP. SUPPLY SYSTEI."
OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 18-1 18 - AUDITS 18.1 PURPOSE This section sets forth requirements for auditing to verify imple-mentation and determine the effectiveness of the QA Program.
18.2 GENERAL 18.2.1 A comprehensive system of planned and documented audits by the corporate Quality Assurance, shall be carried out to verify compli-ance with applicable aspects of the QA Program. These audits shall consist of both internal audits of Supply System's nuclear power plants and other Supply System organizations and external audits of Supply System vendors performing activities covered by the QA Program.
18.2.2 Audits shall include the objective evaluation of work areas, acti-vities, processes, and items; review of documents and records; and quality-related practices, procedures and instructions to determine the effectiveness of implementation of the QA Program.
18.2.3 Audits shall be scheduled based upon the status and safety impor-tance of the activities.
18.2.4 Audits shall be performed in accordance with written procedures or check lists and conducted by appropriately trained personnel not having direct responsibilities in the areas being audited.
18.2.5 Audit results shall be documented by auditing personnel and re-viewed by manageinent having responsibility in the area audited.
18.2.6 Follow-up action on deficiencies shall be accomplished.
l l
t W>l15 813
PMM WASHINGTON PUBLIC POWER SUPPLY SYSTEM OPERATIONAL
,.v.
QUALITY ASSURANCE PROGRAM DESCRIPTION 7
APPENDIX I QUALIFICATION REQUIREMENTS The minimum qualification requirements for key Licensing & Assurance personnel that will be met at the time of initial core loading or appointment to the active positions are as follows:
I.1 Licensing & Assurance Director a.
Education: Bachelor Degree or equivalent
- in Engineering or related science.
b.
Experience: Ten (10) years experience in the field of quality as-surance, or equivalent number of years of nuclear industry experi-ence in a management position or a combination of the two. At least two (2) years of this ten (10) years experience shall include de-tailed involvenent in the administration of and adherence to the quality assurance program in a significant management role directly involving nuclear power plants.
I.2 Operational Assurance Programs Manacer a.
Education: Bachelor Degree or equivalent
- in Engineering or a re-lated science.
b.
Experience: Six (6) years experience in the field of quality assur-ance, or an equivalent number of years of nuclear plant experience in a supervisory position, preferably at an operating nuclear plant, or a combination of the two. At least two (2) years of this six (6) years experience shall be nuclear power plant experience in the im-plementation of the quality assurance program.
FORM: NOSL3A, REV. 0
PAS WASHINGTON PUBLIC POWER SUPPLY SYSTEM I-2 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
APPENDIX I QUALIFICATION REQUIREMENTS I.3 Plant Quality Assurance Manager I
a.
Education: Bachelor Degree or equivalent
- in Engineering or related science.
b.
Experience: Four (4) years experience in the field of quality as-surance, or an equivalent number of years of nuclear plant experi-ence in a supervisory position, preferrably at an operating nuclear plant, or a combination of the two. At least one (1) year of this four (4) years experience shall be in the implementation of the quality assurance program.
c.
Training: Shall have acquired familiarization and working knowledge of plant systems, facilities, plans, and programs necessary for the performance of assigned functions in a safe and competent manner.
- Equivalency will be determined based upon an evaluation of the following factors:
1.
High school diploma or GED.
2.
Sixty (60) semester hours of related technical education taught at the college level (900 classroom or instructor conducted hours).
3.
Qualified as an NRC senior operator at the assigned plant.
4.
Four (4) years of additional experience in his area of responsibility.
5.
Four (4) years of supe visory or management experience.
6.
Demonstrated ability to comunicate clearly (verbally and in writing).
7.
Certification of academic ability and knowledge by corporate management.
8.
Successful completion of the Engineer-In-Training examination.
9.
Professional Engineer License.
10.
Associated degree in Engineering or a related science.
FORM: NCS 3A, REV. 0
l 9MM WASHINGTON PUBLIC POWER SUPPLY SYSTEM II-1 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
APPENDIX II
" POSITION STATEMENTS" This Appendix identifies those quality-related Regulatory Guides which the Supply System intends to follow during operations phase of its nuclear power plants. However, where the Regulatory Positions stated in these Regulatory Guides could lead to misunderstanding, or where alternate methods and/or solu-tions are implemented for accomplishment of Regulatory Positions, they are also described in this Appendix. The Supply System comitments to comply with applicable Regulatory Guides not addressed in this Appendix are or will be documented in the applicable Final Safety Analysis Report. The Supply System Positions, described in this Appendix, will be incorporated by Supply System organizations in their procedures and/or instr';ctions for applicable activi-ties. This Appendix will be revised, as and when necessary, by the Supply System L.icensing & Assurance Director, in accordance with the provisions of Section 2 of the QA Program.
II.1 REGULATORY GUIDE 1.8, REV.1-R (May 1977)
" Personnel Selection and Training" The Supply System will implement the Regulatory Position of Regula-tory Guide 1.8, Rev. 1-R (May 1977). For details, see Cha g er 13 of the Final Safety Analysis Report for the applicable nuclear power plant.
II.0 REGULATORY GUIDE 1.26, REV. 3 (February 1976)
" Quality Grouo Classifications and Standards for Water, Steam, and Radioactive-Waste-Containing Comoonents of Nuclear Power Plants" The Supoly System will implement the Regulatory Position of Regula-tory Guide 1.26, Rev. 3 (February 1976).
FORM: NOS-3A, REV. O
WASHINGTON PUBLIC POWER SUPPLY SYSTEM II-2 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
II.3 REGULATORY GUIDE 1.29, REV. 3 (September 1978)
" Seismic Design Classification" The Supply "ystem wili implement the Regulatory Position of Regula-
[
tory Guide 1.29, Rev. 3 (September 1978).
II.4 REGULATORY GUIDE 1.30 (Safety Guide 30, August 11. 1972)
" Quality Assurance Requirements for the Installation, Insoection and Testing of Instrumentaticn and Electric Equipment" The Supply System will implement the Regulatory Position of Regula-tory Guide 1.30 (Safety Guide 30, August 11,1972), subject to the l
following:
1.
Regulatory Position C.1 of Regulatory Guide 1.30 (Safety Guide 30, August 11,1972) states that ANSI N45.2.4-1972 should be used in conjunction with ANSI N45.2-1971, " Quality Assurance Program Requirements for Nuclear Power Plants".
It is the Supply System position that ANSI N45.2-1971 is not applicable for operational phase activities of nuclear power plants.
In-stead the Supply System will comply with its Position Statement on Regulatory Guide 1.33.
2.
Section 1.1 of ANSI N45.2.4-1972: This standard will be ap-plied to the installation, inspection and testing of Class 1E instrumentation, electrical systems and/or components for plant modifications comparable in nature and extent to the activities t
normally occurring during the initial plant design and con-struction phase.
FORM: NCS 3A, REV. O
WASHINCTON PUBLIC POWER SUPPLY SYSTEM II-3 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
II.4 (contd.)
3.
Section 3(3) of ANSI N45.2.4-1972: Checking of records is normally cccomplished during periodic surveillances and audits f
of the storage facility. The checking of storage records for each individual item prior to installation is not planned.
4.
Section 5.1.2 of ANSI N45.2.4-1972:
Inspections to verify housekeeping will be done as stated in the Supply System position statement on Regulatory Guide 1.39.
5.
Section 5.2.1 of ANSI N45.2.4-1972: Tests will include those listed as appropriate. The manufacturers' recomendations shall be considered. The test procedure will specify the actual test to be performed.
6.
Section 9 of ANSI N45.2.4-1972: The Supply System position, stated herein, does not address the codes and standards listed and/or referenced in this paragraph. Such position will be developed in the future, if the need arises.
7.
Appendix A " Supplementary Provisions for Multi-Unit Stations" to ANSI N45.2.4-1972 is not considered applicable to Supply System nuclear power plants.
8.
Appendix B " Additional Codes, Standards anc Guides" to ANSI N45.2.4-1972: Refer to Supply System Position on Section 9 of ANSI N45.2.4-1972.
FORM: NOS-3A, REY. O
WASHINGTON PUBUC POWER SUPPLY SYSTEM II-4 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
11.5 REGUI.ATORY GUIDE 1.33, REV. 2 (February 1978)
" Quality Assurance Program Requirements (Operation)"
9 The Supply System will implement the Regulatory Position of Regula-tory Guide 1.33, Rev. 2 (February 1978), subject to the following:
l 1.
Regulatory Position C.2 of Regulatory Guide 1.33, Rev. 2 (February 1978) it lies that the provisions contained in the latest revisions of the Regulatory Guides, listed therein, will be followed. The Supply System will follow its position state-ments on applicable Regulatory Guides as described throughout this Appendix.
2.
Section 5.2.13.4 of ANSI N18.7-1976/ANS-3.2: The third para-graph of this section is revised to read, "Special handling tools and equipment shall be inspected and/or tested, as neces-
~
sary, in accordance with written procedures and at specific times to verify that the tools and equipment are adequately maintained."
3.
Section 5.2.17 of ANSI N18.7-1976/ANS-3.2 states that inspec-tion of operating activities may be conducted by second-line supervisory personnel or by other qualified personnel not assigned first-line supervisory responsibility for conduct of the work. The Supply System position is to allow the plant operations' first-line supervisors to perform inspections of l
surveillance tests, provided that an after-the-fact review of surveillance documentation is performed by the second-line l
supervisor or by other personnel not assigned first-line responsibility for the conduct of the work.
FORM: NOS 3A, REV. 0
PMM WASHINGTON PUBLIC POWER SUPPLY SYSTEM II-5 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
II.5 (contd.)
4.
Sections 5.2.19.1 and 5.2.19.2 of ANSI N18.7-1976/ANS-3.2 describe rules of practice for preoperational and startup test program. The Supply System intends to comply with the provisions of these sections.
In cases, where conflicts exist between these sections and Regulatory Guide 1.68, the Supply System will comply with the implementation of Regulatory Guide 1.68 as described in Chapter 14 " Initial Test Program" of the Final Safety Analysis Report.
II.6 REGULATORY GUIDE 1.37. (March 16,1973)
" Quality Assurance Recuire-ments for Cleanino of Fluid Systems and Associated Comoonents of Water-Cooled Nuclear Power Plants" The Supply System will implement the Regulatory Position of Regula-tory Guide 1.37, (March 16, 1973), subject to the following:
1.
Regulatory Position C.4 of Regulatory Guide 1.37 (March 16, 1973) states, in part, " Chemical compounds that could contri-bute to intergranular cracking or stress-corrosion cracking should not be used with austenitic stainless steel and nickel-base alloys".
In clarification, the Supply System will either follow the chemical composition limits established by its Nuclear Steam Supply System vendor or establish such limits based upon a documented engineering evaluation.
2.
Regulatory Position C.5 of Regulatory Guide 1.37 (March 16, 1973) states, in part, "Specifically, tools which contain materials that could contribute to intergranular cracking or which, because of previous usage, may have become contaminated FORM: NOS-3A REY. O
WASHINGTON PUBUC POWER SUPPLY SYSTEM II-6 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
II.6 (contd.)
with such materials should not be used on surfaces of corrosion-resistant alloys". In clarification, the Supply System will either follow the chemical composition limits established by its Nuclear Steam Supply System (NSSS) vendor, or establish such limits based upon a documented engineering evaluation.
3.
Section 2.1 of ANSI N45.2.1-1973 states, in part, " Planning for cleaning activities shall include a review of the system and cow anent design specifications and drawings.
In clarification of this requirement, a review of system and component design specifications and drawings will be required for only those modifications which change the design of a fluid system.
4.
Section 2.3 of' ANSI Nd5.2.1-1973, last sentence, is revised to read, " Test reports shall include an evaluation of the accept-ability of inspection and test results and provide for iden-tifying the individual who performed the evaluation".
5.
Section 3.1.2.1 of ANSI N45.2.1-1973 states, in part, " Scatter-ed areas of rust are permissible provided the aggregate area of rust does not exceed two square inches in any one square foot area". The Supply ' System considers this two square inch limit as a guide only. Adequate discretion by experienced personnel will be used in all cases.
6.
Section 3.1.2.5 of ANSI N45.2.1-1973 states, in part, "There shall be no evidence of organic contamination in the effluent water or on the filter". The Supply System intends to comply with this requirement. The presence of organic contamination will be determined visually or by feel.
j PORM: NCS 3A, REY. 0
PMN WASHINGTON PUBLIC POWER SUPPLY SYSTEM II-7 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
II.6 (contd.)
l 7.
Se:. tion 4 of ANSI N45.2.1-1973, second sentence, is revised to read, " Inspections, examinations, or tests for cleanliness shall be performed if it is suspected that cleanliness has been affected by transportation to, or storage at the installation site".
8.
Section 7.4 of ANSI N45.2.1-1973 requires checking of cleaning solutions for effectiveness of inhibitors (if used).
In clari-fication of this requirement, the effectiveness of inhibitors (if used) will be determined by documentation in technical literature or manufacturer's or vendor's recomendations.
11.7 REGULATORY GUIDE 1.38, REV. 2 (May 1977) - Quality Assurance Require-ments for Packaging, Shipping, Receiving, Storage and Handling of Items for Water-Cooled Nuclear Power Plants" The Supply System will implement the Regulatory Position of Regula-tory Guide 1,38, Rev. 2 (May 1977), subject to the following:
l 1.
Section 3.2.1 (1) of ANSI N45.2.2-1972: Temperature and humid-ity control considerations for packaging of Level A items are not considered applicable to nuclear fuel assemblies unless recomended othemise by the nuclear fuel manufacturer. The Supply System will abide by the manufacturer's recomendation.
2.
Section 3.5.2 of ANSI N45.2.2-1972, last sentence, is revised to read as, " Tapes used for identification rather than sealing which are not near a welding operation may remain indefinitely (see also Appendix section 3.5.2 for additional requirements)".
FORM: NOS-3A, REV. O
WASHINGTON PUBUC POWER SUPPLY SYSTEM II-8 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
II.7 (contd.)
l 3.
Section 3.7.1 (1) of ANSI N45.2.2-1972: The Supply System may use cleated, sheathed boxes for loads up to 1,000 pounds rather than 500 pounds limit imposed here. This type of box has been tested by the WNP-2 Nuclear Steam Supply System vendor and found safe for loads up to 1,000 counds. Other national stan-dards allow the 1,000 pound designation (see Federal Specifi-cation PPP-8-601).
4.
Section 6.1.2 (1) of ANSI N45.2.2-1972: Temperature and humid-ity controls required for storage of Level A items are not con-sidered applicable for nuclear fuel assemblies unless recom-mended otherwise by the nuclear fuel manufacturer. The Supply System will abide by the manufacturer's recomendation.
5.
Section 6.4.2 of ANSI N45.E.2 gives detailed requirements for care of items in storage. In clarification, the Supply System will either follow manufacturer's reconsnendation or follow its own requirements, established based upon a documented engineer-ing evaluation, concerning maintenance of protective covers, seals, and caps; maintenance of preservatives and inert atmos-phere; energization of instrument racks and space heaters; in-sulation resistance testing; and rotation of shafts for rotat-ing equipment.
6.
Appendix Sections A3.4.1 (4) and A3.4.1 (5) of ANSI N45.2.2-1972: During printing of the standard, a transposition occur-red between the last sentences of these sections. The Supply System will comply with the correct wording which reads as follows:
l FORAS: N08 3A, REY. 0
PM WASHINGTON PUBLIC POWER SUPPLY SYSTEM 11 9 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
II.7 (contd.)
A3.4.1 (4), last sentence: However, preservatives for inacces-sicle inside surfaces of pumps, valves and pipe for systems containing reactor coolant water shall be the water flushable type.
A3.4.1 (5): The name of the preservative used shall be indi-cated to facilitate touch up.
II.8 REGULATORY GUIDE 1.39, REV. 2 (Seotember 1977)
"Housekeeoina Re-quirements for Water-Cooled Nuclear Power Plants" The Supply System will implement the Regulatory Position of Regula-tory Guide 1.39, Rev. 2 (September 1977), subject to the following:
Section 2.1 of ANSI N45.2.3-1973 requires the establishment of cleanness requirements for housekeeping activities on the basis of zone designations. The Supply System considers these zone designa-tions and the requirements associated with each zone as impractical for implementation during the operations phase. Procedures or in-structions for housekeeping activities, which include the applicable requirements outlined in Section 2.1 of ANSI N45.2.3-1973 and which take into account the radiation control considerations, security considerations and cleanness requirements, will be developed on cases by case basis for maintenance and modification work to be performed.
FORM: NOS-3A, REV. O
WASHINGTON PUBUC POWER SUPPLY SYSTEM II-10 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
II.9 REGULATORY GUIDE 1.58, REV.1 (September 1980)
" Qualification of Nuclear Power Plant Inspection. Examination and Testing Personnel" The Supply System will implement the Regulatory Position of Reguia-tory Guide 1.58, Rev. 1 (September 1980), subject to the following:
l 1.
Regulatory Position C.5 of Regulatory Guide 1.58, Rev.1 (Sep-tember 1980) implies that individuals who review and approve inspection, examination, and testing procedures and those who evaluate the adequacy of such procedures to accomplish the inspection, examination, and test objectives, should meet the Level III capability requirements delineated in Table I of ANSI /ASME N45.2.6-1978. Not all Supply System personnel per-forming the t.Wes of cited functions will meet the Level III capability requirements of Table 1 of ANSI /ASME N45.2.6-1978.
However, personnel performing the cited functions will be determined by Supply System management (through evaluation of their education, training, and experience), to be fully quali-fied and competent. The basis for the determination will be documented.
2.
Section 1.2 of ANSI /ASME N45.2.6-1978, fourth paragraph, states that the requirements of this Standard apply to personnel of the owners and their suppliers.
In clarification, the extent of application of the requirements of ANSI /ASME N45.2.6-1978 to Supply System suppliers will depend upon the nature and extent cf materials or services furnished, and as further described in Supply System positions on Section 2.4 and 3 of ANSI /ASME N 45.2.6-1978.
FORM: NCS 3A, REV. 0
PMM WASHINGTON PUBLIC POWER SUPPLY SYSTEM II-11 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
II.9 (contd.)
3.
Section 2.1.2 of ANSI /ASME N45.2.6-1978 implies that personnel performing non-NDE type of inspections, examinations, and test-ing will be formally certified. The Supply System does not plan this formal certification.
Instead, the Supply System will select such personnel to predetermined qualification re-quirements for the specific task based on their education, ex-perience, and training. Formal training records, when used as the basis for qualification, will be maintained on file.
4.
Section 2.4 of ANSI /ASME N45.2.6-1978 requires issuance of formal certification to individuals and specifies the details of the information to be included in the certificate. The Supply System does not plan to issue formal certificates to individuals within the scope of ANSI /ASME N45.2.6-1978 and Regulatory Guide 1.8.
However, information similar to that described in this section of the Standard will be available in documented form attesting that the individual is capable of performing the assigned task (s). The Supply System will use a similar approach in evaluating supplier compliance with this section of the Standard.
5.
Section 3 of ANSI /ASME N45.2.6-1978 divides the capability requirements of inspection, examination, and testing personnel into three levels, namely Level I, Level II, and Level III.
The Supply System will not assign these levels to its personnel performing inspection, examination, and testing activities.
However, the selection of personnel for particular tasks will be such as to match the capabilities to the types of tasks and FORM: NOSL3A, REY. 0
l WASHINGTON PUBUC POWER SUPPLY SYSTEM II 12 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
II.9 (contd.)
maintain the intent of the three levels. The judgement to de-termine that a person's qualifications and capabilities meet the intent of a certain level of inspection, examination, and testing function is made through the normal management process by using established administrative and personnel procedures. Documentation for such justification will be maintained on file. A similar approach will be used to evaluate the quali-fications of non-NDE personnel of Supply System suppliers.
II.10 REGULATORY GUIDE 1.64. REV. 2 (June 1976)
" Quality Assurance
}
Requirements for the Design of Nucl' ear power plants" The Supply System will implement the Regulatory Position of Reguia-tory Guide 1.64, Rev. 2 (June 1976), subject to the following:
l Regulatory Position C.2 of Regulatory Guide 1.64, Rev. 2 (June 1976) states that individuals performing design verification should not have insnediate supervisory responsibility for the individual per-forming the design. It further states that while design verifica-l tion by the insnediate supervisor is ancouraged, it should not be construed that such verification constitutas the required indepen-dent design verification.
It is the Supply System position that if the designer's inrnediate supervisor is the most technically quali-fied individual available in the organization to perform a design verification by design review, this review may be conducted by the supervisor, providing that:
FORM: NOS 3A. REY. O i
l
PAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM II-13 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
II.10 (contd.)
l a.
The justification is individually documented and approved in advance by the supervisors's management and b.
Quality Assurance audits cover the frequency and effectiveness of use of supervisors as design verifiers to guard against abuse.
II.11 REGULATORY GUIDE 1.74 (February 1974)
"Ouality Assurance Terms and Definitions" The Supply Sys, tem will implement the Regulatory Position of Regula-tory Guide 1.74, (February 1974), subject to the following:
l
(
l.
Regulatory Position "C" of Regulatory Guide 1.74 (February 1974) specifies certain documents recommended be included in tFe definition of " procurement documents", defined in ANSI N 45.2.10-1973. The Supply System will use the following definition:
Procurement Documents - Purchase requisitions, purchase orders and contracts with attachments necessary to specify/ verify requirements.
2.
Section 2 of ANSI N45.2.10-1973: The definition of "specifica-tion" is revised to read as follows:
FORM: NOS 3A, REV. 0 l
WASHINGTON PU8UC POWER SUPPLY SYSTEM II-14 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
1I.11 (contd.)
Specification - A statement of a set of requirements to be satisfied by a product, a material, a service or process indi-cating, whenever appropriate, the procedure by means of which it may be determined whether the requirements given are satisfied.
II.12 REGULATORY GUIDE 1.88. REV. 2 (October 1976)
" Collection Storage, and Maintenance of Nuclear power Plant Quality Assurance Records" The Supply System will implement the Regulatory Position of Regula-tory Guide 1.88, Rev. 2 (October 1976), subject to the following:
1.
Regulatory Position C.2 of Regulatory Guide 1.88, Rev. 2 (Octo-ber 1976) endorses the 4-hour fire rating requirements for a single records storage facility as described in Section 5.6 of ANSI N45.2.9-1974. The Supply System modifies this 4-hour rat-ing requirement of ANSI N45.2.9-1974 to 2-hour fire rating re-quirement. Accordingly, the Supply System will comply with a substitute to the third, fourth, and fifth paragraphs of Sec-tion 5.6 of ANSI N45.2.9-1974 which reads, "Where a single record storage is maintained, the QA records shall be main-tained in either:
a.
A 2-hour vault meeting NFPA (National Fire Protection Association) No. 232-1975 without additional provisions or b.
2-hour rated file containers meeting NFPA No. 232-1975 (Class B) without additional NFPA provisions or 1
i i
FORnt: NOS 3A, REV. O
WASHINGTON PUBLIC POWER SUPPLY SYSTEM II-15 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
II.12 (contd.)
c.
2-hour rated fire resistant file room meeting NFPA No.
232-1975 with the following additional provisions:
(1) Early warning fire detection and automatic fire sup-pression shall be provided, with electronic super-vision at a constantly attended central station.
(2) Records shall be stored in fully enclosed metal cabinets. Records shall not be permitted on open steel shelving. No storage of records shall be permitted on the floor of the facility. Adequate access and aisle ways shall be maintained at all times throughout the facility.
(3) Work not directly associated with records storage or retrieval shall be prohibited within the records storage facility. Examples of such prohibited ac-tivities include but are not limited to: records reproduction, film developing, and fabrication of microfiche cards.
(4) Smoking and eating / drinking shall be prohibited throughout the records storage facility.
(5) Ventilation, temperature, and humidity control equip-ment shall be protected inside with standard fire-door dampers where they penetrate fire barriers bounding the facility.
FORM: NOS 3A, REV. O
PMW WASHINGTON PUBLIC POWER SUPPLY SYSTEM II-16 OPERATIONAL w.
QUALITY ASSURANCE PROGRAM DESCRIPTION 7
II.12 (contd.)
2.
Section 3.2.2 of ANSI N45.2.9-1974 is revised to read, "Index -
The quality assurance records shall be indexed. The indexing system (s) shall include, as a minimum, record retention times and the location o/ the records within the record system. The indexing system (s) shall provide sufficient information which can be used to identify item (s) or activity (ies)".
3.
Section 5.4.3 of ANSI N45.2.9-1974 is revised to read, "Special Processed Records - Provisions shall be made for special pro-cessed records (such as radiographs, photographs, negatives, and microfilm) to prevent damage from excessive light, stack-ing, electromagnetic fields, and temperature. These provisions will be delineated in proceduras and/or instructions which will incorporate, or take into consideration, available manufac-turers' recommendations".
II.13 REGULATORY GUIDE 1.94, REV.1 (April 1976)
" Quality Assurance Requirements for Installation, Inspection, and Testing of Structural Steel Ouring the Construction Phase of Nuclear Power Plants"_
l Regulatory Guide 1.94, Rev.1 (April 1976) is not considered appli-cable to operations phase activities. However, the Regulatory Posi-tion of Regulatory Guide 1.94, Rev.1 (April 1976), where appropri-ate, will be implemented for those applicable operational phase activities that are comparable to construction phase activities.
j PORM: NOS4A, REV. 0
9MM WASHINGTON PUBUC POWER SUPPLY SYSTEM II-17 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
II.14 REGULATORY GUIDE 1.116, REV. 0-R (May 1977)
" Quality Atsurance l
Reauirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems" The Supply System will implement the Regulatory Position of Regula-tory Guide 1.116, Rev. 0-R (May 1977), subject to the following:
1.
Regulatory Position C.3 of Regulatory Guide 1.116, Rev. 0-R (May 1977) recommends that the requirements of Section 5 of ANSI N45.2.8-1975 pertaining to preoperational tests, cold functional tests, and hot functional tests should be used in conjunction with Regulatory Guide 1.68.
The Supply System will
~
comply with the implementation of Regulatory Guide 1.68 as de-scribed in Chapter 14, " Initial Test Program", of the Final Safety Analysis Report.
2.
Section 2.3 of ANSI N45.2.8-1975, last sentence is revised to read, " Test reports shall include an evaluation of the accept-ability of inspection and test results and provide for iden-tifying the individual who performed the evaluation".
3.
Section 2.8.2 of ANSI il45.2.8-1975 states, " Records of calibra-tion shall be included in inspection and test results." The Supply System does not intend to include calibration records in inspection and tests results, Instead, the calibration records will be maintained in a separate file.
4.
Section 2.9.e(6) of ANSI.2.8-1975 states, " Evidence that engi-neering or design changes are documented and approved prior to installation". The Supply System may permit installation of an item prior to approval of the related engineering or design FORM: NOS.3A, REV. 0
WASHINGTON PU8 tlc POWER SUPPLY SYSTEM I7,lg OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
II.14 (contd.)
change provided procedural controls, requiring evidence of engineering or design change approval prior to placing the affected item into service, are instituted.
II.15 REGULATORY GUIDE 1.123, REV.1 (Ju.ly 1977)
" Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants" The Supply System will implement the Regulatory Position of Regula-tory Guide 1.123, Rev. 1 (July 1977), subject to the following:
Section 1.3 of ANSI N45.2.13-1976: The Supply System will comply with the definition of " procurement documents" as stated in its position statement on Regulatory Guide 1.74 (February 1974).
II.16 REGULATORY GUIDE 1.144, REV.1 (September 1980)
" Auditing of Quality Assurance Proorams for Nuclear Power Plants" The Supply System will implement the Regulatory Position of Regula-tory Guide 1.144, Rev. 1 (September 1980), subject to the following:
Section 4.4.4 of ANSI N45.2.12-1977 requires the audit report to include an evaluation statement regarding the effectiveness of the quality assurance program elements that were audited. Since the audit by its very nature is an evaluation of the quality assurance program effectiveness, the audit report itself is considered to be an evaluation of the quality assurance program effectiveness.
Therefore, this section of the Standard is revised to read "A Summary of Audit Results".
FORM: NCS-3A, REY. O
WASHINGTON PUBLIC POWER SUPPLY SYSTEM 77_19 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION 7
11.17 RJGULATORY GUIDE 1.146 (August 1980)
" Qualification of Quality l
Assurance Program Audit Personnel for Nuclear Power Plants" The Supply System will implement the Regulatory Position of Regula-tory Guide 1.146 (August 1980).
FORM: NOS-3A, REV. 0