Motion for Summary Disposition of OL Application on Grounds of Matl False Statement in Amend to Environ Rept.Certificate of Svc Encl.Related Correspondence
ML20073R748
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 04/28/1983
From: Hiatt S
OHIO CITIZENS FOR RESPONSIBLE ENERGY
To:
Atomic Safety and Licensing Board Panel
References
NUDOCS 8305040528
Download: ML20073R748 (18)


Text

.

)

RELATED CORRESPONDENCR April 28, 1983 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION 00CKETED ur=c Before the Atomic Safety and Li_ensine Board c

In the Matter of

)

  • d3 E',i-3 fig:g

)

y CLEVELAND ELECTRIC ILLUMINATING

)

Docket Nos. 50-M 0 COMPANY, Et A1.

)

50-441

)

(Operating License)

(Perry Nuclear Power Plant,

)

f Units 1 and 2)

)

)

MCfrICN FOR SIMRIE DISPOSITION OF THE OPERATING LICENSE APPLICATION Intervenor Ohio Citizens for Responsible Energy ("OCRE") hereby naves for sumary disposition of the operating license application for the Perry Nuclear Power Plant, Units 1 and 2, on the grounds that Ap-plicants have made a material false statement in their application, specifically, in an amndment to their Environmental Peport.

I.

The Material False Statement Section 5.5.1.4 of NUREG-0884, the NRC's Final Environmental Statement for PNPP (Exhibit A), which describes the environmental im-pacts of transmission lines, contains the statement that'it is not the policy of Applicants to use herbicides for vegetation control along transmission line corridors. The Staff apparently used Applicants' response to Staff Question 290.08 on the ER-OL (Exhibit B) to reach this conclusion. However, Applicants, in their Amended Application to the Ohio Power Siting Board for the Perry-Hanna 345 kV Transmission Line (Exhibit C) state that they will indeed use herbicides to control vegetation along transmission lines.

(It should be noted that Applicants stated their intent to use herbicides in an earlier application to the OPSB as well.)

It is thus obvious that Applicants made a material false statement to the NBC in response to Staff Question 290.08.

8305040528 830428

/

O PDR

-.'))'

PDR ADOCK 05000440 Applicants might perhaps argue that they understood the Staff's question to pertain only to transmission lines on the Perry site; but, this interpretation is not substantiated by the evidence of the matter.

\\

Staff Question 290.08 was apparently generated as a result of information concerning an endangered species, the spotted turtle, Clenmys guttata, appearing on p. 2.2-9 of the ER-OL (Exhibit D). The Staff asked Applicants to assess the effects'of transmission line maintenance on that species and to indicate whether herbicides will be used on any portions'of the Perry transmission lines (emphasis added). Applicants knew that the spotted turtle.is not confined to the PNPP site, but is also found along the proposed Perry-Hanna transmission line routes.

See Exhibit E, frcm Applicants' Site Report on the Perry-Hanna 345 kV Transmission Line.

Furthernere, Applicants knew or should have known that the environnental effects of offsite' transmission lines are within the NRC's jurisdiction.

See Detroit Edision Co.

(Greenwcod Energy Center, Units 2 and 3), AIAB-247, 8 AEC -36, 939 (1974) and Public Service Co. of New Hampshire (Seabrook Station, Units 1 and 2), AUG-422, 6 NRC 33, 83 (1977).

Moreover, Section 5.5.1.4 of the DES, issued March 1982, contains identical language pertaining to herbicide use as in the ET:S.

It should be observed that Applicants subnitted detailed ccnments (including the i

correction of minor omissions and typographical errors) on the DES.

See FES pp. A-27 to A-32.

At no point in those conments did Applicants attempt to correct the Staff's statemant in the DES, even when it was obvious that the Staff interpreted Applicants' repsonse to Question 290.08 as pertaining to all (offsite as well as onsite) transmission lines.

II. The Penalty for a Material False Statement Under S 186 of the Atcmic Energy Act (42 USC S 2236) a license tray

be revoked if an applicant has made a material false statement in an application. See also 10 GR 50.100. The Appeal Board in Virginia Electric and Power Co. (North Anna Power Station, Units 1 and 2), ALAB-324, s

3 NBC 347 (1976) held that: (1) scienter is not necessary to show that a statement is false; and.(2) such a statement.is raterial if a staff member might consider it in reaching a conclusion. The Ccmnission (CLI-76-22, 4 NRC 480) affirmed ALAB-324 and added that silence (i.e., anission) as to material facts is the same as paking a material false statement.

In applying these standards to the situation at hand, there can be no doubt that Applicants made a raterial false statement and that the penalty of 42 USC S 2236 should be applied. Applicants subnitted a false and/or inccuplete statement in response to a Staff Question on the ER-OL.

This statement, as part of an amendment to the ER-OL,~ became part of the OL application.. See 10 GR 50.30(f). The NRC Staff used this statement in perparing the DES and FES, thus demonstrating its materiality. Applicants, though aware that the Staff used their false statement verbatim in the DES, unde no effort to correct'it. OCRE thus requests that Applicants' OL application be dismissed and this proceeding terminated.

42 USC S 2236 and 10 G R 50.100 state that a license or construction permit nay be revoked for material false statements in the application.

Applicants, of course, hold only a CP and not an OL. The raterial false statement, however, was made in the OL application.

Since the Licensing Board has no jurisdiction over the terms of the CP (Consuners Power Co.

(Midland Plant, Units 1 and 2), ALAB-674,15 NBC 1101 (1982)), and since the offense was catmitted at the OL stage application, OCRE is moving for sunmary disposition of the OL application pursuant to 10 GR 2.749.

10 GR 2.749 (d) prohibits the use of sumrary disposition for deternuning'whether the CP shall be issued, but that regulation contains no prohibition on

4 such.use of sumury disposition at the OL stage.' And, although 10 CFR 50.100 only specifically. addresses revocation of a license already held, 1/

further language ~ in that section implies that refusing to grant a license s

is an appropriate sanction in the situation at hand. OCRE therefore concludes that this matter is within the jurisdiction of the Licensing Board and that sumary disposition is an appropriate vehicle by which to seek the requested relief, i.e., denial and dismissal of the OL application for PNPP. The short statement of material facts required by 10 TR 2.749(a) is appended hereto.'

Respectfully submitted, s.4c h Susan L. Hiatt OCRE Representative 8275 Munson Rd.

Mentor, OH 44060 (216) 255-3158 1

O i

y 10 TR 50.100 reads in part: "A license or construction permit may be revoked... for any material false statement in the application for the license... or because of conditions... which would warrant the Ccmnission to refuse to grant the license on an original application..."

i 3

_. _...,. _,. _, _ _ - -, - _ - - - - - _ ~...

STATFMENT OF MATERIAL FACTS AS 'IO WHIQi TIERE EXISTS NO GENUINE ISSUE 'IO BE HEAIO 1.

Applicants in their repsonse to Staff Question 290.08 on the ER-OL stated that it is not their policy to use herbicides for vegetation l

\\

control along transmission line corridors. See Exhibit B.

2.

The NRC Staff used Applicants' response verbatim in preparing S 5.5.1.4 t

of the DES and FES, NUREG-0884.

See Exhibit A.

3.

Applicants,-in their application to the Ohio Power Siting Board for l

Perry-Hanna 345 kV Transmission Line, state that they will use herbicides to control vegetation. See Exhibit C.

i 4.

Applicants, in their detailed. couments on the DES (see FES at pp,-

A-27 to A-32) made no attenpt to correct or even address this dis-crepancy.

5.

According-to the standards of ALAB-324 and CLI-76-22, Applicants have made a material false statement in their OL application.

6.

10 GR 50.100 and S 186 of the Atomic Energy Act (42 USC S2236) provide i

as a penalty for a material false statement the revocation of a license, and, by implication, refusal to grant a license in the first instance.

7.

If the requestalrelief (dismissal and denial of the OL application and terminating this proceeding) is granted, there are no other issues to be heard in this p. 6 g as all other issues would be rendered moot.

l hi*

4 f

, _. _ _, _ _.. -.. ~, -. - -. _

i'

.1.1 Cooling-Tower Emissions ferrestrial impacts resulting from the form of condenser cooling were reexamined I

P ty the staff in the light of the changes in cooling system design, made by the New i

nplicant from once-through to closed-cycle natural-draft cooling towers.

information concerning the effects of operation of the PNPP natural-draft cool-

! i' Ing' towers is discussed below.

p :

3

5. 5.1. 2 Drift Fallout i g f

i i

i The applicant has provided calculations of the predicted distribu' tion of drift

!l for two units using onsite meteorological data (ER-OL Section 5.1'.4).

The staff has reviewed the applicant's calculations and concludes that they are vithin a range o.f model predicted valves for fresh-water natural-draft cooling i ;-

The estimated maximum offsite drift deposition rate of 89.6 g/ha/yr ii ltcwers.

i

' (0.08 lb/ acre /yr) is expected at approximate distances of 1.6 and 3.6 km -(1.0 and 2.25 mi) to the east-northeast of the towers.

The composition of the drift q

will be as described in Section 4.2.6.3.

Natural rainfall will prevent a build-vp of chemical-drift deposits in the soil.

A review of experience with fresh-E vater cooling towers, both in this country and abroad, has failed.to provide r :

any findings of an environmental effect' beyond the immediate vicinity of the ~

I:I. '-

cooling towers (Carson).

Therefore, the staff concludes that terrestrial 1 pacts resulting from cooling-tower drift from the operation of PNPP will be s:all.

l; i

5. 5.1. 3 Bird Impaction I

Bird kills by collision with cooling towers and other manmade structures have teen studied and reviewed (Avery et al. ).

Based upon the results of monitoring

)

programs at other facilities with similar types of cooling towers (Jackson and l

Tene), the staff expects that the number of birds killed will be small relative to their populations.

l l

l 5.5.1.4 Transmission Lines Construction of the Perry-Macedonia-Inland transmission line is nearing comple-Lion. The originally proposed Perry-Hanna line was recently refused certifica-tien by the Ohio Power Siting Commission, and an alternate line or an alternate segment to the proposed line has not been chosen by the applicant.

{.

l i.

The staff has reviewed the environmental impacts which could be associated with I

the operation of the PNPP transmission system.

The potential sources of impacts are (1) ozone production, (2) induced electrical currents, (3) electric fields, I

and (4) corridor maintenance..

ltpacts associated with ozone are not expected to change significantly from th:se discussed at the CP stage of review (FES-CP Section 5.5.1.2).

Potential biological effects from electrical fields associated with transmis-sion lines have been reviewed by the U.S. Department of Energy (00E).

While

" experimental work is still under way on the biological effects of electric fields along transmission lines, the staff has found no evidence at this time that the operation of 345-kV lines similar to the PNPP system will have a sig-nificant effect on the health of humans or that it will affect plant or animal

life, i@.1A /\\

Perry FES 5-7

/

The applicant has designed the transmission system in accordance with clearance requirements of the National Electric Safety Code to ensure the safeguard of persons from shock hazards ar.ising from induced electrical currents emanating from transmission lines.

In addition, the applicant undertakes an extensive grounding program within the right-of-way to further reduce shock potentials.

i i

Complaints regarding annoyances from induced voltages outside the right-of-way are responded to by the applicant by additional grounding procedures (ER-OL Q&R,5.5.1).

Maintenance procedures for vegetative control along the PNPP transmission lines will consist of periodical mechanical cutting employing a bush hog.

The appli-cant indicates that it is not his policy to use herbicides for vegetation con-l trol along the PNPP transmission lines.

Thus, it is the staff's evaluation that adverse impacts from maintenance activities will be minimal.

i 5.5.1.5 Monitoring The staff has concluded (Section 5.5.1.2) that the potential for damage to the surrounding ecosystem caused by the water and chemicals in drift from the PNPP Nevertheless, the staff believes it is prudent j

cooling towers will be~ small.

I to undertake a limited-term inspection program because a margin of uncertainty j

An acceptable monitoring program still exists in the foregoing conclusion.

could rely on infrared aerial photography with accompanyi'ng ground verification.

i j

A program to accomplish this will be specified in an environmental protection j

This plan plan that,will be included as Appendix B of the operating license.

also will include requirements for prompt reporting by the licensee of any l

occurrence of important events that potentially could result in significant j

1 environmental impact causally related to plant operation.

Examples of such l

events are excessive bird destruction due to collision with plant facilities, j

j' onsite plant or animal disease outbreaks,-and mortality of any species pro-

.l tected by the Endangered Species Act of 1973 as amended.

,i 5.5.2 Aquatic l

The impacts of PNPP operation on aquatic biota of Lake Erie were considered in l

l' the FES-CP (Sections 5.5.2, 11.1.1, and 11.lc2) for the once-through cooling i

The denial of certification of that system by design proposed at that time.

the State of Ohio in 1974 (see Section 4.2.4 above) required the installation The of the closed-cycle cooling system now proposed and under construction.

Partial Initial Decision (LBP-74-69, 8 AEC 538) of the AEC Atomic Safety and 18, 1974 reviewed the applicant's closed-Licensing Board (ASLB) on September cycle design and found the impact potential to be greatly reduced in compar-ison with the previous once-through proposal.

This analysis does not reiterate the detailed findings of the AEC ASLB, but it focuses rather on identification of any new concerns and a general confirmation of previous findings based on information available since 1974 including:

studies at the' Perry site (see Section 4.3.4); data collected at other operat-ing power plants on Lake Erie in the Perry vicinity; NRC confirmatory assess-ment of the impacts of operation of closed-cycle cooling at the Davis-Besse ly Nuclear Plant.

The potential impact of PNPP on fish spawning and nursery p

activities is addressed.

I I

d<

t !

mn

?

290.08 Provide an assessment of the effec,ts of transmission (5.5) line maintenance procedures on the spotted turtle (Clemmys cuttata).

Indicate whether herbicides will be used along any portions of the Perry transmission Lines.

Response

It is not the policy of CEI to use herbicides for vegetation control along the Perry transmission lines.

CEI cuts the vegetation periodically with a bush hog.

To date, there have not been apparent effects on the s' potted turtle.

~

i f

r 3

k e

g PNPP ER/OL, Sup. 2 Q&R 5.5-3 9/1/81

//in;<&l/g M<,0 'b $ CK% (6..m b

p%,1 4995_g5_g5 G W dr d b - / 6..

.M s K v Page 31-A

%>l1sr.%

%: /idh C 2.

than grubbing methods, and allow the soil cover to remain.

(This method may be changed if req 0ested by a landowner during the process of obtaining an easement).

Vegetation control with herbicides during transmission line operation is described in the following 'section.

3.

Herbicides To control. the many plant species found on the various sites along the right-of-way, a number of herbicides and application methods will be used., In selecting a herbicide and its application methods, consideration is given to the species to be controlled, its size, density, reproductive P. 05-73 habits, time of application, and the susceptibility to the herbicide, the site and sensitive crops in the area.

In addi-tion, the herbicide is also considered for its selectivity, persistence, toxicity, and its Federal EPA Registered Label Instruction and uses.

l Several methods of application are normally used along the right-of-way.

The five major brush treatments are:

the application of foliage sprays for treating dense or low growi'ng stands of brush; basal sprays for treating less' dense stands of tall trees where aerial application should be avoided; cut surface treatment; stump application where 6.h&M C l

Cleveland Electric Illuminating Company l

Ohio Edison Company:

Pe rry-Hanna

{

4 4906-15-05 i

Page 32-A

~

C 3.

species need to.txt cut; and soil applications for herbicides that are taken up through root absorption.

~

Brief Description of Application Methods a.

Foliage Application Method

~

The wetting of the leaves and stems with a herbicide by spraying.

l b.

Basal Application Method The wetting of the lower 12" to 24" of the plant stem, including the root collar, with a herbicide to the point of runoff.

c.

Cut Surface Application Method The cutting of the stem's bark to the sapwood and applying the herbicide to the cut surface.

d.

Stump Application Method The wetting of-the stump surface with the herbicide, making sure the herbicide reaches the cambium and runs down to the root collar.

e.

Soil Application Method Applying the herbicide to the soil which is then taken up thdough the plant's root system.

When this method is employed, the herbicide will.be applied to the soil. around the base of the plant.

k

6.. C i

Cleveland Electric Illuminating Company Ohio Edi son Company:

Perry-Hanna l

L

4906-15-05 Page 33-A i

C 3.e.

i P. 05-74 Herbicides 'to be used will be of the low or nonvolatile formulati on.

The risks and hazards of' drift will be reduced by the use of 9round crews, for no aerial application will be

~

made.

In addition, the following guides are used for ground application methods:

(1)

Use as low a pressure as possible.

a (2)

Spray down the right-of-way, not across, when foliage spraying.

(3)

Use a spray thickener when conditions warrant it.

(4)

In sensitive crop areas, change chemicals, appli-cation methods, or delay operation until domant season.

The herbicides to be used to control plant growth are phenoxy herbicides Dicamba; Picloran; ammonium sulfanate; Bromicil; Krenite; Triclopyr; and other herbicides registered for brush control.

The phenoxy herbicides will not be used in the northern port, ion of the routes, and no herbicides will be used in the Burton wetlands.

All the herbicides listed to be used pre-sently have a registered label with the U.S. EPA.

A her-bicide that is registered by EPA must also be classified by Ex. C Cleveland Electric Illuminating Company Ohio Edison Company:

Perry-Hanna

4906-15-05 Page 34-A C3.e.(4)

EPA as a herbicide for general or restricted use.

General use herbicides under the law are those that will damage the s

environment very little or not at all when applied as the label directs, and can be purchased by anyone for use on his property.

All the herbicides listed by the Applicant for use on the right-of-way can be obtained with a general use label.

The Applicant will notify the OPSB staff at least 15 days before applying, herbicides and will submit a map of the area along the right-of-way which may be chemically treated, the labels of the herbicides that may be used, and written permis-sion for the OPSB staff to inspect the site during the appli-cation of herbicides pursuant to 0AC 4906-1-17.

      • Page 05-74 The application of the herbicides will be done by pes-ticide applicators licensed by the Ohio Department of Agriculture and in compliance with federal and state laws.

Herbicide Description 2,4-dichlorophenoxyacetic acid is a selective herbicide, is nonpersistent and with a soil persistence half-life of 4 days, has a toxicity rating of 4 (slightly toxic), and more specifically has, an LD50 of 500 mg/kg.

Its mode of action is systemic and is effective on many plants.

Er C Cleveland Electric Illuminating Company Ohio Edison Company:

Perry-Hanna

4906-15-05 Page 35-A C3.e.(4) f s

P.~05-75 Dicamba is a selective harbicide, is nonpersistent with a soil persistence half-life of 25 days, has a toxicity rating of 4 (slightly toxic), and more specifically has an LD50 Of 1,000 mg/kg.

Its mode of action is systemic, and can be taken up by the plant roots.

Picloram is a selective herbicide, is more persistent than 2,4-dichlorophenoxyacetic acid, or ' Dicamba and has a soil persistence hal.f-life of 100+ days; has a toxicity rating of 5 (almost nontoxic), and more specifically has an LD50 Of 8,200 mg/kg.

Its mode of action is systemic, and it can be taken up by the plant roots and is effective on root suckering species, but shows resistance by ash and oak.

Ammonium sulf amate is a nonselective herbicide, is non-persistent and disappears after 6 to 8 weeks.

It has a toxicity rating.of 5 (almost nontoxic), and more specifically has an LD50 of 3,900 mg/kg.

Its mode of action is by contact on weeds and grass, and certain formulations are registered for use around reservoirs.

Bromocil is a nonselective herbicide, is persistent with a soil persistence half-life of 150+ days, has a toxicity rating of 5 (almost nontoxic), and more specifically has an Ex. C Cleveland Electric Illuminating Company Ohio Edison Company:

Perry-Hanna

4906-15-05 Page 36-A C 3.e.(4)

LD50 of 8,200 mg/kg.

Its mode of action is through root uptake, and it is effective in controlling ash and other hard-to-kill plant species.

Krenite'is a selective herbicide which contains 42 percent ammonium ethyl carbamolyphosphate.

It has an LD50 Of 24,000 mg/kg.

Its mode of action is by contact' with foliage.

d It has a toxicity rating of 5 (almost non-toxic) and breaks down in soil in '2 to 3 weeks.

Krenite is applied as a late season foliage application for control of woody species in noncropland areas including land adjacent to and surrounding domestic water supply reservoirs, water supply streams, lakes s

and ponds.

Triclopyr is a selective herbicide, is nonpersistent with an average soil persistence half-life of 46 days, has a toxicity rating of 4 (slightly toxic), and more specifically has an LD50 of 2,140-2,830 mg/kg.

Its mode of action is l

similar to that of the phenoxy herbicides, i.e., systemic, and it provides better control of ash than other herbicides.

      • Page 05-76 Where a choice exists, the herbicides to be favored are those that are selective and nonpersistent.

~

Cleveland Electric Illuminating Company i

Ohio Edison Company:

Perry-Hanna l

4906-15-05 Page.37-A C 3.e.(4)

The carriers for the herbicides to be used are water and/or oil.

The:. rate of active ingredient per 100 gallons of mix will not exceed the Registered Label Instruction for the chemical and carrier to be used.

The gallons of chemical applied per acre;is dependent on the stand density, the method of application and the carriers used.

The range-for foliage application is one to four gallons per acre, with past aver-ages being about two gallons per acre on established rights-of-ways.

4.

Impact on Pest Species The major,.and most commonly encountered, group of pest species in the project area are the insects.

Characteristic species associated with health hazards to both man and other animals include mosquitoes, fleas, mites, ticks, and flies.

Another pest presenting potential health hazards is the Norway Rat.

Not considered a pest species but of concern because of its susceptibility to rabies is the common striped skunk.

Plant pests of economic importance include certain insect species such as grasshoppers, caterpillars, aphids, cutworms, beetle's, and corn borers.

Wildlife species such as rabbits and raccoons, if at sufficiently high population levels, could EX.. C.

Cleveland Electric Illuminating Company Ohio Edison Company:

Perry-Hanna

horned owls, one pair;of barred owls, one pair of red-tailed hawks, and five to seven pairs of. screech owls were believed to have bred on the PNPP site in 1978,(Figure 2.2-4).

Changes in the raptors at the;PNPP have corresponded to statewide variations from' year to year.

2.2.2.2.3 Reptiles and Amphibians Six species of amphibians, two species of turtles, and two species of snakes have been reported from the PNPP site since 1972 (Table 2.2-9).

These species are typical of the region.

The spotted turtle (Clemmys guttata) was observed at the site in 1972 and 1977.

In.1977,.two were found in the marshy pasture near the reinfogcement bar storage area, and one was found in the transmission corridor in the' southeastern.part of the site.

This species is, listed as " endangered" in Ohio by the State.Ill)

The spotted turtle inhabits shallow, clear waters, such as roadside ditches, small ponds, and slow streams.(12) 9 k

2 E]%- O L 2.2-9

Q,n 5iTE & R% U W) * "I'!*#

A swKV 73ws""so" W%

  • THE CLEVELANo ELECTRIC ILLUMIN ATING COMPANY oHlo EolsoN COMP 4.NY localities are being traversed or disturbed by the proposed Preferred or Al ternate Routes.

The species of general concern are:

m.

d Clemmys guttata, Spotted Turtle

-is a small (5" max.),

thoroughly aquatic turtle which prefers shallow water in marshes, bogs, small streams ~ and even roadside ditches.,It is considered primarily carnivorous y

but will take plant materials on occasion.

It has been collected from the west end of Mentor Marsh in l

Lake County, from Solon Bog and Aurora Pond in Aurora Township in Portage County and f rom Burton Township t

in Geauga County.

This species has also been found 2

near where the Alternate Route crossed Highway 6 west of Montville in Montville Township, Geauga County (Figure 02-3d).

The transmission line will not cross any known collection sites but, because of its widespread distribution throughout the project area, the turtle could possibly occur within the proposed right-of-way.

However, impacts on aquatic habitat will be minimal as discussed earlier and any impact on this species is considered unlikely.

Emydoldea blandingi, Blanding's Turtle - is a relatively large (10" or more), essentially aquatic turtle which will eat both plant and animal material.

It occasionally wanders onto land but seldom far from marshes, bogs, lakes, and small streams.

It has been collected f rom two areas in western Lake County:

Black Run Swamp west of Fairport and f rom the west end of Mentor Marsh in Mentor Townshio.

btb d E 05-33 Revised March 6, 1979

?:

CtacuICATE OF SERVICE 09.QQED This is to certify that copies of the foregoing mrION'FOR

SUMMARY

~

DISPOSITION OF 'IHE OPEPATING LICENSE APPLICATION were served by deposit in the U.S. Mail, first class, postage prepaid, this/2,M] day 3og!~ I /

ril 1983 to those on the service list below.

s

'{

W

' Susan L. Hiatt SERVICE LIST

~

Peter B. Bloch, Chairman Atomic Safety & Licensing Board Daniel D. Wilt, Esq.

U.S. Nuclear Regulatory Comm'n P.O. Box 08159

~

Washington, D.C.

20555 Cleveland, OH 44108 Dr. Jerry R. Kline Atomic Safety & Licensing Board U.S. Nucitar Regulatory Comm'n Washington, D.C.

20555

.Mr. Glenn O. Bright Atomic Safety & Licensing Board U.S. Nuclear Regulatory Comm'n Washington, D.C.

20555 Docketing & Service'Section Offic'e of the Secretary U.S. Nuclear Regulatory Comm'n Washington, D.C.

20555 James M. Cutchin~, IV Esq.

Office of the Executiv,e Legal Director U.S. Nuclear Regulatory Comm'n Jay Silberg, Esq.

1800 M Street, N.W.

Washington, D.C.

20036 litomic Safety and Licensing Appeal Board. Panel U.S. Nuclear Regulatory Commission Washington, D.C.

205S5 t