Interim Deficiency Rept Re Incorrectly Sized Reactor Pressure Vessel Water Level Transmitters.Replacement of Transmitters Expected by 830501.Final Rept Will Be Submitted Upon Work Completion
ML20073R659
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 04/29/1983
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8305040465
Download: ML20073R659 (1)


Text

,

a,;

p.

.i

.' { 1 -

n jt

  • y w

=

,a a

e L.

  • i 1

1' c-1 o

P o. box 5000 - CLEVELAND. oHlo 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLDG.

- 55 PUBLICSQUARE Serving The Best !~

' " " ~ %

^'2 nm FAINCI/'At/ STpf F/

MURRAY R. EDELMAN April 29, 1983 vqq j/g M /nF / p; VICE PRESIDENT fpA

/ - QCg NUCLEAR l

Mr. James G. Keppler 6' M t l v. F A P.fli \\/U 7'

Regional Administrator, Region III J

Mg Q;

../

Office of Inspection and Enforcement

'*Vid it b

.[

l U.S. Nuclear Regulatory Commission u

i M

/t ML

/

'l li /

I 799 Roosevelt Road Clen Ellyn, Illinois 60137 OL\\

l*

(F 1 L'E'lp j?Q t

RE:

Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Reactor Pressure Vessel Water Level Transmitters [RDC 49(82)]

Dear Mr. Keppler:

Our interim report, dated April 8, 1982, concerning incorrectly sized water level transmitters in the Unit i and Unit 2 reactor pressure vessels, stated that the wide range transmitters would be replaced with the correct narrow range transmitters by May 1, 1983. Due to restricted access to the vessels because of construction work in the containment dome, it is now anticipated that the replacement of the water level transmitters will be completed by May 1, 1984. Our final report will be submitted when the replacement of the transmitters is completed.

Please call if there are any additional questions.

Sincer y,

y Murray R. Edelman Vice President l

Nuclear Group MRE:pab cc:

Mr. M. L. Gildner bTC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 U.S. Nuclear Regulatory Commiasion c/o Document Management Branch Washington, D.C.

20555 Records Center, SEE-IN Institute of Nuclear Power Operations g

1100 Circle 75 Parkway, Suite 1500 C

Atlanta, Georgia 30339 8305040465 830429 MAY 2 1983 PDR ADOCK 05000440 S