Forwards Investigation of Unit Trips, Unit Fast Recovery, Actions Required for ATWS Event, Reactor Trip, & Evaluation Re Mod to Provide Automatic Reactor Trip Breaker Actuation,Per NRC Request
ML20073R486
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 05/02/1983
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20073R489 List:
References
NUDOCS 8305040229
Download: ML20073R486 (3)


Text

1 Dunn POWER Goxiev 1*.O. ISOX 33180 CIIARLOTTE, N.O. 28242 HALB. TUCKER TELEPHONE (704)!!73-4534 vice reenme=T May 2, 1983 mm. m.m-,,.

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: McGuire Nuclear Station Docket Nos. 50-369, 50-370

Dear Mr. Denton:

Per an NRC staff request, the following documents are provided (enclosed) to support NRC staff review of problems with reactor trip breakers (RTB):

Station Directive 3.1.10, " Investigation of Unit Trips" Procedure OP/1/A/6100/05, " Unit Fast Recovery" Procedure AP/0/A/5500/34, " Actions Required for an A1WS Event" Procedure AP/1/A/5500/01, " Reactor Trip" gh Evaluation, pursuant to 10 CFR 50.59, concerning the modification to provide automatic RTB actuation via the shunt attachment Please advise if there are any questions.

8 p0'.

T.b' A Very truly yours, pena M AM Hal B. Tucker C'*

REH:jfw

~

Enclosures cc:

Mr. James P. O'Reilly, Regional Administrator Mr. W. T. Orders U. S. Nuclear Regulatory Commission NRC Resident Inspector Region II McGuire Nuclear Station 101 Marietta Street, Suite 2900 Atlanta, Georgia 30303 8305040229 830502 PDR ADOCK 05000369 S

PDR

STATION DIRECTIVE 3.1.10 APPROVAL DATE

// 3h?

,e b,v DUKE POWER COMPANY McGUIRE NUCLEAR STATION INVESTIGATION OF UNIT TRIPS OBJECTIVE This directive specifies the requirements for investigation of unit trips.

IMPLEMENTATION Upon a Unit Trip, the Superintendent of Operations or his Operations Duty Engineer will initiate an investigation of sufficient depth to determine the cause and the effects of the trip.

Prior to restart of the unit, the Superin-tendent of Operations or his Operations Duty Engineer will assure that:

1.

The cause of the trip is known or has been investigated to the full extent possible while remaining in the shutdown condition.

2.

The effects of the unit trip are such that a resrcrt may be made without further review.

l 3.

Any equipment or component malfunctions observed, important to safe I

operation, are corrected prior to restart.

APPLICABILITY The effects of the Unit Trip will be evaluated and documented by an Engineer from the Performance Section assigned to the unit.

Where appropriate, the Superintendent of Operations or his Operations Duty Engineer will request that the Engineer from the Performance Section take full responsibility for the trip investigation and upon completion make recommendation to the Superintendent of Operations or his Operations Duty Engineer concerning restart of the unit.

l Operations Group will maintain responsibility for the unit. The evaluation of the trip or transient will be made and documented by Performance, but is not a j

part of the decision to restart the unit unless the Superintendent of Operations i

l i

-, - -. - - ~

or his Operations Duty Engineer specifically requires this information on any given trip.

The decision to restart rests with the Operations Group.

DESCRIPTION In any investigation of a unit trip, the ~ Performance Group investigator will have available to assist him, the appropriate individuals from the station organization to pursue the various facets of the trip.

The investigator may call a meeting of appropriate personnel to define the investigative program and make assignments with appropriate time limits for completing the investigation and taking of corrective action.

Full cooperation of all Station personnel must be provided to ascertain what happened so that the appropriate action for returning the unit to service is achieved.

The Technical Services Engineer should be notified for any unit trip classified as a reportable occurrence.

The Station Review Committee will make recommendations on any incident reports resulting from unit trips, r'~'y PROCEDURE t

\\

\\

l The investigator, after completing the investigation will:

1.

Advise the Superintendent of Operations or his Operations Duty Engineer of his findings and recommendations for followup actions that may or may not require resolution before unit startup.

2.

Prepare a written report detailing the investigation. (This may be done after recovery from the trip).

,~

l C/