Final Deficiency Rept DER 82-81 Re R-Class Instruments Installed in Lieu of Q-Class in Diesel Generators.Initially Reported on 821222.Honeywell Instruments Inspected. Identified Individuals Dismissed
ML20073Q069
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/12/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-23471-BSK, DER-82-81, NUDOCS 8304280141
Download: ML20073Q069 (3)


Text

J't

{I)dskENos.650528/529/530i s..

i??c$ff)

~

i; Arizona Public Service Company gy pI

[ g h 1 13 7,

P.O. BOX 21666. PHOENIX. ARIZONA 85036 April 12, 1983

,q:gN/ E'!7 ANPP-23471-BSK/RQT U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210

. alnut Creek,' CA 94596-5368 W

Attention: Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Final Report - DER 82-81 A 50.55(e) Reportable Condition Relating to R-Class Instruments Were Installed In Lieu Of Q-Class In Units 1 and.2 Diesel Generator Buildings File: 83-019-026; D.4.33.2.

Reference:

A) Telephone Conversation-between P. Narbut and

. G. Duckworth on December 22, 1982 B) ANPP-22779, dated January 19, 1983 (Interim Report)

C) ANPP-23255, dated March 15, 1983 (Time Extension)

Dear Sir:

Attached is our final written report of the Reportable Deficiency under 10CFR50.55(e), referenced above.

k Very truly y rs, 91 m

nat E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects Management ANPP Project Director EEVB/RQT:db Enclosure

-cc: See Page 2 1 #

9 l

f AL 8304280141 830412' PDR ADOCK 05000520 S

PDR

a.

~

~ k.

.e,..

L Mr. D. M.'Sternberg

-ANPP-23471-RQT/BSK-April 12, 1983 Page 2 cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

G. C. Andognini J. A. Roedel-O. B. Fasnacht A. C. Rogers B. S..Kaplan W. E. Ide

' J. Vorees J.-R.

Bynum P. P. Klute/D. D. Green A. C. Gehr W. J. Stubblefield W. G. Bingham-R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E.'Vorderbrueggen G. A. Fiorelli Records Center

-Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339

e FINAL REPORT - DER 82-81 DEFICIENCY EVALUATION 50.55(e)

ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNITS 1 & 2 I.

DESCRIPTION OF DEFICIENCY-11e Waldinger Corporation is the prime HVAC Subcontractor to

'Bechtel Power Corporation and in turn purchases instruments from Honeywell. Honeywell employees have notified The Waldinger Corporation of the following irregularities in installation of instrumentation ~in the Units-l 'and 2 Diesel Generator Buildings:

Non quality Class-Q instruments installed in safety-related a..

locations

'four (4) in Unit 1 and five (5) in Unit 2.

b.

. Instruments have been found deliberately damaged (bent probes) in an attempt to cover up errors.

These irregularities indicate that the other instrumentation 4

provided'and installed by Honeywell may not have had all the engineering acceptance criteria identified.

II.

ANALYSIS OF SAFETY IMPLICATIONS This condition is evaluated as Reportable.

Improper application and/or damaged instrumentation devices could possibly cause the safety related HVAC system to malfunction or to be improperly operated. This condition constitutes a safety significant condition as defined by 10CFR50.55(e). The Waldinger Corporation has previously notifiad the NRC of this condition via a 10CFR -Part 21 Report on 12/3/82.

III.- CORRECTIVE ACTION 1.

All Honeywell instruments (Q, R and S-Class) in Units 1, 2 and 3'will be' inspected by Honeywell in accordance with Honeywell Project Engineering Procedures 2.10, 2.11 and 2.12.

In addition, Waldinger Quality' Control will perform a reinspection of all Q-Class and a sample of R-Class Honeywell instruments (all units).

2. -

The condition is' evaluated as an isolated event.

3.

Identified individuals have been dismissed-from the jobsite.

All Honeywell employees have been instructed in the

~

~

requirements to report discrepant conditions in accordance with Honeywell Procedure QSP 15.1 rather than attempt to cover up an error by damaging instruments.

Copies of this report will be transmitted to The Waldinger Corporation who,' in turn, will notify the responsible Honeywell individuals.

..