I Docket Nos.150-528/529/530
~
fE$4f).-
Arizona Public Service Company
/Of P.O box 21666. PHOENIX. ARIZONA 85036
' If April 14, 1983
. h, ANPP-23504-RQT/BSiflii',p3.. :
9 U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. D. M. Sternberg, Chief Reactor Projects Branch 1
Subject:
Interim Report - DER 83-14 A'50.55(e) Potentially Reportable Deficiency Relating to Diesel Generator Protective Relays By Westinghouse Failed Due to Leaking Capacitors File:
83-019-026; D.4.33.2
Reference:
Telephone Conversation between A. D'Angelo and R. Tucker on i
March 16, 1983
Dear Sir:
The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.
Due to the extensive investigation and evaluation required, an Interim Report is attached.
It is now expected that this information will be finalized by_ June 28, 1983, at which time a complete report will be submitted, Very truly ours, I
2E a
ntet E. E. Van Brunt, Jr.
APS Vice President
[
Nuclear Projects Management ANPP Project Director i
.EEVB/RQT:db I
Attachment i
cc: See Attached Page 2 s
9 0
8304280131 830414
~
PDR ADOCK 05000528 S
pg t
7: -
U. S. Nuclear Regulatory Commission ANPP-23504-RQT/ BSK April 14, 1983 Page 2 cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum P. P. Klute/D. D. Green A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 I
J 4
e INTERIM REPORT - DER 83-14 POTENTIAL REPORTABLE DEFICIENCY
-ARIZONA PUBLIC. SERVICE COMPANY.(APS)-
PVNGS UNITS 1.& 2-e I.
POTENTIAL PROBLEM' During'electricaligeneric testing of the Class IE standb'y generation portion of the Unit 1 B Train Diesel Generator, a
= Differential Relay (Westinghouse Type SA-1, Part No. 290B225A10) wasEfound to have leaking internal _ capacitors. ' Replacement of this
' Differential Relay with a Unit 2 Differential Relay was performed with the result that the replacement was found.to contain the same deficiency. ' Inspection of the remaining'two (2) Westinghouse Type SA-1 Differential _ Relays in Units 1 and 2 Diesel Generator Class 1E standby generation systems showed this deficiency to exist.in all four (4) of the subject relays _(documented in Nonconformance Report SE-1676).
II.
APPROACH TO AND STATUS OF. PROPOSED RESOLUTION Bechtel Engineering is currently corresponding with'Co'oper Energy L
Services to' disposition this condition.
III. PROJECT COMPLETION OF CORRECTIVE ACTION AND SUBMITTAL OF THE FINAL REPORT
- Evaluation of this condition and submittal of the Final Report is forecast to be completed by June 28, 1983.