Deficiency Rept DER 82-56 Re Condensate Storage Tank Design Scaled Down W/O New Calculations for Seismic Response. Initially Reported on 821015.Time Extension Requested Until 830524 to Submit Final Rept
ML20073Q026
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/12/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-23467-BSK, DER-82-56, NUDOCS 8304280093
Download: ML20073Q026 (2)


Text

..

{Dockit Nosh 50-528/529/53011 p'

." N C

t Arizona Public Service Company 65;p' A

. P.o. BOX 21666 e PHOENIX, ARIZONA 85036

.fM g. 3;'

J c-

--April 12, 1983 ANPP-23467-BSK/RQT:

'D (Q u

~

~

U'. S. Nuclear Regulatory Commission ERegion V Creekside Oaks Office Park

.1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Time. Extension For Report - DER 82-56 A[$0.55(e)PotentiallyReportableDeficiencyRelatingto Condensate Storage Tank Design Was Scaled-Down Without New Calculations For Seismic Response File: 83-019-026; D.4.33.2

Reference:

(A) Telephone Conver'sation between J. Eckhardt and G. Duckworth on October 15, 1982

(B) ANPP-22179,' dated November 1, 1982 (Interim Report)

'(C) ANPP-22696, dated January 11, 1983 (Time Extension)

.(D) 'ANPP-22845, dated January 27, 1983 (Time Extension)

(E) ANPP-23276, dated March 17, 1983 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference

-(A), an Interim Report was transmitted by Reference (B), Time Extensions were requested by Reference (C), Reference (D), and Reference (E). At

that time,.it was estimated that a Final Report would be available by April 13, 1983.

Due to the extensive evaluation required,.it is now expected that this information will.be' finalized by May 24, 1983, when a complete report swill be submitted.-

There is no change to.the Interim Report at this time.

j Very truly y rs, 1

i \\~

= E. E. Van Brunt, Jr.

L' APS Vice President Nuclear Projects Management ANPP Project Director EEVB/RQT:db' cc: See Page 2 M

J W

8304280093 830412

.PDR ADOCK 0500052 t

8,

-w,w..,

.-,-,2-,..m

,- = = *

--w es -

,--wa,

-, e et,e----*

=

w.m

-s+-e

.-iy, r-----e e,-e---+me,sw-ew n e w g -, =, -e T r r-r ete e

'm W rw " w v -

- y-y"a

Lli 1

Mr.:D. M. Sternberg ANPP-23467-RQT/BSK April 12,' 1983:

'Page 2 cc:

Richard DeYoung, Director Office of. Inspection and Enforcement U. S. Nuclear Regulatory. Commission Washington, D. C. 20555 T. G. Woods, Jr.

.G. C. Andognini J. A. Roedel D. B. Fasnacht.

A. C. Rogers.

B.!S. Kaplan W. E. Ide J. Vorees J. R. Bynum P. P. Klute/D. D. Green A. C. Gehr

'W. J. Stubblefield W. G. Bingham R. ~ L. Patterson R. W. Welcher R. M. Grant D. R..Hawkinson.

L. E. Vorderbrueggen G. A. Fiorelli Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339

,..