Ro:On 830414,following Nonroutine Concentration Test,Control Room Cable Vault Halon Sys Declared Inoperable
ML20073M599
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/15/1983
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8304220151
Download: ML20073M599 (1)


Text

[

.csesa -

  • * ",,. IN0 LANA & MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465-5901 April 15,1983 Mr. J. G. Keppler, Regional Administrator United States Nuclear Regulatory Commission Reg;3n III, !99 Roosevelt Road Glen Elijn., Illinois 60137 Operating License DPR-74 Docket No. 50-316

Dear Mr. Keppler:

This is to confirm a verbal report given to Mr. Neil DuBry of your staff at 1507 hours0.0174 days <br />0.419 hours <br />0.00249 weeks <br />5.734135e-4 months <br /> on this date. At that time, Mr. DuBry was advised that the Unit Two Control Room Cable Vault Halon System had been declared inoperable on April 14, 1983, following_ completion of a non-routine concentration test.

A followup report will be submitted within fourteen (14) days in accordance with Unit Two Technical Specifications, Section 6.9.1.12.

Sincerely,

((),&

v'

~

W. G. Smith, Plant Manager WGS:frb cc:

J. E. Dolan R. S. Hunter M. P. Alexich R. F. Kroeger B. Germano E. R. Swanson/N. E. DuBry, R0:III R. C. Callen, MPSC G. Charnoff, Esq.

J. M. Hennigan R. O. Bruggee, EPRI INP0 PNSRC J. F. Stietzel E. L. Townley P. H. Jacques Dir., IE (40 copies)

Dir., MIPC (4 copies) 8304220151 830415 gDRADOCK05o00 EU-APR 181983

.