ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One  ;

"E FORM NC.

RECORD OF CHANGF.S AND REVISIONS 1000.06A

(

REV. # 12 PC #

EMERGENCY PLAN YROCED0RE

,0' ' be' l Safety Related YES qVNO O OIL SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN 1903.24 *.-.*

$sMi REV. 3; O' "

!*)h j. I 3 i

  • 3 -

.-P. , AGE REV i'C#

PAGE REV PC# PAGE REV PC# PAGE 'REV PC# PAGE REV PCP

.e 1 3 19 3 2 3 20 3 3 3 21 3 4 3 22 3 5 3 6 3 7 3 8 3 9 3 10 3 11 3 12 3 13 3 14 3 15 3 16 3 17 3 18 3 APPROVED BY: APP OV L DATE g [ k REQUIRED I Eff'E TIVE DATE:

~

7G-.1 H-e. ,

8304200533 830415 PDR ADOCK 05000313

-_ ?

, s r2

- PLANT MANUAL SECTION: PROCEDUREMIORK PLAN title: NO:

EMERGENCY FLAN OIL SFILL PREVENTION CONTROL 1 DRON m!RF 4 cot!MTrRitrAS11RF PT VI 1903.24 PAGE 1 of 22 ARKANSAS NUCLEAR ONE aEvmioN CHANGE

, DATE DATE 03/0082 l l

s l

1 l

l

. I l

A7tKANSAS POWER & LIGH1 COMPANY SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN ARKANSAS NUCLEAR ONE NUCLEAR GENERATING PLANT POPE COUNTY, ARKANSAS (Approximately 6 miles west northwest of Russellville, Arkansas)

OWNER: ARKANSAS POWER AND LIGHT COMPANY P. O. Box 551 Little Rock, Arkansas 72203 ATTENTION: Mr. James Levine, Plant Manager PLANT ADDRE55: P. O. Box 608 Russellville, Arkansas 72801 This plan will be imsrfbented 4t"fierein descr,1 bed.

Signature [ '< ,

4 ~. -

Name

, /

William Cavan5 ugh {}

Title Sr. Vice President, Enerny Supply Revised - December 1982 Lr e

hC MmF ~

E w k -M

. . . m PLANT MANUAL SECTION: PROCEDURElWORK PLAN TITLE: NO:

EME.RGENCY PLAN OIL SPILL PREVENTION CONTROL PPorFnt!Pr & COffMTFRMUMffRF PT UJ 1001.24 PAGE 2 of 22 ARKANSAS NUCLEAR ONE ar==N , oATE O CHANGE DATE ovoim CERTIFICATION I hereby certify that I have examined the facility and being familiar with the provisions of 40CFR, Part 112, attest that this SPCC Plan has been prepared in accordance with gocd engineering practices.

srJ4c0 . o c T;'R Printed Name of Registered Professional Engineer Signature of Registered Professional Engineer Date: /y E 3 Registration No. N(( State: P A._

m_

E .

O hr h -

. PLANT MANUAL SECTION: PROCEDURElWORK PLAN TITLE: NO:

EMERGENCY PLAN OIL SPILL PREVENTION CONTROL e ,nn, er n n.n, vce..n r

-v rn. m m, en rum.u.-r o ur i .c,en uvv., u v ue na u.r s.c. - . , . - .

',~oATE-3a ARKANSAS NUCLEAR ONE aEvsoa CHANGE " DATE e,,m,,e,

./

TABLE OF CONTENTS Page 1 of 2 SECTION NO. DESCRIPTION PAGE N0.

1.0 PURPOSE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 2.0 SCOPE. ............................. 5 3.0 REFERENCE 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 4.0 OIL SPILL ACTION . . . . . . . . . . . . . . . . . . . . . . . . 5 5.0 RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . 6 6.0 GENERAL DESCRIPTION. . . . . . . . . . . . . . . . . . . . . . 7

, 7. 0 POTENTIAL SOURCES OF OIL SPILLS. . . . . . . . . . . . . . . . . 7 7.1 Fuel Oil Storage Tank . . . . . . . . . . . . . . . . . . . 7 t

7.2 Fuel Oil Truck Unloading Station. . . . . . . . . . . . . . 8

() 7.3 Emergency Diesel Fuel Tanks . . . . . . . . . . . . . . . . 8

7.4 Diesel Generator Day Tanks. . . . . . . . . . . . . . . . . 9 7.5 Diesel Fire Pump Fuel Oil Day Tank. . . . . . . . . . . . 9 7.6 Startup Boiler Fuel Oil Day Tank. . . . . . . . . . . . . . 9 7.7 Turbine Generator Lube Oil Reservoir. . . . . . . . . . . . 10 7.8 Clean and Dirty Lube Oil Storage Tank . . . . . . . . . . 11 7.9 Turbine Generator Lube Oil System . . . . . . . . . . . . 11 j

7.10 Transformer Oil . . . . . . . . . . . . . . . . . . . . . . 12 I

I 7.11 Unit 2 Plant Heating Boiler Day Tank 2T22 . . . . . . . . 12 I

7.12 Waste Oil Storage Tank T114 . . . . . . . . . . . . 12 7.13 Security Diesel Generator Day Tank . . . . . . . 12

{,

13 7.14 ANO Incinerator Diesel Tank. . . . . . . . . . . .

13 l 7.15 ANO Gasoline Tanks . . . . . . . . . . . . . .

13 7.16 Bechtel Garoline Tanks . . . . . . . . . . . . . .

. . s PLANT MANUAL SECTION: PROCEDUREtWORK PLAN TITLE: NO-EMERGENCY PLAN OIL SPILL PREVENTION CONTROL PonCEDUDE t enUvTERMEASURE PLA" T o n ' ' '1 PAGE f, nr 99 ARKANSAS NUCLEAR ONE arvi=N , DATE n,,nvy O CHANGE DATE TABLE OF CONTENTS Page 2 of 2 SECTION NO. DESCRIPTION PAGE NO.

8.0 FACILITY DRAINAGE tND TREATMENT FACILITIES. . . . . . . . . . . . 13 9.0 INSPECTIONS AND RECORDS. .................... 14 10.0 SECURITY . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 11.0 PERSONNEL TRAINING . . ..................... 14 12.0 ATTACHMENTS AND FORMS. . .... . . . . . . . . . . . . . . . 15 Attachment 1 - Procedure for Use of Special Equipment for Removal of Oil 15-16 from Surface of Water . . . . . . . . . . . 16 Attachment 2 - Oil Spill Response Team Organization and Responsibilities . ....................... 18 Attachment 3 - Criteria for notifying and reporting oil O spills to Company Officials and Government Agencies. . . . . . . 19 Attachment 4 - Site Plan (Location of Fuel Oil Storage Tanks). . 20 l

Form 1903.24A - Report of Spill. . . . . . . . . . . . . . . . . 21 Form 1903.24B - Notification Record. . . . . . . . . . . . . . . 22

'r O

-m

)

. PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO-I EMERGENfY PLAN OIL SPILL PREVENTION CONTROL poncrmmr e engyTro=fr Actine nrsv inn, ,$

PAGE r er ,o n ARKANSAS NUCLEAR ONE aEvisioN , DArE- n,,n,,e,

()

CHANGE DATE l.0 PURPOSE This plan exists to fulfill the requirement of 40CFRll2.3 (a) that "0wners or operators of... facilities...that...could reasonably be expected to dis-charge oil in harmful quantities. ..into or upon the navigable waters of the United States or adjoining shorelines, shall prepare a Spill Prevention Con-trol and Countermeasure Plan (hereinafter "SPCC Plan"), in writing and in accordance with 40CFR110.3 as " discharges...which (a) violate applicable water quality standards, or (b) cause a film or sheen upon or discoloration of the surface of the water or adjoining shorelines or cause damage or emulsion to be deposited beneath the surface of the water or upon adjoin-ing shorelines."

2.0 SCOPE This SPCC Plan delineates potential sources of oil spills and establishes procedures for limiting consequences of an oil spill to the environment.

Criteria for notifying company officials and/or federal and state agencies of an oil spill is also described.

Attachment 2 " Oil Spill Response Team Organization and Responsibilities" may be revised without the update of the certification pages 1 and 2 of this procedure. This will allow updating the Oil Spill Team Members with-7-~3 out altering the plan.

y )

v

3.0 REFERENCES

3.1 References Used in Procedure Preparation 3.1.1 CFR, Title 40, Part 110-Discharge of Oil 3.1.2 CFR, Title 40, Part 112 - Oil Pollution Prevention 3.2 References Used in Conjunction With This Procedure None 3.3 Related ANO References None 4.0 OIL SPILL ACTION 4.1 In the event of an oil spill, available resources shall be used to prevent any oil from entering Lake Dardanelle. Ditches and/or dikes shall be formed, as necessary, with available nachinery to contain oil in the area where the spill occurred.

/'~N m-, -s

. PLANT MANUAL SECTION: PROCEDURElWORK PLAN TITLE: NO: f EMERGENCY PLAN OIL SPILL PREVENTION CONTROL pporFnMDF & COUMTrpMFARMpr PTAM 1001.24 PAGE 6 of 22 ARKANSAS NUCLEAR ONE as==

o CHANGE

, OAT =

DATE ouni m 4.2 If oil reaches the lake, equipment on the oil spill trailer should be used expeditiously to minimize the consequences. The oil spill trailer is equiped with an oil containment boom and is located near the ANO discharge for quick access. Refer to Attachment 1 for in-structions in the use of the oil spill trailer equipment and oil sor-bent. Keys to the trailer compartments, boat house and both boats are located in the guardhouse on a common key ring labeled " Oil Spill".

See Attachment 2 for oil Spill Response Team organization and call list.

4.3 Initial Notification 4.3.1 The Duty Emergency Coordinator shall be notified of any oil spill that has the potential of reaching Lake Dardanelle.

4.3.2 If oil in any quantity reaches the lake, the Duty Emergency coordinator shall be notified as soon as possible. The Duty Emergency Coordinator shall then notify the General Manager, the Technical Analysis Superintendent and the Chemistry / Environmental Supervisor.

4.4 Subsequent Notification (n) 4.4.1 The General Manager or his designee (listed in Paragraph 4.3.2) shall determine if and when additional notification shall be msde.

4.4.2 Criteria icq notification and providing written reports to company officials and other authorities is given in Attach-ment 3.

4.4.3 When it has been determined that an oil spill has occurred, the Duty Emergency Coordinator shall activate the oil Spill Response Team by calling the oil Spill Response Team Leader or one of his alternates. See Attachment 2 for oil Spill Response Team call list.

5.0 RESPONSIBILITIES 5.1 It shall be the responsibility of the Duty Emergency Coordinator to activate the Oil Spill Response Team as stated in Section 4.4.3.

5.2 It shall be the responsibility of the Oil spill Team Leader to co-ordinate oil containment and clean up as pointed out in Attachment 2 of this procedure.

5.3 It shall be the responsibility of the General Manager or his designee to make all notifications and written reports necessary see Attach-ment 3.

v i

. PLANT MANUALSECTION: PROCEDUHE/ WORK PLAN TITLE: NO:

EMERGENCY PLAN OIL SPILL PREVENTION CONTROL PRO?EDURF & COUNTERMFASURF FTAM 1903.24 PAGE 7 of 22 ARKANSAS NUCLEAR ONE aavision a oats 03/01/82 n) t y

CHANGE DATE 6.0 GENERAL DESCRIPTION OF PLANT 6.1 Arkansas Nuclear One is a two-unit nuclear generating station operat-ing on a 1,100 acre site. The plant site is located apprpoximately two miles southeast of London, Arkansas on a peninsula formed by the Dardanelle Reservoir.

6.2 Bulk supplies of fuel oil or lube oil are stored in tanks constructed of material compatible to the ambient and oil temperatures encoun-tered. Storage tanks are inspected periodically for signs of de-terioration, etc., per OP 1305.08, " Fuel Oil, Lube Oil Tank Integrity check". Deficiencies noted are corrected as soon as practical.

6.3 The plant perimeter is enclosed by an eight foot chain link fence topped with three strands of barbed wire.

7.0 POTENTIAL SOURCES OF OIL SPILLS 7.1 Fuel Oil Storage Tank, T-25 7.1.1 The Fuel Oil Storage Tank is of welded steel construction, located on a solid foundation and has a capacity of 185,000 U.S. gallons. The tank has been painted to resist exterior 7-ss corrosion. Cathodic protection is used as required. The 1

)

\' # tank is inspected periodically per OP 1304.71, " Fuel Oil, Lube oil Tank Integrity Test". It is enclosed by an earth fill containment dike which has the capacity of containing the entire tank volume plus approximately 10% rainwater. A gate valve, which is normally closed, is installed at the lowest elevation to allow water drainage. The tank over-flows to a sump which has a connection for a portable pump.

In the event of an overflow the contents of the sump are transferred to 55 gallon drums for disposal as required.

T-25 is within tne Plant Security System (fence and TV sur-veillance). The tank is visually inspected once per shift by operations and may be kept under continuous surveillance via the plant TV system.

7.1.2 The Fuel Oil Storage Tank feeds the emergency diesel storage

. tanks and the startup boiler day tank by gravity or pump and the diesel fire pump day tank by pump. The Unit 2 plant heating boiler day tank is normally filled by pump. All piping is underground and cathodic protection is supplied as required.

l 7.1.3 Major oil spills shall be disposed of using applicable methods. ,

p L,)

- - = __

NO:

  • PLANT tAANUAL SECTION: PROCEDUREN.'ORK PLAN TITLE:

OIL SPILL PREVENTION CONTROL .!

EMERGENCY PLAN inn, m  ;.

puni rmn:p e cemv7tnvvmyr nr w i

PAGE q nr 99 aavision oars o ARKANSAS NUCLEAR ONE CHANGE

~ DATE n,fn,f,,

g 7.2 Fuel Oil Truck Unloading Station 7.2.1 The truck unloading station normally handles one truck at a time. Each truck has a capacity of approximately 7250 i gallons of diesel fuel oil. It is the responsibility of the truck driver to make all connections required to trans-fer the fuel oil from the truck into the fuel oil storage tank. The drivers have been trained to check all valves and fittings before and after the truck unloading. An ANO operator is present during all fuel oil transfer operations.

I 7.2.3 In the event of a major leak, fuel unloading will be stopped immediately and applicable valves will be closed. If the leak cannot be stopped immediately, ditches or dikes will be formed out of dirt or gravel to direct the oil drainage away from ditches or drains which empty into the lake and contain the spill in the smallest area possible, f

7.3 Emergency Diesel Fuel Tanks, T-57 A & B and 2T57 A & B 7.3.1 The Emergency Diesel Fuel storage tanks have a capacity of 22,500 gallons each and are located in separate under-p ground vaults. These tanks maintain 100% volume at all times and are gravity fed from T-25. The tanks are equipped yi with vent piping. The volume of the below daor elevation is sufficient to contain the oil in the event of a ruptured fuel tank.

7.3.2 Tanks T-57 A & B, feed the Unit 1 emergency diesel generator day tanks exclusively through a combination of pumps P16 A

& B. Valves for Unit 1 are lined up per OP 1104.36. Tanks 2T-57 A & B, feed the Unit 2 emergency diesel generator day tanks exclusively through a combination of pumps 2P16 A & B.

Valves for Unit 2 are lined up per OP 2104.36.

7.3.3 Each emergency tank vault has a sump which is connected to a main sump equipped with a manually operated sump pump.

In the event of a main sump overflow, the oil will be con-tained in the vault building basement area. Excess oil accumulation is alarmed by annunciators in the respective control room.

[ 7.3.4 In the unlikely event of a tank rupture, a fuel tank alarm I will sound from the vault. Operations shall immediately close valve FO-4. This action will stop the gravity feed from the Fuel Oil Storage Tank, T-25.

(vD

PROCEDURElwORK PLAN TITLE: NO:

PLANT MANUAL SECTION:

EMERGENCY PLAN OIL SPILL PREVENTION CONTROL ,nnq or T

DD A rr..T1T TP t_

_ P.. A.Y.NT. r D.

  • f.r i O T T7)T*- .3ma rsu - ._ .

aEv=oN ', 1*n-(v~') ARKANSAS NUCLEAR ONE CHANGE " DATE A,,m,,e,

~ ~ ' ' ' ~

t 7.4 Diesel Generator Day Tanks, T-30 A & B and 2T30 A & B l 7.4.1 The Diesel Generator Day Tanks are located in the diesel generator rooms. Each diesel generator room is equipped with metal containment dikes at the doors and is con-nected to the oil water drain system (OWS). Unit 1 diesel generator day tanks are mounted on the D.G. frame and have a capacity of approximately 375 gallons. Unit 2 diesel generator day tanks are located behind a retaining wall inside the D.G. rooms and have a capacity of approximately 550 gallons and are not on the frame.

7.4.2 For Unit 1, transfer pumps P-16 A & B in the underground Storage Tank Vault connect T-57 A & B to the Diesel Gen-erator Day Tanks through buried piping. For Unit 2, trans-fer pumps 2P-16 A & B in the underground Storage Tank Vault connect 2T-57 A & B to the Diesel Generator Day Tanks through buried piping. This piping was designed to ANSI B31.10 and ANO QA program requirements. Valve line up for all Diesel Generator Day Tank fills are performed per OP 1104.23.

r j 7.4.3 In the event of a day tank rupture or fuel line break, the "N fuel oil will drain to the turbine building sump. A tank (d rupture may cause P16 to begin pumping, resulting in more fuel spillage than the quantity contained in the Diesel Generator Day Tanks. In this case a turbine building oil sump high level alarm will signify fuel problems in its respective control room.

7.5 Diesel Fire Pump Fuel Oil Day Tank, T-29

{ 7.5.1 The fire pump day tank is located in the upper level of the intake structure and is protected by a concrete containment dike which is capable of holding the day tanks full capacity of 280 gallons.

1

[ 7.5.2 T-29 is filled directly from the Fuel Oil Storage Tank per i OP 1104.23 by pumps P-74 A & B.

! 7.5.3 A tank rupture would be signified by annunciation K12, D-6,

" Diesel Tank T-29 Level Low" l

7.6 Startup Boiler Fuel Oil Day Tank, T-28 l

k 7.6.1 The Startup Boiler Day Tank has a capacity of 19,000 gal-lons and is located in the northwestern section of the turbine auxiliary building. The fuel oil tank feeds the startup boiler nozzle by fuel oil service pumps P-13 A & B.

l p l \ _.)

1

  • PLANT M ANUAL SECTION: PROCEDURElWORK PLAN TITLE: NO:

EMERGENCY PLAN OIL SPILL PREVENTION CONTROL 10n, 94 DDnrPDFD{ R enHVT{D'F A < ffD{ DT AV PAGE in nr 99 O ARKANSAS NUCLEAR ONE aEvisioN CHANGE

, cATE DATE n, in, ee, C'

l 7.6.2 T-28 is filled directly from the Fuel Oil Storage Tank per OP 1104.23 by gravity or pump.

! 7.6.3 Overflovs or tank leaks are contained in the sump and pumped by P-93 to the Unit 1 turbine building sump.

7.7 Turbine Generator Lube Oil Reservoirs 7.7.1 Unit 1 Lube Oil Reservoir T-27 A. The Turbine Generator Lube Oil Reservoir has a capa-city of 14,000 gallons and is located in a containm3nt room on the ground floor in the southern section of the turbine building. Lube oil transfer is handled per OP 1106.01, " Turbine Lube Oil Transfer".

B. Any Oil Spillage could be accumulated by OWS drains and piped to the turbine building sump. The drain piping is equipped with a stop valve, which is located in the turbine building basement on the south wall out-side T-26 tank room. This valv may be closed if it becomes necessary to contain the lube oil in the con-g~'g tainment room. The drain valve is normally open in S

q ,/ order to prevent accumulation due to normal leakage (considered as a fire hazard).

C. If there is a major oil leak or tank rupture, the oil flow to the turbine building may be stopped by using the drain valve.

7.7.2 Unit 2 Lube Oil Reservoir 2T-27 A. The Unit 2 Turbine Lube Oil Reservoir has a capacity of 6400 gallons and is located in a containment room below ground level in the north end of the Unit 2 tur-bine building. Lube oil transfer for Unit 2 is handled per OP 2106.01.

B. Any oil spillage would be accumulated by (0WS) drains and piped to the turbine building sump.

O,s_-)

., i

. PLANT MANUAL SECTION: PROCEDURElWORK PLAN TITLE: NO:

EMERGENCY PLAN OIL SPILL PREVENTION CONTROL PROFFOURF & COUHTTPMFASURe PTAM 1903.24 PAGE 11 of 22 (o,) ARKANSAS NUCLEAR ONE aEvisioN CHANGE

, o*TE DATE 03/oirs, 7.8 Clean and Dirty Lube Oil Storage Tanks 7.8.1 Unit 1 Clean and Dirty Lube Oil Storage Tank T-26 A. The Clean and Dirty Lube Oil Tanks are located side by side with the clean tank overflowing into the dirty lube oil tank. T-26 is located in the southeast corner of the turbine building basement and has a total capa-city of 31,218 gallons. The tank is contained in a room equipped with a fireproof, watertight door and an OWS drain with a stop valve just downstream of the drain (located on the floor outside the containment room). This valve is normally open to prevent any ac-cumulation of any tank leakage.

B. The T-26 drain is connected to the turbine building sump. As with the T-27 drain valve, this stop valve may be closed if required.

7.8.2 Unit 2 Clean and Dirty Lube Oil Storage Tank 2T-26 A. The Unit 2 Clean and Dirty Lube Oil Tanks are located

,-- side by side with the clean tank overflowing into the dirty lube oil tank. 2T-26 is located in the north-(-) west corner of the Unit 2 turbine brilding basement and has a total capacity of 32,000 gallons.

B. Tank 2T-26 is contained in a room equipped with a fire-proof watertight door and an OWS drain that connects to the Unit 2 turbine building sump.

7.9 Turbine Generator Lube Oil System Unit 1 and Unit 2 7.9.1 If any leaks or ruptures in the turbine generator lube oil systems occur, it will be contained in one side of the Unit 1 or Unit 2 turbine building basement by a containment wall which runs the full length of each basement. The oil shall then be disposed of using applicable means.

m v

h

-___l

. ,1

. PtANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN OIL SPILL PREVENTION CONTROL prncrnimr e enmnrowwimr nr m , o n , o r, PAGE 39 nr 99 n ARKANSAS NUCLEAR ONE ar-a , oAre ny' n m

/ CHANGE DATE l

I 7.10 Transformer Oil l 7.10.1 The ANO Unit 1 transformer yard has four main transformers l with a capacity of 8490 gallons each, two startup trans- i formers with a capacity of 7994 gallons each, and an auxi- I liary transformer holding 7994 gallons. The accumulative capacity for Unit 1 is 57942 gallons of transformer oil.

The ANO Unit 2 transformer yard has three main transformers with a capacity of 14000 gallons each, one startup trans-former with a capacity of 5600 gallons and an auxiliary transformer with a capacity of 5600 gallons of transformer oil. The accumulative capacity of transformer oil for Unit 2 is 53,500 gallons. Both Transformer yards are unattended but are within the plant security system (fence and TV surveillance).

7.10.2 Any major loss of insulating oil in the equipment would cause a transformer failure. A failure will immediately cause an alarm in its respective control room. Each trans-former is surrounded by a concrete containment which has the capability of holding all the oil in the transformer.

All oil spillage would be routed to the main oil and water separator via drains within the containment. The OWS main p)

(" sump is inspected after any major oil spill and, if required, the level will be lowered using applicable methods.

7.11 Unit 2 I'lant Heating Boiler Day Tank 2T-22 7.11.1 The Plant Heating Boiler Day Tank is located at ground level Elv. 354 in a room equipped with a dike and a floor drain connected to the oil water system drains. The capacity of 2T-22 is 1936 gallons.

! 7.11.2 In case of a tank rupture the oil will be contained in the I turbine building sump and processed by appropriate means.

I j

7.12 Waste Oil Storage Tank T-114 7.12.1 The Waste Oil Tank receives dirty oil from the oil water separation unit at ANO. The tank capacity is approximately 3000 gallons.

7.12.2 Tank T-114 is located outside near the oil water separator and is contained within a containment dike equipped with drains. In case of a tank rapture the oil would be returned to the oil water separator sump.

I 7.13 Security Diesel Generator Day Tank (v I 7.13.1 The Security Diesel Generator Day Tank is a Simplex Packaged Day Tank System. It is automatically filled by a 1/3HP mo-tor from T-28 and has a capacity of 25 gallons.

1

. PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN OIL SPILL PREVENTION CONTROL , e nnnernene e nr.u inn,

. s v w *e u v s m u enrumen.ur. i nunn uvwiau s a.a. a v v a s t. A A

  • a* i a svs . - -

O ARKANSAS NUCLEAR ONE aEv=oN : e n,,,,m,

( ,/ CHANGE " DATE 7.13.2 The Security Diesel is located approximately ten feet north of the Administration Building at ground elevation. The Day Tank is located at the west end of the Diesel Generator.

[ 7.13.3 The operation of the Security Diesel Day Tank pump is veri-fied weekly per Surveillance procedure 1305.10.

7.13.4 The Day Tank level is checked, via use of the gage mounted on the Simplex Diesel Day Tank panel, weekly per Surveil-lance procedure 1305.10.

7.14 ANO Incinerator Diesel Tank 7.14.1 This tank is filled by truck and the fuel is used only for the incinerator. The tank has a capacity of 1,000 gallons.

7.14.2 It is located at the northeast corner of the incinerator building and is surrounded by an earthern dike.

7.15 ANO Gasoline Tanks 7.15.1 These three tanks are used to fuel AP&L plant vehicles.

g'~s Each tank has a capacity of 1,000 gallons. The tanks

( ,) contain diesel, unleaded gasoline and regular gasoline.

7.15.2 These tanks are located approximately 200 feet north of the ANO maintenance facility. Each tank is surrounded by in-dividual earthern dikes.

7.16 Bechtel Gasoline Tanks i 7.16.1 These three tanks contain gasoline and diesel for use in Bechtel vehicles and are filled by truck. Each of these tanks has a capacity of approximately 1,000 gallons.

7.16.2 The Bechtel gasoline tanks are located approximately 150 feet north of the ANO maintenance facility inside the security area. The tanks are surrounded by an earthern dike.

8.0 FACILITY DRAINAGE AND TREATMENT FACILITIES l 8.1 Drainage from the earth dike around T-25 is controlled by a manually operated gate. This valve is kept closed at all times except when rainwater is drained from the containment.

b o

m.

l

. j

. l l- PLANT MANUAL SECTION: PROCEDUP.E/ WORK PLAN TITLE: NO:

EMERGENCY PLAN OIL SPILL PREVENTION CONTROL PROCFDURE & COUNTERMFA9URF PLAN 1903.24 1 PAGE 14 of 22 i O

\ ,/

s ARKANSAS NUCLEAR ONE amme, CHANGE 2 DATE DATE 02eous2 8.2 Drainage from Unit 1 and Unit 2 turbine building sumps and drainage from the maintenance facility floor drains are processed through the oil water separator unit. The oil water separator is equipped with an oil skimmer unit and a dissolved air flotation unit. Oil from the oil water separation facility is collected and stored in a waste oil tank and disposed of by applicable means.

8.3 Plant drains located on the plant grounds discharge into the plant discharge and intake canals. Potential oil spill locations are situated such that any oil spill could be diverted from these drains by dikes, ditches or ground landscaping.

9.0 INSPECTIONS AND RECORDS 9.1 The fuel oil and lube oil tanks are inspected for leaks and levels recorded once per shift and are periodically inspected per OP 1305.08, (Fuel Oil, Lube Oil Tank Integrity Check". Findings of this proce-dure are reviewed by the Operations Superintendent. Records of the Tank Integrity Check are maintained in the permanent plant records system.

10.0 SECURITY fs

( ) 10.1 Access into the plant area is controlled through gates by guards 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day. Plant oil storage facilities are within the ANO security system. Outside areas are fenced, well lighted and under TV surveillance. Admittance to tank areas outside the main plant buildings is limited and is under supervisory control.

11.0 PERSONNEL TRAINING 11.1 Personnel are provided training and must be familiar with the equip-ment and procedures used before they are authorized to perform work pertaining to oil handling, 11.2 Training sessions shall be held annually for the Oil Spill Response Team. Training shall consist of classroom training and " hands-on" training which involves use of the oil spill clean up equipment.

11.3 This. procedure shall be discussed with Operations and Haintenance personnel annually.

A b

,, l PROCEDURE / WORK PLAN TITtE: NO:

- PLANT MANUAL SECTION:

EMERGENCY PLAN OIL SPILL PREVENTION CONTROL inA, or P c UT 0Ymp nT t t? g us . .

D D, v, Am ruf*uDs.

Y T. s u m P vvvA f M. . T*D.

u u au* 4.u v a su a u. u ,

(  : uTc i ARKANSAS NUCLEAR ONE aevi=N CHANGE " DATE 12.0 f.TTACIR1ENTS AND FORMS 12.1 Attachment 1, " Procedure for Use Of Special Equipment For Removal Of Oil From Surface Of Water" -

12.2 Attachment 2, " Oil Spill Response Team Organization And Respcasibili-ties" 12.3 Attachment 3, " Criteria For Notifying Company Officials And Govern-ment Agencies" 12.4 Attachment 4, " Site Plan" (Location of Fuel Oil Storage Tanks) 12.5 Form 1903.24A, " Report Of Spill" 12.6 Form 1903.24B, " Notification Record" O

U O

. . 4 PROCEDURE / WORK PLAN TITLE:

NO:

- PLANT MANUALSECTION:

OIL SPILL PREVENTION CONTROL l EMERGENCY PLAN 10n? O /, I t DT4M DD n_ e_ r. _ n_ _ U_D P F_ A_ U_V_ T_ U_DMP A C. f ?D. P as== 7 oarm n, ,n , ,n i O)

(_,

ARKANSAS NUCLEAR ONE CHANGE ' DATE

" ' ~ ~

Page 1 of 2 ATTACHMENT 1 Procedure for Use of Special Equipment .

for Removal of Oil from Surface of Water 1.0 IMMEDIATE ACTION 1.1 The first objective should be to deploy the floating oil boom to form a barrier and canfine the oil to as small an area as possible.

1.2 Locate the trailer near the water so that the oil boom can be pulled from the back of the trailer and directly into the water without dragging boom across the ground, if possible.

1.3 Lower the tailgate of the trailer and fasten one of the nylon tow bridles to the end of the boom.

1.4 Pull the boom from the trailer with a boat. Locate the boom in the water so that both ends can be tied to suitable restraints leaving the boom where it will confine oil to an area and facilitate removing

(}

x_ ,/ oil from the water.

2.0 SUBSEQUENT ACTION 2.1 After oil is confined with the boom, the next step is to remove oil from the surface of the water.

2.2 If oil is >1/2 inch deep, the skimmer pump can be used to pump oil into barrels or other suitable containers as follows:

2.2.1 Locate the skimmer pump close to the water containing oil and rig up suction and discharge hoses. There are seven 10-foot long sections of 3-inch diameter suction hoses containing yellow floats and two 25-foot long sections of 3-inch diameter discharge hoses without floats.

2.2.2 Couple the five foot diameter semi-circular skimmer head to the free end of the suction hose and shove the suction hose into the water locating the skimmer head in the largest concentration of oil possible. A floating bridge assembly is provided on the trailer and should be used to lift and suspend the suction hose over the boom if it is necessary that the suction hose cross the boom.

2.2.3 Rig the free end of the discharge hose so that oil will be

~

discharged into barrels or other suitable container.

(v) Start the skimmer pump and begin pumping.

2.2.4

PLANT MANUAL SECTlON: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN OIL SPILL PREVENTION CONTROL PRorrDMRF & rnitMTFRMFA9MpF pt AM 100,.74 PAGE 17 nf pp n

V ARKANSAS NUCLEAR ONE aavisiON CHANGE

, oats DATE n,inien, Page 2 of 2 2.2.5 The original boom can be repositioned with the boat causing the oil to be moved to the skimmer hcad or a second section of boom can be deployed inside the original boom and used for this purpose.

2.2.6 Continue pumping until oil is less than \ inch deep. Then use oil absorbing material for further cleanup.

2.3 If oil is <1/2 inch deep, oil absorbing material should be used to absorb and " mop up" oil. Oil absorbing materials are available either on the trailer or in the storeroom; these materials and thtir use are described as follows:

2.3.1 Sacks of granulated sorbent are located on the trailer.

This material will absorb 9 to 15 gallons of oil per bag and floats indefinitely even when saturated with oil. This material can be removed from the water with the skimmer pump.

2.3.2 3M type 100 sorbent located in the storeroom. This material

/"'g is in rolls 3 feet x 150 feet long. It will absorb 13 to 25

! ) times its weight in oil and will not sink. It is recom-mended for use in open areas on smaller spills. It is used by spreading it on the surface of the water or on the shore-line. It is retrieved with hay forks, shovels, or other long-handled tools.

2.3.3 3M type 126 sweeps located in the storeroom. This item is made from the same material described in 2.3.2 above.

It is 22 inches x 100 feet long and contains a durable l

I rope to provide strength. It is used by extending between two boats and sweeping the surface of the water. Recom-mended for removing rainbow sheens and other thin slicks.

2.3.4 3M type 156 sheets located in the storeroom. This item I

is made fren the same material described in 2.3.2 above.

l It is made in la" x 18" squares and is recommended for small spills in congested areas, challow water and rocky shorelines. These sheets can be " wrung out" and reused.

2.4 The washdown pump can be used to " herd" oil around on the surface of I the water, wash the shoreline and clean up equipment. The pump should be placed in the water before starting or shaft damage will result.

(")

V

NO-PLANT M ANUALGECTION: PROCEDUREE40RK PLAN TliLE:

EMERGF.NCY PLAN OIL SPILL PREVENTION CONTROL t e enipnenue wime or m inna u r noncentme PAGE in nr 99 b

"" ARKANSAS NUCLEAR ONE aavision CHANGE i DaT E DATE n,ini re, Page 1 of 1 ATTACHMENT 2 Oil Spill Response Team .

Organization and Responsibilities The purpose of the ANO Oil Spill Response Team is to minimize the consequences of an oil spill upon the environment of Lake Dardanelle. The Oil Spill Response Team shall be activated per Section 4.4.3 of this procedure. Upon acti ation the team shall initiate action as described in Section 4.2 and Attachaent 1 of this procedure. The Oil Spill Team leader shall be responsible for coor-dinating oil containment and clean up activities and reporting to the Technical Analysis Superintendent.

Call List For Oil Spill Response Team NAffE PHONE Team Leader Charles Adams Alternate Team Leader Dennis Calloway

  • Members Gary Lipham ,

i Tom Blakenship

  • Clyde Butts Larry Greathouse Al Morgan Steve DeYoung i

Sid Hawkins Mike Hall Phillip Rye Wayne Williams TIIE MATERIAL CONTAINED WITHIN THE SYMBOLS (*) IS PROPRIETARY OR PRIVATE INFORMATION.

  • - q

. PLANT M ANUAt SECTION: F ROCEDURE/ WORK PLAN TITLE: NO:

EMERGENCY PLAN OIL SPILL PREVENTION CONTROL e cnn. vm. re r.e.s.enn.e nr i,v ,nn, n r.

n o n. c r. n e u. r

- -- - u uur s us ,-.

ARKANSAS NUCLEAR ONE aevisioN ; oAre-- me,m,,e, (o) CHANGE " DATE Page 1 of 1 l ATTACHMENT 3 Criteria for Notifying Company Officials .

and Government Agencies 40CFR110.9 reads in part: "Any person in charge of any. . . facility shall, as soon as he has knowledge of any discharge of oil from such... facility...,

immediately notify the U.S. Coast Guard of such discharge...". The U.S.

Coast Guard National Response Center (USCGNRC) was contacted on 8/3/77 to inquire about specific criteria for notifying USCGNRC of an oil spill. It was determined that USCGNRC desires to be notified of oil entering Lake Dardanelle resulting from an occurance at ANO.

Section 1 of the attached oil spill report form should be completed prior to making notifications. Section 1 shall be filled out by ANO personnel cogni-zant of the conditions of the oil spill.

The General Manager or his designee shall make the following notifications:

The USCGNRC shall be notified first (Notification of USCGNRC fulfills all

-~ federal law for notification of an oil spill. In the event the National 3

Response Center can not be reached, individual federal agencies must be noti-

'~ ') fied.); the Arkansas Department of Pollution Control and Ecology shall be notified second; then notify Energy Supply Technical Analysia.

The attached oil spill report form and notification record forms shall be filled out completely and retained for the purpose of evaluating the oil spill event.

A written report in memorandum form shall be made to the Manager of Energy Supply Technical Analysis for proper distribution to various agencies as required. The report shall include a general description of the event, how the spill occurred, counter measures taken to prevent a re-occurrance of the spill and copies of the oil spill report forms and notification records filled out at the time of the spill.

O) t v

WM

rr s

l 1

1

- PLANT MANUAL SECTION: PROCEDURElWORK PLAN TITLE: ,

NO: j EMERGENCY PLAN OIL SPILL PREVENTION CONTROL i pporrmmr e enim TrpMragim r PT tv inn 7 95 t

PAGE on nf oo .

ARKANSAS NUCLEAR ONE aEvisioN CHANGE 3

oArE DATE nun 1 m j

ATTACIRIENT 4 g u

( -

  • r ,

I I

i l ,

6-- y LJ, l:  :

bi .

de

!,i I I'l l!

, ((:l.i9 l

lHi __-_-_:  ; . li e 3 __

Nl H, - l.

i l! i 1

y. . . . .

7

+ 1 l f N. f l i d .t ti,g :i i t i

<3

"[

i, li 1i

,'4

/(,/

1 q; Pg']

l1 f; ri

+1,lc.

m _

1 4

_s t ev H ,

l \

l 7 a , = = =

t a .

ca-a<w

..:F.7- .,:b<r &'g/v ,

/

s r:

C:::=

c ye s

1

!!!I i u dro r, U U_b . ( )

gj ,

j kI '~'? E ,\ ~ . ,

=

.r 4

m.a . .,4 5  ! v!.,;,.,.+-------_-4 g );p--,, .y,J :) "- %

, h../T'T"~T

r i
  • 3'  ;

'* 'i ~ 1 -_._d h { ((':,q4: ifT N 1, p a

- u.1 ,;%Lt M @(a n.g;.;i iD M . ,

3 'e

% sln o

s ll > f ,F-i q. c!I Gi .T. ' 9 S ,

' s f) -

v M{-sign $y - -=1

. 9 n,

% 'N u

l =--

] \ j,

r. \.N s

. ~ /

\ il I  !

1 l

,\ e

,Y .. 9 % , ([ .. <, - .

/. /,I ,

8 lri G II y 7 '

\' j! " ' . , '
? '

i , , m-

, 'I y i s II 3 hC w I L u. L . _ - km

~ -

ml 1 j

PLANT MANUAL SECTION: PROCEDURElWORK PLAN TITLE: NO: 1 1

EMERGENCY PLAN OIL SPILL PREVENTION CONTROL P"0CEDLTs: & COU' TE"J1EASLTsE I'L.U:

PAGE ,, _ , . , , , ,

MO:.^' ,_.

ARKANSAS NUCLEAR ONE  : DATr-O aavisiON CHANGE " DATE

-,,m,,e,

)

i ARKANSAS POWER & LIGHT COMPANY  ;

Arkansas Nuclear One i N . ,. -- --...

f FORM NO.  ;

-1 REV. y 4 PC # ~ ~ j i

I REPORT OF OIL SPILL DATE/ TIME OF NOTIFICATION /

I. Description of Spill A. Spill Date: Time:

B. General Weather Conditions:

Temperature 'E Wind Speed miles /hr & / _ / gusty or / / steady i i

Wind Direction (direction wind is from) "

Lake Surface Condition (rippling, choppy, whitecapping)

C. Location of Spill (intake canal, discharge canal, etc. ) j 1

i D. Movement of spilled material:

l E. Material Spilled (#2 Diesel oil, turbine lube oil, etc.)

F. Quantity Spilled (gallons, barrels, etc.)

G. Source of Spill (barge, truck, oil cooler leak, etc..)

H. Operation in Progress (unloading oil, transterring oil, etc.)

I. Corrective Action taken:

C9 J. hme of Personnel t h-it discovereti spall:

K. Name of Personnel to rent.nct at scene et spill:

enc i

e

  • PLANT MANUAL.SECTION: PROCEDUREAVORK PLAN TliLE: NO:

Ef!ERGENCY PLAN OIL SPILL PREVENTIO!I C0!ITROL PRorFet!RF & COUMTFR?fc AC'fRF PTAM 1903.24 PAGE pp of 22

=

ARKANSAS NUCLEAR ONE aEviSion , DATE 03/01es, CHANGE DATE ARKANSAS POWER & LIGHT COMPANY r Arkansas Nuclear One N NOTIFIC\ TION 7ECORD l F0" "O' 1401. 2 '.R REV. 1 J PC #

DATE/ TIME AGENCY PERSON CONTACTED / HONE CONTACTED USCG National Response Center *

  • State Dept. Pollution Control

& Ecology APSL ES Technical Analysis

  • Dale L. Swindico Otfice *
  • Home *.
  • Edward L. Green
  • Office *
  • Home *
  • AP&L ES Technical Analysis *Firdina C. Hyman* Office *  ?

Home *.

  • i AP&L ES Technical Analysis *Sharon R. Tilley* Office *
  • Home *
  • For infornntion purposes, the following numbers are provided:

U.S. Coast Guard (Memphis) * ~*

24-Hour Emergency EPA, Dallas - *

  • 24-Hour Emergency

-d Corps of Engineers *

  • Other Acencies Notified:

DATE/ TIME AGENCY PERSON CONTACTED PHONE CON TAC TED E.C Person Making Notification:

C. _ .