JOSEPH M. FARLEY NUCLCAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS MARCH, 1983 The Unit experienced no shutdowns or significant power reductions during the month of March.

The following safety-related maintenance was performed in the month of March.

1.

Performed miscellaneous maintenance on diesel generators.

2.

Installed new bearings and seal in Reactor Makeup Water pump 1A.

3.

Repacked #6 and #7 River Water pumps.

4.

Overhauled #2 River Water pump.

8304190294 830413 PDR ADOCK 05000364 PDR R

OPERATING DATA REPORT DOCKET NO. 50-164 DATE 4/04/83 COMPLETED BY W.C. Unfrston, III TELEPHONE (9nn noo-5156 OPERATING STATUS N0f'5

1. Unit Name:

Tonenh M. Fnriev - Unie ?

2. Reporting Period: March. 1983
1) C'umulative data since
3. LicensedThermalPower(MWtp:

2652 7/30/81, date of 860

4. Nameplate Rating (Gross MWe):

commercial operation.

829 S. Design Electrical Rating (Net MWe):

l

6. Maximum Dependable Capacity (Gross MWe):

u,

7. Maximum Dependable Capacity (Net MWe):

R1' 7

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted,if Any (Net MWe):

N/A

10. Reasons For Restrictions,if Any:

N/A "lliis Month Yr..to.Dete Cumulative 744 2160 14.641

11. Hours in Reporting Period 2160 12.944.5
12. Number Of Hours Reactor Was Critical 7AA
13. Reactor Reserve Shntdown Hours o

n 138.4

14. Hours Generator On.Line 744 2160 12,7 R
15. Unit Reserve Shutdown Hours 0

0 o

16. Gross Thermal Energy Generated (MWH) 1,969,863 5,715,768 31.137.582 629,722 1.831.374 10.504.608 i.
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH) 944 6An 1,744,006 9,960,056 87.2
19. Unit Service Factor 100.0 3nn n
20. Unit Availability Factor 100.0 inn n a7.9 99.0 99.7 81.6
21. Unit Capacity Factor (Uning MDC Net) 97.2 97.4 82 1
22. Unit Capacity Factor (Using DER Net) 0.0 6.4
23. Unit Forced Outage Rate nn
24. Shutdowns Scheduled Over Next 6 Months (Type, Date,and Duration of Each t:

Refueline otirnoe t Re n tamh e r. 1981

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A 26; Units in Test Status (Prior to Commercial Operation):

Forecast Achieved I

INITIAL CRITICALITY 5/06/81 5/08/81 INITIAL ELECTRICITY 5/24/81 5/25/81

,/01/81 7 /an /R1 8

COMMERCIAL OPERATION (4/77)

~

DOCKIT.'iO.

Ka

A 2

UNIT DATT. 4/04/83 COMPLET7.D BY W G.11airston, III TELEPHONE (205) 899-5156 310tfT11

""?

DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (blue ties)

(Mhe Net) 806 g7 811 g,

'2 AnA la nno 804 g9 805 3

803 4

73 79g 786 810 3

21 810 6

800 n

801 811 7

3 g

807 24 811 809 9

R10 23 799 813 26 10 II 812 27 794 805 12 3

yn.,

808 13 806 3

808 14 R1' 30 811 807 IS 3g 16 805 INSTRUCIiONS On this fonn:t. list the aver:ge daily unit power !cvelin MWe Net for ::ch c:y in the reparting inunth. Compute to

, the neare:t whole mes: watt.

(9(77)

=

me y

p y-wyw-----9 r

w,-

g

--4rw

  • .my---Mw r+ - - - -+-+---P y-
  • --t-M

+T-Y-y-

N

==-T-

'50-364

~

UNIT Silu'IDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAhlE J. M. Farley-Unit 2 DATE 4/04/83 MEPORT MONlli March COMPLETED BY - W.G.Hairston, III TELEPilONE (205) 899-5156 t u. 5 c

c r.

.2 E g

7 sX Licensee gv, E*.

Cause 1 Consective

- o No.

Date g

3g g

,c g 5 Event ts ?

E-3 Action to

$0 O

$3 Report #

pfCVent Recustence 6

There were no unit shutdowns or signj ficant power reductio 1 ts in t he month o March.

i 4

f 1

2 3

4 F: Forced Reason; hiethod:

Extiibit G Insieuctions i

S: Sclieduled A Equipment Failure (Explain) 1 -Manual for Psepasation of Data ll Maintenance of Test 2-Manual Scram.

Ent y Sheets fue Licensee C-Refueling 3 Autoinatic Scram.

Event Repost (1.ER) File (NUREG-i D.Regidalomy Restriction 4 Other (Explain) 0161)

E-Operator Training & license Examination F Administsalive 5

G Opesational Enor (lixplain) lhhibis I - Same Sousee 19/77) 11 Othes (Explain)

ip

' \\,

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS MARCH, 1983 The Unit experienced no shutdowns or significant power reductions during the month of March.

The follcwing safety-related maintenance was performed in the month of March.

1.

Performed miscellaneous maintenance on diesel generators.

2.

Installed new bearings and seal in Reactor Makeup Water pump 1A.

3.

Repacked #6 and #7 River Water pumps'.

4.

Overhauled #2 River Water pump.

k OPERATING DATA f(EPORT DOCKET NO. 50-164 DATE 4/04/83 COMPI.ETED BY W.C. Hairston, III TELEPHONE (9nn noo-5156 OPERATING STATUS 1

N

. Uait Name

Jonenh M-F^rlav Thi r ?

March. 1983

1) Cumulative data since
2. Reporting Period:

2652 7/30/81, date of

3. Licensed Thermal Power (MWr):

j 860 commercial operation.

4. Nameplate Rating (Gross MWe):

629

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

c5^ 7 R 1 't 7

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A N/A

9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions,If Any:

N/A This Month Yr to.Date Cumulative 744 2160 14.641

11. Hours In Reporting Period 2160 12.944.5
12. Number Of Hours Reactor Was Critical 7^^

138.4

- 13. Reactor Reserve Shutdown Hours o

n

14. Hours Generator On.Line 744 2160 12,762.4 0

0 0

15. Unit Reserve Shutdown Hours 1,969,863 5,715,768 31.137.582
16. Gross Thermal Energy Generated (MWH) 629,722 1.831.374 10.504.608
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH) 500.Aln 1,744,006 9,960,056 87.2 100.0 inn n
19. Unit Service Factor 100.0 inn n R7.9
20. Unit Availability Factor 99.0 99.?

81.6

21. Unit Capacity Factor (Using MDC Net) 97.2 97.4 82.1
22. Unit Capacity Factor (Using DER Net) 0.0 6.4 nn
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Nest 6 Months (Type. Date,and Duration of Each):

Refuelino nuenne! Sentamher. 19R1 N/A

25. If Shut Down At End Of Report Period Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation).-

Forecast Achieved 5/06/81 5/08/81

- lNITIAL CRITICALITY 5/24/81 5/25/81 INITIAL ELECTRICITY

,/01/81 7ftn/n1 8

COMMERCIAL OPERATION (9/77)

~

DOC)3Y NO.

(n 'ta A

~'

UNIT 2

e DATE 4/04/83 I

W.G. Hairston, III COMPLETED SY TELEPHONE (205) 899-5156 March 410tml DAY AVERACE DAILY FOWER LEVEL DAY AVERACE DAILY POWER LEVEL talWe Net)

(Atwe. Net) 806 17 811 I.

2 Ann gg ano 3

19 805 80 4 4

20 798 810 786 21 5

810 6

800 r.

801 811 7

3 3

807 24 811 809 9

RIO 3

799 813 26 10 I

11 812' n

794 805 12 on.,

808 1;.

806

3 808 14 R 1 't 30 811 807 IS 33 16 805 l

(tl57RUCDON5 1

On this formst. list the. svenge daily unit power Icvel in MWe. Net for each i:y in the reporting inunth. Compute to

, the neare:t whole rne;swatt.

l l

(907) i l

e

'50-364 UNIT 51101 DOWNS AND POWER REIMJC110NS DOCKET NO.

~

UNIT NAME __ J. M. Farley-Uni 2 DATE 4/04/83 REPORT MON 111 March COMPLETEI) BY W.G.Hairston, III TELEPilONE (205) 899-5156 f

We E

E jg

}

Y5 Lken>ee Eg h

Cause & Conective No.

Date R

5g os5 Event g

gu Action to 3

H yE jgg Repor: #

mU Psocne Recussence 5

g There were no unit shut :fowns or signj ficant power reductious in t he month o f March.

I 2

3 4

F: Fosted Reason:

Method:

Exhibit G Insieuctions S: Scheduled A-Equipment Failure (Explain) 1 -Manual for Pseparation of Data ll Maintenance of Test 2 Manual Scram.

Ent y Sheets for Licensee C Refochng 3 Automatic Scram.

lisent Repini (1.ERI Fi!c (NUREG-D-Regulatoiy Resintaion 4 Osher (Explaisi) 0161)

E Opesator Training & license Examination F-Admimsisative 5

G Opesational Enor (lixplain) thhibii 1 - Same Somce (9/77) ll Othes (Explain)

...