JOSEPH M. FARLEY NUCLCAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS MARCH, 1983 The Unit experienced no shutdowns or significant power reductions during the month of March.
The following safety-related maintenance was performed in the month of March.
1.
Performed miscellaneous maintenance on diesel generators.
2.
Installed new bearings and seal in Reactor Makeup Water pump 1A.
3.
Repacked #6 and #7 River Water pumps.
4.
Overhauled #2 River Water pump.
8304190294 830413 PDR ADOCK 05000364 PDR R
OPERATING DATA REPORT DOCKET NO. 50-164 DATE 4/04/83 COMPLETED BY W.C. Unfrston, III TELEPHONE (9nn noo-5156 OPERATING STATUS N0f'5
- 1. Unit Name:
Tonenh M. Fnriev - Unie ?
- 2. Reporting Period: March. 1983
- 1) C'umulative data since
- 3. LicensedThermalPower(MWtp:
2652 7/30/81, date of 860
- 4. Nameplate Rating (Gross MWe):
commercial operation.
829 S. Design Electrical Rating (Net MWe):
l
- 6. Maximum Dependable Capacity (Gross MWe):
u,
- 7. Maximum Dependable Capacity (Net MWe):
R1' 7
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted,if Any (Net MWe):
N/A
- 10. Reasons For Restrictions,if Any:
N/A "lliis Month Yr..to.Dete Cumulative 744 2160 14.641
- 11. Hours in Reporting Period 2160 12.944.5
- 12. Number Of Hours Reactor Was Critical 7AA
- 13. Reactor Reserve Shntdown Hours o
n 138.4
- 14. Hours Generator On.Line 744 2160 12,7 R
- 15. Unit Reserve Shutdown Hours 0
0 o
- 16. Gross Thermal Energy Generated (MWH) 1,969,863 5,715,768 31.137.582 629,722 1.831.374 10.504.608 i.
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH) 944 6An 1,744,006 9,960,056 87.2
- 19. Unit Service Factor 100.0 3nn n
- 20. Unit Availability Factor 100.0 inn n a7.9 99.0 99.7 81.6
- 21. Unit Capacity Factor (Uning MDC Net) 97.2 97.4 82 1
- 22. Unit Capacity Factor (Using DER Net) 0.0 6.4
- 23. Unit Forced Outage Rate nn
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date,and Duration of Each t:
Refueline otirnoe t Re n tamh e r. 1981
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A 26; Units in Test Status (Prior to Commercial Operation):
Forecast Achieved I
INITIAL CRITICALITY 5/06/81 5/08/81 INITIAL ELECTRICITY 5/24/81 5/25/81
,/01/81 7 /an /R1 8
COMMERCIAL OPERATION (4/77)
~
DOCKIT.'iO.
Ka
A 2
UNIT DATT. 4/04/83 COMPLET7.D BY W G.11airston, III TELEPHONE (205) 899-5156 310tfT11
""?
DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (blue ties)
(Mhe Net) 806 g7 811 g,
'2 AnA la nno 804 g9 805 3
803 4
73 79g 786 810 3
21 810 6
800 n
801 811 7
3 g
807 24 811 809 9
R10 23 799 813 26 10 II 812 27 794 805 12 3
yn.,
808 13 806 3
808 14 R1' 30 811 807 IS 3g 16 805 INSTRUCIiONS On this fonn:t. list the aver:ge daily unit power !cvelin MWe Net for ::ch c:y in the reparting inunth. Compute to
, the neare:t whole mes: watt.
(9(77)
=
me y
p y-wyw-----9 r
w,-
g
--4rw
- .my---Mw r+ - - - -+-+---P y-
- --t-M
+T-Y-y-
N
==-T-
'50-364
~
UNIT Silu'IDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAhlE J. M. Farley-Unit 2 DATE 4/04/83 MEPORT MONlli March COMPLETED BY - W.G.Hairston, III TELEPilONE (205) 899-5156 t u. 5 c
c r.
.2 E g
7 sX Licensee gv, E*.
Cause 1 Consective
- o No.
Date g
3g g
,c g 5 Event ts ?
E-3 Action to
$0 O
$3 Report #
pfCVent Recustence 6
There were no unit shutdowns or signj ficant power reductio 1 ts in t he month o March.
i 4
f 1
2 3
4 F: Forced Reason; hiethod:
Extiibit G Insieuctions i
S: Sclieduled A Equipment Failure (Explain) 1 -Manual for Psepasation of Data ll Maintenance of Test 2-Manual Scram.
Ent y Sheets fue Licensee C-Refueling 3 Autoinatic Scram.
Event Repost (1.ER) File (NUREG-i D.Regidalomy Restriction 4 Other (Explain) 0161)
E-Operator Training & license Examination F Administsalive 5
G Opesational Enor (lixplain) lhhibis I - Same Sousee 19/77) 11 Othes (Explain)
ip
' \\,
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS MARCH, 1983 The Unit experienced no shutdowns or significant power reductions during the month of March.
The follcwing safety-related maintenance was performed in the month of March.
1.
Performed miscellaneous maintenance on diesel generators.
2.
Installed new bearings and seal in Reactor Makeup Water pump 1A.
3.
Repacked #6 and #7 River Water pumps'.
4.
Overhauled #2 River Water pump.
k OPERATING DATA f(EPORT DOCKET NO. 50-164 DATE 4/04/83 COMPI.ETED BY W.C. Hairston, III TELEPHONE (9nn noo-5156 OPERATING STATUS 1
N
- . Uait Name
Jonenh M-F^rlav Thi r ?
March. 1983
- 1) Cumulative data since
- 2. Reporting Period:
2652 7/30/81, date of
- 3. Licensed Thermal Power (MWr):
j 860 commercial operation.
- 4. Nameplate Rating (Gross MWe):
629
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
c5^ 7 R 1 't 7
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A N/A
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions,If Any:
N/A This Month Yr to.Date Cumulative 744 2160 14.641
- 11. Hours In Reporting Period 2160 12.944.5
- 12. Number Of Hours Reactor Was Critical 7^^
138.4
- 13. Reactor Reserve Shutdown Hours o
n
- 14. Hours Generator On.Line 744 2160 12,762.4 0
0 0
- 15. Unit Reserve Shutdown Hours 1,969,863 5,715,768 31.137.582
- 16. Gross Thermal Energy Generated (MWH) 629,722 1.831.374 10.504.608
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH) 500.Aln 1,744,006 9,960,056 87.2 100.0 inn n
- 19. Unit Service Factor 100.0 inn n R7.9
- 20. Unit Availability Factor 99.0 99.?
81.6
- 21. Unit Capacity Factor (Using MDC Net) 97.2 97.4 82.1
- 22. Unit Capacity Factor (Using DER Net) 0.0 6.4 nn
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Nest 6 Months (Type. Date,and Duration of Each):
Refuelino nuenne! Sentamher. 19R1 N/A
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation).-
Forecast Achieved 5/06/81 5/08/81
- lNITIAL CRITICALITY 5/24/81 5/25/81 INITIAL ELECTRICITY
,/01/81 7ftn/n1 8
COMMERCIAL OPERATION (9/77)
~
DOC)3Y NO.
(n 'ta A
~'
UNIT 2
e DATE 4/04/83 I
W.G. Hairston, III COMPLETED SY TELEPHONE (205) 899-5156 March 410tml DAY AVERACE DAILY FOWER LEVEL DAY AVERACE DAILY POWER LEVEL talWe Net)
(Atwe. Net) 806 17 811 I.
2 Ann gg ano 3
19 805 80 4 4
20 798 810 786 21 5
810 6
800 r.
801 811 7
3 3
807 24 811 809 9
RIO 3
799 813 26 10 I
11 812' n
794 805 12 on.,
808 1;.
806
- 3 808 14 R 1 't 30 811 807 IS 33 16 805 l
(tl57RUCDON5 1
On this formst. list the. svenge daily unit power Icvel in MWe. Net for each i:y in the reporting inunth. Compute to
, the neare:t whole rne;swatt.
l l
(907) i l
e
'50-364 UNIT 51101 DOWNS AND POWER REIMJC110NS DOCKET NO.
~
UNIT NAME __ J. M. Farley-Uni 2 DATE 4/04/83 REPORT MON 111 March COMPLETEI) BY W.G.Hairston, III TELEPilONE (205) 899-5156 f
We E
E jg
}
Y5 Lken>ee Eg h
Cause & Conective No.
Date R
5g os5 Event g
gu Action to 3
H yE jgg Repor: #
mU Psocne Recussence 5
g There were no unit shut :fowns or signj ficant power reductious in t he month o f March.
I 2
3 4
F: Fosted Reason:
Method:
Exhibit G Insieuctions S: Scheduled A-Equipment Failure (Explain) 1 -Manual for Pseparation of Data ll Maintenance of Test 2 Manual Scram.
Ent y Sheets for Licensee C Refochng 3 Automatic Scram.
lisent Repini (1.ERI Fi!c (NUREG-D-Regulatoiy Resintaion 4 Osher (Explaisi) 0161)
E Opesator Training & license Examination F-Admimsisative 5
G Opesational Enor (lixplain) thhibii 1 - Same Somce (9/77) ll Othes (Explain)
...