ML20073J395

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Mar 1983
ML20073J395
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/13/1983
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML20073J398 List:
References
NUDOCS 8304190282
Download: ML20073J395 (1)


Text

McNeg Address Alabama Power Com:r.ny 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

5%$**O'Tff"'

AlabamaPbwer the Solktern electrC SyStern April 13, 1983 Docket No. 50-364 Director, Of fice o f Management In formation and Program Control U. S. Nuclear RegJlatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the March, 1983 Monthly Operating Report for Joseph M.

Farley Nuclear Plant, Unit 2, requi red by Section 6.9.1.10 o f the Unit 2 Techr.ical Speci fi-cations.

As requested by letter from Mr. John F.

Stolz to Mr. Alan R.

Barton, dated October 21,
1977, a

" Narrative S umma ry of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very truly, F. L. Clayton, Jr.

FLCJr/KWM:nac Enclosures xc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Director, RII (1 copy)

}b 8304190282 830413 PDR ADOCK 05000364 R

PDR