Concludes That Pressurizer Surge Line & Associated Support/ Restraints for Facilities in Compliance W/Licensing Commitments & Evaluation Requirements Stated in Bulletin 88-11
ML20073H863
Person / Time
Site: Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 04/30/1991
From: Tuckman M
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-88-011, IEB-88-11, NUDOCS 9105070290
Download: ML20073H863 (2)


Text

ll l

4o tw nu re ncio, us n,m

' %n lent l'nntm tnte (1crt f ra hew!rnt l'() flat /W

%nleatfhveratwin ChaluHe \\ C Mul (W t intj C4-Jdl r

h DUKEPOWER April 30,1991 U. S. Nuclear Regulatory Commission ATrN: Document Control Desk

]

Washington, DC 20555

Subject:

_ Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50 413 and 50-414 McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50 369 and 50 370 NRC Bulletin 88-11 Pressurizer Surge Line Thermal Stratification E

In a letter dated December 19, 1990, Duke Power Company stated that it would make a j

full response to the NRC pursuant to the requirements of NRC Bulletin 8811 by May 1,

1991, Duke Power has concluded that the pressurizer surge line and associated support / restraints for McGuire and Catawba are in compliance with the licensing commitments and evaluation requirements stated in Bulletin 88-11, Duke Power has performed the plant specific analysis as described in the December 19, 1991 submittal which involved applying the work done on a generic basis by _ Westinghouse to the specifics of each of the four McGuire and Catawba units. This work confirms Westinghouse's conclusion that the surge lines meet all applicable ASME stress and fatigue -

limits by significant margins and shows that the forces and displacements at the

- support / restraints are within allowable limits, Westinghouse is still in the process of reviewing the pressurizer surge line nozzle and is committed to provide Duke Power with a draft of these results by June 6,1991._ Duke -

Power will provide the NRC with the results of the remaining pressurizer surge line nozzle

)@f 9 9.10507029o 9,10430-

~o m.

4 U. S. Nuclear Regulatory Commission April 30,1991 Page 2 analysis within 10 days of finalizing the Westinghouse draft.

All documentation for Bulletin 8811 will be in place by July 15, 1991.

Very truly yours, h, T.

W m

hi. S. Tuckman CRIJBUL8811 xc: