Amend 196 to License DPR-44,changing TS by Allowing Third Type a Cilrt in Second 10-yr Svc Period to Be Conducted During Refueling Outage 11 Scheduled for Sept 1996
ML20073H772
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 09/30/1994
From: Thadani M
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20073H776 List:
References
NUDOCS 9410060069
Download: ML20073H772 (4)


Text

. _ _ _ -.

(***%

a UNITED STATES 5'

NUCLEAR REGULATORY COMMISSION

$g * *...,/

wAssiwcrow, o.c. rosss-oooi PHILADELPHIA ELECTRIC COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.196 License No. DPR-44 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Philadelphia Electric Company, et al.

(the licensee) dated May 13, 1994, as supplemented by letter dated August 28, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, a's' amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I.

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health or safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-44 is hereby amendad to read as follows:

L K0 77 1

P PDR

. _. _ ~ -

e (2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.196, are hereby incorporated in the license.

PECO shall operate the facility in accordance with the l

Technical Specifications.

3.

This license amendment is effective as of its date of issuance.

4 FOR THE NUCLEAR REGULATORY COMMISSION t

i C_.

l Mohan C. Thadani, Acting Director l

Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation i

Attachment:

i Changes to the Technical Specifications Date of Issuance:

September 30, 1994

{

P t

i f

3 ATTACHMENT TO LICENSE AMENDMENT NO. 196 FACILITY OPERATING LICENSE NO. DPR-44 DOCKET NO. 50-277 Replace the following page of the Appendix A Technical Specifications with the enclosed page.

The revised areas are indicated by marginal lines.

Remove Insert 167 167

. Unit 2 i

PBAPS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7.A Primary Containment (Cont'd.)

4.7.A Primary Containment i

(Cont'd.)

i t

L,, = measured ILR at 25 psig (P) l t

L,, = measured ILR at 49.1 l

P s i g ( P,), and l

L*"

$ 0.7, otherwise L,,

l L,

= La (P,/P,)1/2 l

where La = 0.5 percent of the j

primary containment j

volume per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> i

at 49.1 psig j

peak accident pressure

{

P,

=

(psig) t appropriately measured P,

=

test pressures (psig)'

c. The ILRT's shall be performed at the following minimum j

frequency:

3 1.

Prior to initial unit operation.

2.

After the preoperational leakage rate tests, a set of three Type A i

tests shall be performed at approximately equal r

intervals during each 10 year service period.*

l These intervals may be i

extended up to eight months if necessary to coincide with re-i fueling outage.

d. The allowable leakage rates, L,and L shall be less tflan 0.7$*,L, and 0.75 L, for the reduced pressure i

tests and peak pressure l

tests, respectively.

j i

  • Except for third Type A test i

in the second 10 year service period,-which will be l

performed during the PBAPS, l

Unit 2 refueling outage 11 currently scheduled for September 1996.-

j t

-167-Amendment No. T H, 196 i