OPERATING DATA REPORT DOCKET NO.
50-369 I) ATE 4-15-83 CO.\\lPLETED BY J. A. Reavis TELEPil0NE 704-373-7567 OPERATING STATQ Note >
- NOTE: Nameplate Rating McGuire Unit 1
- l. Unit Name:
(Gross MWe) calculated as
- 2. Reporting reriod. March 1,1983-March 31,1983 l450.000 MVA x.90 power 34jj
- 3. Licensed Thenna' Power i>lWt):
factor per Page iii, 1305*
- 4. Nameplate Rating (Grow 31We):
1180
- 5. Design Electrical Rating INet.\\lw l:
e
- 6..\\latimum Dependable Capacity IGross.\\lWc);
1180
- 7. Maximum Dependable Capacity (Net,\\lWe);
S. If Changes Occur in Capacity Ratings titems Number 3 Through 7)Since Lasi Report.Gise Reasons:
None
- 9. Power Level To Which Restricted. lf Any (Net.\\lwe):
- 10. Reasons For Restrictions. If Any:
This.\\lonth Yr..t o.Da t e Cumulative 744.0 2 160.0
. 11 664.0
- 11. Ilours in Reporting Period 0.0 494.9 7 633.0
- 12. Number Of flours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
~
0.0 494.9 7 587.1
- 14. Hours Generatnr On-Line
- 15. Unit Resene Shutdown Hours 0
857 172 14 359 590
- 16. Gross Thermal Energy Generated (SIWH) 13 293 850 4 920 441
- 17. Gross Electrical Energy Generated (31WH) 264 102 4 585 425
-4 185-IS. Net Electrical Energy Generated plWH) 0.0 22.9 65.1 g9, gn;,3,,.y,c,73cio, 0.0 22.9 65.1
- 20. Unit Availability Factor 0.0 10.4 33.3
- 21. Unit Capacitv Factor (Using SIDC Net t 0.0 W.4 33.3
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.8 21.3
- 23. Unit Forced Outace Rate
- 24. Shutdowns Scheduled Oser Nest 6 \\lonths (Type. Date.and Duration of Each t:
None 1
May 1, 1983
- 25. If Shut Down At End Of Report l'crind. Estimated Date of Startup:
I
- 26. Units in Test Statu> (Pr.inc io Commercial Operation):
Forecast Achiesed INITI \\ L CRITICA LITY INI TI A l. LLLC l R ICI T Y Cost.sti.RCl \\ L Ol'LR A flON (9/77 )
8304180636 830415 PDR ADOCK 05000369 R
DOCKET NO. 50-369 UNIT McGuire 1 4-15-83 DATE AVERAGE D AILY UNIT POWER LEVEL MONTH Ma rch.1983 AVERAGE D AILY l'OWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY (MWe net) 1 17 2
18 3
19 20 4
5 21 6
22 7
23 8
24 9
25
~~
26 10 11 27 12 28 13 29 30 14 15 31 1S DAILY UNIT POWER LEVEL FOR\\1 INSTRUCTIONS On this fonn, list tin. averare daily unit power lesel in MWe net for each day in the reporting n.onth.
Compute to the nearest wnole megawatt.
These figures wdl I e used to plot a graph for cach reportint: month. Note that by usin[i maximum dependable capacity f or Ilie net electrical rating of the umt there may be. t easions when the daily average power leve: curetts the itJO i hoe (or the restthled power lesel huel, in such c.ises, the average dady unit power output sheet should be footnoted to t splain the app.uent anomaly.
.cy,m..--
..-m
.+
50-369 DOCKET NO UNIT SilUTDOWNS AND POWER ItEDUCTIONS Mct2uire 1 UNIT N AME 4-15-83
!) ATE March, 1983 COMPl.ETED Hy J. A. Reavis 1(EPORT MONTil TELEPflONE 704-373-7567 i
l
,5 g 3'
Y Licensee
[ t, Cause & Corrective o
j No.
Date 3,
3g j
j s 5-Even 3,y 91 Action to l
H y5 ei!
y gy, g Report a mO 5O Prevent Itecurrence U
e s
j o
i i
1 lA 83-03-01 S
192.00 H
CB Htexch Outage continues for modification of steam generator.
IB 83-03-09 S
552.00 H
CA Pipexx Thermal sleeve removal and nozzle i
piping welds have become the critical path items.
i I
i.
l 1
1, 1
i I
2 3
4 F: Forced Reamn:
Mettual.
Exhibit C Instructions S: Scheduled A liguipment Failure (Explain) 1 Manual for Preparation of D. a Il Maintenance of Test 2 M.mual Scram.
lintry Sheets for I.icensee 1 Automatic Sesam.
Event Report (i.ER) File INtlREG-C Refueling l
D Regulatory Restriction 4 Other (lixplain) 0161)
E Opeiator Training & License lixamination i
i F Adminisitative 5
i G.Opeiatinual Error (lixplain) -
Exhibit I Same Somee 19/77)
Il Other (lixplain)
- KET NO
- 50-369 McGuire 1 UNIT:
DATE: 4-15-83 NARRATIVE SmelARY Month: March, 1983 McGuire Unit 1 entered the month shutdown to continue work on the steam generator flow modifications. At midnight fiarch 8, the thermal sleeve removal and nozzle piping welds became the critical path work extending the outage length. Moisture separator and reheater, H.P. turbine, electrical generator, and ice condenser work also are in progress. The outage continued through the end of March.
MONTHLY REFUELING INFORMATION REQUEST 4
1.
Facility name:
McGuire Unit 1 2.
Scheduled next refueling shutdown:
December, 1983 3.
Scheduled restart following refueling:
February, 1984 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
N/A If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Comnittee regarding unreviewed safety questions?
N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting j
information:
N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
N/A 2
0 7.
Number of fuel assemblies (a) in the core:
(b) in the spent fuel pool:
220 l
8.
Present licensed fuel poolocapacity:
500 Size of requested or planned increase:
i 9.
Projected date of last refueling which can be accommodated by present
[
licensed capacity:
DUKE POWER COMPANY Date:
April 15, 1983 Name of
Contact:
J. A. Reavis Phone:
704-373-7567 i
L
,,w---,,
y,
,-..v..-.m.,
.4
.. - ~
~....
,-._.,..,-r-.cm--w
,m.4
,..-e,.
,r-.
OPERATING DATA REPORT DOCKET NO. 50-369 DATE 4-15-83 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567; OPERATING STATUS M Guire nit
- 1. Unit Name:
- N tes: Narneplate Rating
- 2. Reporting Period:
March 1, 1983 - March 31, 1983 (Gross Mwe) calculated as 170 1450.000 MVA x.90 power
- 3. Licensed Thermal Power QtWt):
factor per Page 111,
- 4. Nameplate Rating (Gross MWe):
1305*
1180 5.< Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
1180
- 8. If Changes Occur in Capacity Ratings litems Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted. lf Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr..to.Date Cumulative
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line NOT IN COMMERCIAL OPERATION
- 15. Urut Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 1
- 18. Net Electrical Energy Generated (MWH)
- 19. Urut Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor iUsing DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months tType. Date, and Duration of Each t:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Umts in Test Status : Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICALITY 5/83 INITIA L ELECTRICITY 6/83 COMMERCIAL OPERATION 3/84 (4,17 7 )
. -w aa w
=w
McGUIRE NUCLEAR STATION Operating Status Report 1.
Personnel Exposure For the month of February, 6 individuals exceeded 10 percent of their allowable annual radiation dose limit with the highest dose being 1.860 rem, which represents approximately 15.5% of that person's allowable annual limit.
2.
The total station liquid release contribution to whole body dose for February has been compared with the Technical Specifications annual value of 3 mrem; the total release for February was less than 10 percent.
The total station gaseous release contribution to any organ dose for February has been compared with the Technical Specifications annual value of 15 mrem; the total release for February was less than 10 percent of this limit..
I I
r McGUIRE NUCLEAR STATION Operating Status Report 1.
Personnel Exposure For the month of January, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2.
The total station liquid release contribution to whole body dose for January has been compared with the Technical Specifications annual value of 3 mrem; the total release for January was less than 10 percent.
The total station gaseous release contribution to any organ dose for January has been compared with the Technical Specifications annual value of 15 mrem; the total release for January was less than 10 percent of this limit.