ML20073F910

From kanterella
Jump to navigation Jump to search
Forwards LARs 246 & 223 to Licenses DPR-50 & DPR-16, Respectively,Revising License Conditions 2.C.9 & 2.C.(6), Respectively Re Revs to Long Range Planning Program(S).No TS Affected by Proposed Lars.Revised Programs Also Encl
ML20073F910
Person / Time
Site: Oyster Creek, Three Mile Island
Issue date: 09/26/1994
From: Long R
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20073F919 List:
References
C-94-2536, C000-94-2536, C311-94-2124, C321-94-2140, NUDOCS 9410030319
Download: ML20073F910 (4)


Text

y .

l GPU Nuclear Corporation l arsi pa , Jer<ey 07054 201-316-7000 TELEX 136-482 Writer's Direct Dial Number.

C000-94-2536 C311-94-2124 C321-94-2140 September 26, 1994 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR 50 Docket No. 50-289 License Amendment Request No. 246 Oyster Creek Nuclear Generating Station (0C)

Operating License.No. DPR-16 Docket No. 50-219 License Amendment Request No. 223 Revisions to the " Plan for the Long Range Planning Program (s)" for Integrated Schedules.

References:

1) OCNGS License Amendment No. 122, dated May 27, 1988 incorporating License Condition 2.C.(10) [now (6)].
2) THI-l License Amendment No. 140, dated May 27, 1988 incorporating License Condition 2.c.9.

Pursuant to 10 CFR 50.90, GPU Nuclear Corporation (GPUN), operator of the Three Mile Island Nuclear Station and Oyster Creek Nuclear Generating Station requests a change to each plant's Operating License. Also enclosed is one signed copy of the Certificate of Service for this request which confirms service to the senior official of the townships in which the facilities are located.

By References 1 and 2 above, the NRC-approved license conditions added an Integrated Schedule Plan for both the TMI-I and OC facility operating licenses. The " Plan for the Long Range Planning Program" (the Plan) was also approved; and, changes to the Plan must be submitted for NRC approval and issuance of a subsequent license amendment to reflect the date of the revised Pl an. The proposed license amendments serve: to revise the Plan by changing the semi-annual reporting period to annual, and to reflect refined evaluation criteria and assessment methodology; and, to incorporate the necessary changes to the license condition wording. No Technical Specifications are affected by the proposed license ~ amendments.

9410030319 94o926 pn nuaceosoog9 g[

GPU Nuclear Corporation is a subsidiary of General Puohc UtSties Corporation  ;

j s

  • C000-94-2536 ,

C311-94-2124  !

0321-94-2140  !

This change request has been reviewed in accordance with Section 6 of the l TMI-l and OC Technical Specifications. Using the standards in 10 CFR 50.92 we  !

.. have concluded that these proposed changes do not constitute a significant t hazards consideration, as described in the enclosed analysis performed in accordance with 10 CFR 50.91(a)(1); and, we have provided a copy of this  ;

letter, the proposed change, and our analyses to the designated  ;

representative (s) of the Commonwealth of Pennsylvania and the State of New i Jersey - Department of Environmental Protection, as required by 10 CFR i 50.91(b)(1).

If you should have any questions concerning the enclosures, please contact Mr.

Michael W. Laggart, Manager Corporate Nuclear Licensing at (201) 316-7968.  ;

Very truly yours,  !

/I fl R. L. Long  !

Vice President and Director Services

Enclosures:

(1) TMI-1 Facility Operating License Amendment Request No. 246 (2) OCNGS Facility Operating License Amendment Request No. 223 (3) Plan For The Long Range Planning Program For TMI-I (4) Plan For The Long Range Planning Program For OCNGS (5) Certificates of Service I

i l

i i

m _

cc: Mr. William T. Russell, Administrator Region I Mr. J. Stolz Director, Project Directorate I-4  ;

Mr. Alex Dromerick, Jr.

OC Project Manager Mr. Ronald Hernan ,

TMI-1 Project Manager NRC Senior Resident Inspector Oyster Creek NRC Senior Resident Inspector TM1-1 Mr. D. LeHew, Chairman Board of Supervisors of Londonderry Township Mr. R. Barkanic, Director t PA. Dept. of Environmental Resources Mr. R. Sheaffer, Chairman Board of County Commissioners of Dauphin County The Honorable T. J. Hutler, Mayor Lacey Township, New Jersey Mr. K. Tosch, Chief Bureau of Nuclear Engineering NJ Department of Environmental Protection l

I l

____A

w e a e

4

  • ENCLOSURE 1 i

i 1

I l

l I