Interim Deficiency Rept DER 82-51 Re Pullman-Kellogg Pipe Lining Failure in Essential Cooling Water Sys.Initially Reported on 820910.Final Rept Delayed Until 830426 Due to Extensive Investigation & Evaluation
ML20073F821
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/05/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-23426-RQT, DER-82-51, NUDOCS 8304150548
Download: ML20073F821 (2)


Text

_

Docket Nos. 50-528/529/530 tMEr&(O.5Q.55 e) Report Inc Arizona Public Service Company n

PHOENIX. ARl20NA 8303[] /"pq P o. Box 21666.

o i# PT April 5, 1983l 3 'pI ANPP-23426-RQT/BSK.

- 11ECiD;wy U. S. Nuclear Regulatory Commission Region V l

Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 l

Attention: Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Time Extension For Report - DER 82-51 A 50.55(e) Potentially Reportable Deficiency Relating to Pullman-Kellogg Pipe Lining Failure In Unit 1 Essential Cooling Water System i

File: 83-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between J. Eckhardt and G. Duckworth on September 10, 1982 (B) ANPP-21973, dated October 8, 1982 (Interim Report) i (C) ANPP-22433, dated December 1, 1982 (Time Extension) j (D) ANPP-22823, dated January 26,1983 (Time Extension) 1

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference 1

(A), an Interim Report was transmitted by Reference (B), and a Time Extension was requested by Reference (C) and Reference (D). At that f

time, it was estimated that a Final Report would be available by April 5, 1983.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by April 26, 1983, when a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

l Very truly y urs, k

u O L U._

^A E. E. Van Brunt, Jr.

APS Vice President, Nuclear Projects Management ANPP Project Director i

j EEVBJr/RQT:db cc: See Attached Page 2 0304150548 830405 PDR ADOCK 05000528 g

PDR

o U. S. Nuclear Regulatory Commission ANPP-23426-RQT/BSK Page 2 cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

G. C. Andognini J. R. Bynum J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees P. P. Klute/D. D. Green A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli Institute of Nuclear Power Operations Records Center 1100 Circle 75 Parkway Suite 1500 Atlanta, Georgia 30339

- --