ML20073F602
| ML20073F602 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 04/04/1983 |
| From: | Peterson D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | |
| Shared Package | |
| ML20073F573 | List: |
| References | |
| NUDOCS 8304150511 | |
| Download: ML20073F602 (3) | |
Text
_ _ _ _
1
,i OPERATING DATA REPORT DOCKET No 50-255 DATE h_h_R1 3
COMPLETED BY DAPeterson TELEPHONE (6161764-8913 j
OPERATING STATUS Notes 1.
Unit Name:
Palisades 2.
Reporting Period:
630301-d30331 3.
Licensed Thermal Power (MWt):
2520 4.
Nameplate Rating (Gross MWe):
811,7 5.
Design Electrical Rating (Net MWe):
80s 6.
Maximum Dependable Capacity (Gross MWe):
- 675 J
7.
Maximum Dependable Capacity (Net MWe):
- 635 8.
If Changes Occur in Capacity Ratings (Items Number 3 Throusti 7) Since Last Report, 3
Give Reasons:
9.
Power Level To Which Restricted, If Any (Net MWe):
10.
Reasons For Restrictions, If Any:
This Month Yr-to-Date Cumulative i
11.
Hours In Reporting Period 74h 2160 98,895 l
12.
Number of Hours Reactor Was Critical 7h4 21h1.1 56,064.1 i
13.
Reactor Reserve Shutdown Hours 14.
Hours Generator On-Line Thh 2128.9 53,123.8 1
15.
Unit Reserve Shutdown Hours 16.
Gross Thermal Energy Generated (MWH) 1.862.568 5.280.216 107.917.008 17.
Gross Electrical Energy Generated (MWH) 588.330 1.672.760
_33.hh2.680 18.
Net Electrical Energy Generated (MWH) 558.767 1.588.701 31.hh6.757 19.
Unit Service Factor 100 98.6 100 98.6 53.7 20.
Unit Availability Factor 53.7 21.
Unit Capacity Factor (Using MDC Net) 118.3 115.8 50.1 22.
Unit Capacity Factor (Using DER Net) 93.3 91.h 39.5 1
23.
Unit Forced Outage Rate 0
1.h 33.6 24.
Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each):
I i
25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
l i
26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved u
INITIAL CRITICALITY l
INITIAL ELECTRICITY COMMERCIAL OPERATION i
8304150511 830404 PENT ADOCK 05K)DO255 R
PENT
- Based on condenser backpressure, rp0882-0032a-93
AVERAGE DAILY UNIT POWER LEVEL i
DOCKET NO. 50_255 Palisades UNIT DATE h_h_81 CONIPLETED BY DAPeterson _
TELEP110NE (616176h_8913 N!ONTl!
W A lor 3 I
DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL I
(Ntwe Net)
(stwe-Net)
I 762 752 17 2
7852 ISI 18 3
74R 19 755 4
749 764 o
752 752 5
2, 753 Th6 6
T51 7
7h1 23 I57 754 S
24 750 758 9
,3 10 M
752 26 704 7gg 11
,~,
754 3,
's 753
~
759 I3 754 29 75b 752 14 30 T54 3 '-
3:
753 763 16 INSTRUCTIONS l
On this fornial. list the aserage daily unit power laelin stwe. Set for caeh da) in the repornn; month. Compute to l
the nearest whole nxpwatt, l
l (9/77) l J
- e
[
SUfGIARY OF OPERATING EXPERIENCE FOR THE MONTH OF MARCH 1983 The Plant ran at essentially 100 percent rated power the entire month of i
f J