Rev 2 to Final Deficiency Rept DER 81-22 Re Premature time-out Condition W/Agastat Pneumatic Timing Relays. Initially Reported on 810715.Series 7,000 Relays Mfg 810715- 820112 Replaced.Also Reportable Per Part 21
ML20073F458
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/04/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
REF-PT21-83 10CFR-050.55E, 10CFR-50.55E, ANPP-23919-BSK, DER-81-22, NUDOCS 8304150489
Download: ML20073F458 (26)


Text

.

Docket No. 50-528/529/530 l

... *'s iS05,5(,e) Report g

r Arizona Public Service Company, l,f r9,

e o eax 2m. PHOENIX, AR12ONA 85036 - - 1.

_7 c

i April 4,I[983',.._

ANPP-23419-BSK/RQT U. S. Nuclear Regulatory Commission l

Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. D. M. Sternberg, Chief

-i Reactor Projects Branch 1

Subject:

Final Report, Revision 2 - DER 81-22 A 50.55(e) Reportable Condition Relating to Premature Time-Out Condition with AGASTAT Pneumatic Timing Relays File: 83-019-026; D.4.33.2

Reference:

A) Telephone Conversation between J. Eckhardt and J. Cook on July 15, 1981 B) ANPP-18632 dated August 11, 1981 (Interim Report)

C) ANPP-19231 dated October 21, 1981 (Final Report)

D) ANPP-20408 dated March 12, 1982 (Time Extension for Revised Report)

E) ANPP-20913 dated May 7, 1982 (Time Extension for Revised Report)

F) ANPP-21432 dated July 20, 1982 (Final Report Revision 1)

Dear Sir:

Attached is Revision 2 of the subject Deficiency Evaluation Report under 10CFR50.55(e). This revision clarifies the corrective action statement-regarding method of testing for defective relays, and provides_the manufacture date of relays to be returned to supplier.

Very truly y rW

)

Qc L O LLk I E. E. Van Brunt, Jr.

APS Vice President, Nuclear Projects l

'ANPP Project Director I

l EEVB/RQT:wp Enclosure j

cc: See Attached Page Two l

l 8304150489 830404 PDR ADOCK 05000528 1

0 PDR

t.

1

. l U.'S. Nuclear Regulatory Commission Page Two ANPP-23419-BsK/RQT cc: Richard DeYoung, Di ector Office of Inspection and Enforcemrat U. S. Nuclear Regulatory Commission Washington, D. C. 20555-T. C. Woods, Jr.

C. C. Andognini J.' A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan

~

- W.~ E. Ide J. Vorees J. R. Bynum D. D. Green P. P. Klute A. C. Gehr W. J. Stubblefield

)

W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant j

D. R. Hawkinson L. E. Vorderbrueggen q

G. A. Fiorelli i

k i

k n

6 e.,.,

e-,-..

,,e.

1

,-n n,,.,, - -,.

,..aw-,-y-,,revn.,

---v-,..

,,n 4

r.,

r FINAL REPORT REVISION 2 - DER 81-22 DEFICIENCY EVALUATION 50.55(e)

ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNITS 1, 2 & 3

1. Description of Deficiency The following Class IE equipment is impacted by defects existing in AGASTAT relays manufactured by Control Products Division, Amerace Corporation:

4.16KV Switchgear AC Panels Load Centers DC Load Centers Motor Control Centers Aux. Relay Cabinets a.

Control Products Division, Amerace Corporation notified Bechtel Power Corporation that the AGASTA't 7000 Series date coded 7740 through 7840 (1977 40th week through 1978 40th week) had diaphragm contamination on a small percentage of the total production due to use of unfil-tered shop air at one of the blow off stations which was used only for peak manufacturing periods. Compressor lubricant, a silicon contaminant, on the diaphragm coupler causes the diaphragm to leak resulting in a premature time-out :ondition.

Amerace Corporation by reference (g) has indicated that a contami-nated coupler which has sat unused for a long period of time will exhibit the following traits when functioned on a bench test.

  • The initial time delay would be lower than the set time delay.
  • The next time delay would be significantly shorter than the first.
  • The third time delay would be significantly shorter' than the second.

b.

On February 2, 1982, the Control Products Division, Amerace Corporation informed the U.S. Nuclear Regulatory Commission that approximately 20 percent of their AGASTAT E-7000 Series time-delay relays manufactured during the period between July 15, 1981 to January 12, 1982 may not operate properly.

Quality Assurance tests performed to ascertain acceptable performance over extended time periods have determined that the pneumatic timing diaphragm manufactured by one of two diaphragm suppliers exhibited a bleed-out of a fluid substance as a function of time and temperature.

This substance may affect the diaphragm seal on the relays operated at high temperatures for extended periods, resulting in shorter time delays than those set on the relay dial. Although the temperature required to initiate significant bleed-out would not be encountered in the majority of these relay applications, it is within the range j

of nuclear safety qualification tests required by IEEE-323 and IEEE-344.

r-z FINAL REPORT REVISION 2 - DER 81-22 Page Two In s letter dated February 2, 1982, the Control Products Division of Anerace Corporation requested users to return all of the discussed relays for inspection and possible replacements.

c.

On May 30, 1960, General Electric, Electric Ut.ility Sales Division, informed Bechtel Power Corporation that Control Products Division of Amerace corporation requested return of selected AGASTAT 7000 Series and E-7000 Series time delay relays installed in GE motor control centers as identified by Reference (d). Amerace Corporation had identified a " staked sub-assembly which exhibits looseness after several hundred thousand operations at a rapid cycle rate," and as a precaution requesed these be returned for possible repair or replacement.

II. Analysis of Safety Implication Conditions (a) and (b) have separately been evaluated as reportable under both 10CFR50.55(e) and 10CFR Part 21.

Condition (c) is evaluated as not reportable, as documented by the Amerace Corporation testing results given in Reference (i).

This report summarizes all conditions requiring replace ment AGASTAT relays for overall project control purposes, since there is overlap of impacted equipment.

If left uncorrected, conditions (a) and (b) could possibly preclude safety related equipment from performing per design intent.

III. Corrective Action a.

As listed on the Attachment, the 7000 Series AGASTAT relays will be tested and replaced as required during normal start-up activities.

All Class IE installations found defective will be replaced with qualified relays. Nonconformance reports have been initiated to document removal, testing, and replacement, as applicable.

b.

As indicated by the 10CFR Part 21 notification and IE Information Notice No. 82-04, the applicable electrical panels will be inspected for existence of the E-7000 Series relay. All E-7000 Series AGASTAT relays manufactured between 7/15/81 and 1/12/82 will be returned to the manufacturer for inspection and possible replacement. Non-conformance reports will be initiated as applicable to document removal and reinstallation of these relays.

The relays identified by Reference (d) will be removed from the GE c.

motor control centers and returned to GE as requested. Nonconfor-mance reports will be initiated as required to document removal and reinstallation of these relays.

FINAL REPORT REVISION 2 - DER 81-22 Page Three

REFERENCES:

(a) Bechtel Quality Assurance Bulletin 80-15. Rev. 2 (b) Bechtel Quality Assurance Bulletin 82-04,.Rev. 0 (c) IE Information Notice No. 82-04, March 10, 1982 (d) GE Letter, L. R. Fickel to Bechtel (J. Torres P.O. File EM-018),

May 30, 1980 (e)

IOM-E-8348, W. G. Bingham to W. J. Stubblefield, October 14, 1980 (f) 10M-E-8647, W. G. Bingham to W. J. Stubblefield, February. 25, 1981 (g) Amerace Corp. to Bechtel (R. L. Rogers, File S023-703-F), March 5,1981 (h) GE Letter, E. L. Phillip to Bechtel (W. Bingham File EM-019, 021)

April 30, 1982 (i) Amerace Corporation to Bechtel (M. Torikian), June 2, 1982 9

i i

l f

i F

yw,,

c,-,-

-w

-w y-w

--- 3 v--

- -, - -~.- -

v-y e

,- +-

.....-...-..--.w.......-

=..

ATTACEMENT TO DER 81-22 List of Nonconformance Reports Identifying Series 7000 Agastat Relays.

NONCONFORMANCE QUALITY REPORT NO.

CLASS UNIT LOCATION ELE V.

QTY.

EJ-1864 9

2 Control Bldg.

140' 1

2 EJ-1857 9

1 Control Bldg.

100' 45 EJ-1856 Q

2 Control Bldg.

100' 5

EJ-1852 Q

3 Warehouse "C" 2

EJ-1851 Q

3 Warehouse "C" 6

EJ-1839 Q

1 Control Bldg.

100' 1

EA-1838 Q

1 Aux. Bldg.

1 EG-1836 Q

1 Diesel Gen.

10 ET-1865 R

3 Turbine Bldg.

100' 1

ET-1862 R

1 Turbine / Aux. Bldg.

16 EY-1861 R

1 Turbine / Aux. Bldg.

17 EA-1863 R

2 Aux. Bldg.

120' 2

ET-1860 R

1 Aux./Turb./ Bldg.

14

^

ET-1859 R

2 Aux./Turb./Radwaste 16 ET-1858 R

2 Turbine Bldg.

100/140' 5

EY-1555 R

1 Cooling Towers 5

ET-1854 R

1 Turbine Bldg.

100' 4

ER-1853 R

3 Warehouse "C" 1

EJ-1850 R

2 Warehouse "C" 1

EY-1849 R

2 13.8 Switcher-Yard 6

EA-1842 R

1 Aux. Bldg.

120' 2

EY-1841 R

3 13.8 Switcher-Yard 8

EJ-1840 R

1 Control Bldg.

140' 5

EY-1837 R

1 13.8 Switcher-Yard 2

ET-1835 R

1 Turbine Bldg.

1 SE-0127 Q

1 Control Bldg.

100' 15 SE-0351 Q

1 Control Bldg.

25 SE-0245 R

1 Turbine Bldg.

1 SE-0246 R

1 Turbine Bldg.

1 SE-0247 R

1 Turbine Bldg.

1 SE-0248 R

1 Turbine Bldg.

1 SE-0243 Q

1 Control Bldg.

1 SE-0619 R

1 Turbine Bldg.

1 i

SE-0620 R

1 Turbine Bldg.

I s'

~ -.

8015( R:v. 2 T,

OUA L..Y ASSUR ANCE Eutt

. no.

BULLETIN 1

1

,,An ^",U,Ms.

,,.C-or 1.CUBJECT Agastat 7000 Series Pneumatic Timing Relays

2. D ESCRIPTION This Bulletin is a supplement to Bulletin 80-15. Rev.1. issued August 6,.1980.

j Procurement Supplier Quality has detemined that all Agastat Model 7000 Timing Relays date coded 7740 through 7840 are suspect. These relays could malfunction due to i

supplier use of unfiltered shop air (oil in line) during assembly.

3. REFERENCE DOCUMENTS Supplier Quality Infonnation Bulletin 80-5, Rev.1 (Attachment 1)

'[NNY& 3 NcIYa1o $erde

[o$siteQA S

1.

Determine if Agastat 7000 series pneumatic timing relays are installed on equipment delivered to the jobsite.

If installed, review code dates to determine if suspect units (code 7740 through 7840) were received.

Initiate action for suspect relays received.

2.

Provide results of investigation to Problem Investigation Comittee Chairman (A.G. Coutoumanos). Scheduled response date: by December 22. 1980.

Other LAPD Projects This Bulletin is for infonnation and action as appropriate to project requirements.

ACTION BY:

O ENGINEERING O rROCuREuENT O CONETRUCTION

@ QUALITY ASSUR ANCE

5. CORRECTIVE ACTION / FOLLOW-UP VERIFICATION PROJECT c ATE-APPROVED BY:
6. PREPAR ATION AN A T RI

~

R.

. Fatterson,

.o oS AUTHORIZED BY PRErARED DY:

November 17,1980 November 17, 1980 o ATE:

D ATE:

7. DIST RIBU TIO N : HOLDEns Or sULLETIN M ANU ALS oTNER:

T. G. Greer R. E. Weber F. I. Henry J. M.-Boeckerman W. A. Homer J. Bouma B. L. Lex J. E. Bashore J. Gensler P. Dragolovich H. F. McCluskey D. Vinson W. V. Coane F. J. Duddy S. M. Cott H. D. Townsend r

f. m ' )

(

WFEREf E h

g QUALITY ASSURANCE 82-04 suarT N NO.

DW BULLETIN rebruary 9. 1982 I

2 enN ONv'sNu LIMITED DISTRIBU'llON pagg or 1.CUBJECT Agastat Series E7000 Pneumatic Timing Relays

2. DESCRIPTION Control Products (Amerace Corporation) has detennined that E7000 series relays

~

manufactured between the 24th week of 1981 and the third week of 1982 may malfunction due to defective diaphragms. When the relays are operated at high temperature for extended periods, a diaphragm bleed-out (fluid) may occur, resulting in shorter time delays than those set on the dial. The supplier has notified NRC pursuant to 10 CFR 21.

The attached supplier letter requests Bechtel (Panel Shop direct procurement) to return suspect relays for inspection and possible replacement.

Continued...

I 3. REFERENCE D"CUMENTS Iontrol Products Letter Dated February 2,1982 (Attachment 1) l

4. PROPOSED ACTION TO BE T AKEN

-Manager - Bechtel Panel Shop b

1. Arrange for return of Agastat relays identified in Attachment 1 to supplier.

Project Managers - SONGS 2 & 3 and Palo Verde Projects Regulation 10 CFR 21 requires the supplier to notify purchasers of subject relays.

In turn, these purchasers should pass the notification to tneir customers so that the end item user is notified. Bechtel experience indicates that a breakdown in the notification chain may occur, and projects may not be notified by BPC suppliers.

1. Determine if Agastat E7000 series relays date coded 8124 through 8152 and 8201 through 8203 are applicable to equipment received af ter June,1981 or replacement relays installed as a result of previous DER's.

Continued ACTION SY:

O cuoinscaino O raocuarutar O coastauction O ouxtirY assunance

5. CORRECTIVE ACTION / FOLLOW.UP VERIFIC ATION d

I f

8 APPROVED BY:

PaoJtcT o,Tc._

/

r j

6. PREPAR ATION 1 A,U AT_IO N 5

r dg'C/ 4 4 ft p

- ~ -

R.L. Patterson outouma os AuTHOai2ED BY:

PaEPAnED BY February 9.1982 February 9,1982 onyt.

o,7 c; YGNeutzig M. Delaplain J.M. Amaral F.J. Duddy PQAE's W.H. Wilson H.J. Grothe J.M. Curran H.D. Townsend J. Cou.

J.J.

rtko W.V. Coane T.G. Greer QA Div. Hgrs.

K. Stwertnik C.D.g995 S.M. Cott QA Managers / Project H.F. McCluskev

.o..n..,..

C3NTINU ATI2N CHEET g

( ALITY ASSURANCE

[.ETINNO.

  1. ~ ~ ~ ~

82-04

/

aw BULLETIN rebru ry 9. 1982

..TE 2

2

,ot t"M.U$=

uMITrD DISTRIBUTION Pact or 2.

DESCRIPTION Note: Similar Agastat Relay problems were identified on SONGS 2 & 3 DER 70, Palo Verde DER 81-22 and LAPD-QA Bulletin 80-15. Agastat relays date coded 7740 through 7840 (1977 40th week through 1978 40th week) had diaphragm contamination due to use of unfiltered shop air during supplier assembly.

Additionally, SONGS 2 & 3 DER 79 identified conditions where relay dials set at 5 seconds had deley times ranging from 1.97 to 12.94 seconds.

4.

PROPOSED ACTION TO BE TAKEN Actionees Provide results of investigation and action taken, if action is required, to Problem Investigation Comittee Chaiman, A.G. Coutoumanos.

Scheduled response date:

by March 26, 1982.

Other LAPD Projects This Bulletin is for information and/or action as appropriate to project requirements.

I 6

Y h

LAO 0875 3 etes

  • e

-, -~-

-s mumm m.

?%

__t APR 2 31981 p.,,.

< ~>

1 s

g 4

smccer )

i I

i 3

S.W.W.3. D J

is sSINS no.: s835 l

8 I

Is a I 8

5 Accession No.:

MAR 12 i.T2 2 P I E I$

jj j

g 8202040107 o

?

d$$ E E E hEl N

ll j

p c:

4 UNITED STATES

.EAY IfJggg j

pg

- NUCLEAR REGULATORY COMMISSION 0FFICE OF' INSPECTION AND ENFORCEMENT l

7 M*Y WASHINGTON, D.C.

20555 l

t Marth 10, 1982 1

1 IE INFORMATION NOTICE NO. 82-04:

POTENTIAL DEFICIENCY-OF CERTAIN AGASTAT E-7000 j

SERIES TINE-DELAY, RELAYS ~

i l

Description of Circumstances:

On February 2, 1982, the Control product Division. Amerace Corporation informed 4

the U.S. Nuclear Regulatory Commission that approximately 20 percent of their AGASTAT E-7000 Series time-delay relays manufactured during the period between July 15, 1981 to January 12, 1982 may not operate properly.

1 l

Quality Assurance tests performed to ascertain acceptable performance over ex-tended time periods have determined that the pneumatic timing diaphragm manu-factured by one of two diaphragm suppliers exhibited a bleed-out of a fluid substance as a function of time and temperature. This substance may affect the diaphragm seal on the relays operated at high temperatures for extended periods, resulting in shorter time delays than those set on the relay dial. Although the l

temperature required to initiate significant bleed-out would not be encountered

)

in the majority of these relay applications, it is within the range of nuclear

]

safety qualification tests required by IEEE-323 and IEEE-344.

In a letter dated February 2, 1982, the Control Products Division of Amerace Corporation requested users to return all of the discussed relays for inspection and possible replacements. Copies of the letter and a list of the users are 1

enclosed.The Control Products Division r:: cords do not identify individual nuclear power plants because most shipments were mht'e to nuclear steam supply 4

i system (NSSS) suppliers, vendors, panel manufacturers, arcilitects and engineers and utilities.

j This infomation notice is provided as an early notification of a potentially significant matter.

It is expected that recipients will review the infor-j mation for possible applicability to their facilities and take appropriate action as necessary. No specific action or response is required at this time.

If you have any questions regarding this matter, please contact the Regional Administrator of the appropriate NRC Regional Office.

li

)

Attachments:

1.

List of customers to whom applicable relays were shipped.

2.

Recently issued IE Infomation Notices i

I M

d i

1


m%...----.--_..',__,

(

\\

r

-l :.

(

( Rereasucc QC)

GENER AL h ELECTRIC

.t.cy,1c un ury O

SAL,8 DIVISION GENERAL ELECTRIC COMPANY,9350 E. FLAIR DR., EL MONTE CALIFORNIA 91734 gg Pm;HAsRG El l

Phone: C:13)

MAILING ADDRESS. P.O.80X 2830. TERMINAL ANNEX, LOS ANGELES, '.

4 JOS IDC7 b'5 h s

s May 30, 198 q

reos rex as;s-essi r;.-

'~

i p

Q PP31th0 v

I cc sinutinos P

Da g0 s,7,;-

costisc~ w,v f;-

Bechtel Power Corporation aw r-ar P.O. Box 60860 Terminal Annex

p. ge

.sne, g en.. {,

Q,, (

Los Angeles, California 90060

)

M F

g Attention: Joe Torres A. Nh p

Bldg. 46

,A gr v

'I NrJGI Re: Palo Verde g*

.--* fd M 1 4

Motor Control Centers PO 10407-13-DI-018 Defective Agastat Relays 1

Gentlemen:

We have been notified by the manufacturer of Agastat relays, Control i

Products Division of Amerace Corporation, of a " staked sub-assembly which l

exhibits looseness after several hundred thousand operations at a rapid cycle rate."

As a precaution, Amerace Corporation has requested the return of certain Agastat relays for analysis, possible repair or replacement at no charge. Please check the shipments on the attached list of motor control centers for relays that may have the serial numbers listed.

(These shipments were made between February and March 31, 1980).

Very truly yours, V

L.R. Fickel Sales Engineer Y

e LRT:bjr 1

Attachment O

v

?

(

(

4/14/80 Agastat Location Check Class

_Model Serial i item h GE Catalog i Unit.

kn1E F7012AD 80043489 IV A-W-NUN-M24-- 423X311M24 AR3 Mon 1E

F7012AD 80050952 A-V-NUN-M3615 423X311M6q AFI-A-W-NUN-M3617 423X311M7Q HF1 A-V-NUN-M3606 - 423X31!M9Q KF3 IE E7022AF 80064195 %

dC 1-E-PHA-M3532 432X956M20 AR1 80064196

\\

1-E-PFA-M3533 432X956M20 AR2 80064197

\\

1-E-PHA-M3534 432X956M20 AR3 I

80064198 1-E-PHA-M3531 432X956M20 BR3 80064199 l6 1-E-PHA-M3530 432X956M20 DR1 80064200

}

4F 80043455 1-E-PHB-M3828 432X956H14 AR1 i

80043456 1-E-PHB-M3825 432X956H14 BR1 80043457 1-E-PHB-M3826 432X956H14 BR2 80043458 1-E-PHB-M3827 432X956M14 BR3 80043459 1-E-PHB-M3823 432X956H15 DR3 80043460

/

SA 1-E-PHA-M3114 432X956M02 DR1 80043461 58 1-E-PHB-M3212 432X956M04 DF2 s

80043462 j 17K Parts Qty. 6 443X016M07 80043463 17L Parts Qty. 6 443X016M08 lj 80043464 4D 1-E-PHA-M36 432X956M11 DR2 t

80043465 1

1-E-PHA-M36--

432X956H12 BF2 80043466

(

80043467

\\

80043468

\\

80043469

]

80043470

/

1 8

e se 9

V e

Q i

^

e--

(

R ' e K e J c '?-- l e )

Bechta PowcrCorporation Interoffice Memorandum V

To W. J. Stubblefield fig No.

E.6.01 s a,.ct ANPP Job 10407 E-8348 MOC 127391 om.

Defective Agastat Relays E

From W. C. Bingham of Engineering caem to W. H. Wilson At LAPD En t.

539 R. R. Stiens J. Aguilar M. Torikian J. Robinson (F)

J. Schuh D. Soteropoulos C. Kopchinski K. Kreutziger All w/ encl.

Reference:

(A)

GE Letter, L. R. Fickel to J. Torres, May 30, 1980 (B)

Q.A. Bulletin, 80-15, June 2, 1980 Per reference (A) please check motor control centers for suspe.cted Agastat 7012AD relays and return them to CE, Phoenix representative.

Also please check Class IE equipment listed below for possible defective Agastat relays of the serial numbers indicated on reference (A) or date coded 7745 and 7812 per reference (B), and report to us by November 3, 1980.

_ Class IE Equipment P.O. Number 4.16 kV Switchgear 13-EM-009 Load Center 13-EM-017 Motor Control Centers 13-EM-018 (other than those listed in Ref. A)

AC & DC Panels 13-EM-020 DC Load Centes 13-EM-021 Aux. Relay Cabinets 13-EM-022 e

We are currently compiling a list of other equipment where Agastat relays might be used and will submit it to you.

l M

WGB:SV:fd W. G. Bingham

Enclosure:

Q.A.Bulletin 80-15, June 2, 1980 (4 pages, I copy) 1 LAO-get$ l STANDARD) 3 9/74

' ' ~

. \\

/}.

c

(

\\

Bechtel Pc( er Corporation

/

Interoffice Memorandum REFEWE Fele No.

EM-018 To W. J. Stubblefield 10M-E-8647 MOC 139148 sobi.ci ANPP Job 10407 D**

February 25, 1981 From W. G. Bingham W

Engineering Ent.

coom to W. H. Wilson A'

LAFD 539 R. R. Stiens J. Aguilar G. Kopchinski K. Kreutziger All w/ encl.

Ref:

(A) IOM W. G. Bingham to W. J. Stubblefield, October 14, 1980 (B)

Q.A.Bulletin 80-15 Rev. 2, November 17, 1980 (C)

G.E. letter, L.R. Pickel to J. Torres, May 30,1980 Amerace Corporation has identified a premature time-out condition with Agastat Model 7012D Timers or a "Stal :d sub-assembly which exhibits looseness after several hundred tnausand operations at rapid cycle rate", per reference (C).

O Your response to reference (A), requesting identification of equipment where possible defective relays are found and your corrective action is required by March 6, 1981.

Please note that in QA Bulletin, Rev. 2, the code of suspected r

units changed to 7740 through 7840.

Please add Class IE Diesel Generator Control Cabinets P.O. No.

13-MM-018 to the list of equipment in reference (A).

k W. G. Bingham WGB:VMT:kab

Enclosure:

QA Bulletin 80-15, Rev. 2, Nov.17,1980 (3 pages, 1 copy) 9 O

lao-esos ist Areo Astol s tits

Cua n e.eL N.CDM.e & DuvabO8*

' N.t '== %

i

,.. AA'( nr.CE COOO3 ATION. 2330 VOUxHALL COAD r

' u!.'oa.- avtw Jt asrY 070e3 (201 9

'00

]

/ 4 A M"*

l'a r ::h 5, 19E1 g3 ErGYdM8z:sf-wavbn <.<g

~

I'M 10 '81 f Ik.c ;:

a Bechtel Power Corperation T.O.

Box 60860

' ' M W' l

y "T *'

Terminal Annex

',DgC l--f-h Los Ange'les, California 90060 Att: 3. L. Rogers, Pro,.,ect Engineer

,( 50 6 ats iI :

ppm, i Los Angeles Power Division

, em; e r. t I'-'

~

l FRO.* I [

l t

Subject:

Southern California Edison Company

___Ip_y's:

l _j,l_

San Onofre Nuclear Generating Station, Uni trJLP3 a ^ L" >

J '_

Bechtel Job 10079

_19 8 " C 8 C_

Premature Timeout Problem on 7000 Series Aga+1hEU'U^

-l:

C'M'

' L_

Time Delay Relays File: S023-703-F

$ ',,.-M

! l-

~ Ln p.* 5

i Re:

Your Letter February 18,.1981 Log BX-6232

.- i. n..

1-l-

r. t.

(1) Report on Premature Timeout Problem on 7000 Series Agastat Time Delay Relays Gentlemen:

In Paragraph 4 of your -letter you asked that we review our responsibility for providing the information required in 10CFR50 Se c tion 21. 21(b )( 3 )(VI ).

We feel that there is no responsibility on our part to pro.-

vide this information, because the product which you have purchased is our standard commercial grade time delay relay, sold through many channels of distribution.

In April, 1979 Control Products Divi-sion placed on the market our E7000 series, which conforms to 10CTR50, and is manufactured 'inder that quality program, which also includes 10CTR21 covering traceability.

Those products are sold only on a direct beJis, and are identified with our 7000 series having the pre-fix letter "E"

and suffix "001" (Example E7012AD001).

In summary, the units that you have in questions were not subject to any NRC regulations at the time they were purchased.

Reference the Paragraph entitled " Background" We feel that the explanation and description of the problem is not correct, and that it would be advantageous for us to give you Control Product's correct background, as related to the problem.

This is as follows:

E In the latter'part of 1978, we received a few units back from the field that exhibited premature time-out.

Upon investigation it wi

/

1

-=._

AGASTAT' BUCHANAN

  • ENERCON' r? *T-
  • T 3_

'~1. n. e r ~ ~ x~,

a. -r.:,,-- n.-.,- --

- - u a,

< ~

~=

. =.

.We cMcDower7erporcWTea - t T@T5tmECGTJ vuw me, TK c-upler ().l cer discovered that t4ere was e contaminant on

.. e disphref=

(relay diaphrago does not crack) which caused the diaphrages to 1eek resulting in pre =ature time-out.

The contaminant was found to be silicon, which in turn was traced to an. unfiltered air line used to blow off parts.

Compressor lubricant in the air line was the source of the silicon.

Fortunately this particular blow-off station was used only.

during peak manufacturing periods.

The overall number of units pass-ing through this station was small in relation to totn1 uni ts prod'uced,'

olthough in a given batch of parts conta=ination could appear on a high percentage in that batch.

The following corrective action was taken:

1 - The written manuf acturing instructions have been re_yised to call out " Filtered Air Only" for blow-off operations.

2 - An ultra-sonic cleaning operation has been added to the manufactur-ing procedure.

3 - A visual. inspection has been added to check for the presence of contaminants.

The period during which " suspect" units were produced was 1,

October 1077 to 1, October 1978.

We use the word " suspect" in the totalunitsproducedduringthisperiodwer([h cense that very few of the contaminated.

contaminated coupler and has sat unused for a If a unit has a long period of time (which would be the case for any units appearing now ) it would exhibit the following traits:

The initial time delay would be lower than the set time delay.

The next time delay would be significantly shorter than the first.

The third time delay would be significantly shorter than the second.

p C#

If a unit operates satisf actorily for several operation, it does not have a contaminated coupler.

Control Products recommends the use of our "E"

series ti m e r's 3

and relays when application calls for Class 1E certification.

g Enclosed are copies of our:

{

33 L*.

E7012/E7022

(}$

E7014/E7024 EGP, ETR and g2 EHL series IS.

M1 Yt Nd

___..._~.. -._ m m.

W..T. :.Y:

c'Bechtel Po?er Corporation - continued E s T'K IU#!'

(

These Product Documents will provide you uith the p e r f o r= t= r. : e characteristics, when tested to Control Products Qualifiestion Prog-h,'

Our Qualification Reports, E1000 and E2000, are also evailable.

ram.

If there are any further questions, please do not beritate in contacting me.

=

P.e g a r d s,

~

.JA.

Q

~-

Jcceph Tonini Sr. Product Manager JT/ie Enc. E 7012/E7022, E7014/E7024, EGP, ETR and EML Product Docu=ents cc:

D.P. Alexander, Dan Bucci, Mel' Martin S

e o

-m 4

e' C

b 4

i Mi 3-r$-

a

+-.:..._,.;.,_,

- - ~ ~ ' ~ - -...

1

{ Trerace-h

' ~ '

G E N i R A L,, ~, E L E C T R I C so craic uriury b

*t=

oivision O

GENERAL ELECTRIC COMPANY,9350 E. FLAIR DR., EL MONTE. CALIFORNIA 91734 Phone: (213) 572-5200 MAILING ADDRESS: P.O. BOX 2830.TERMIN AL ANNEX, LoS ANGELES, CALtF. 90051 April 30,1982 g

4 & K9:

\\@

n s J( />

N H7 NI Bechtel Power Corporation P.O. Box 60860 g je-1, Terminal Annex Los Angeles, CA 90060 Attn:

W. G. Bingham Subj: ANPP P.O. EM-018 & EM-021 Agastat 7000 Relays Gentlemen:

O In reference to your ietters cf 3-30-82, i have ettached a copy of your Mr. C. L. Wetherby's letter of 3-30-82 to your Mr. J. V. Carlson of San Francisco.

to contact Mr. M. Q. Martin of Amerace four site personnel is As the correspondence indicates 414/377-0800) when N ggg-agastat are found in the date code band of concern and he will

.}

advise return procedures and address for re-inspection.

f Very truly yours, p,,,

i ympm

'b

/--710b

.n w E. L. Phillippi

-@7 Customer Service Specialist

- l" '

n cc: w/attchmts.

M_nc ih R. C. Roessler - GPC, Mebane, NC c'5 W. Bridges

- I&SE, Phoenix, AZ T$*

C. L. Wetherby - GPC, Mebane, NC q.. w (

D. Sigmon

- GPC, Mebne NC

-4 R. Shaw

- EUSD, Phoenix, AZ nem P. Rinne

- I&SE, Phoenix, AZ w-gg' L. R. Fickel

- Office 7J_mu O

GENER AL h ELECTRIC asusRat PURPOSE

~

CONTROL CENERAL ELECTRIC COMPANY. P.O. SOX 480. WCBANE. NO'RTH CAROLINA 27302 DEPARTMENT Phone (919) $43-s561 March 30, 1982 Mr. John V. Carlson Bechtel Power Corporation P. O. Box 3965 San Francisco, CA 94119

Dear Mr. Carlson:

Subject:

NRC Information Notice No. 82-04, Agastat E-7000 Series Time Delay Relays Attached is a letter written to Mr. M. Q. Martin of Amerace on this subject. A copy of this letter was sent to your company at the site address Indicated. The locations listed are suspected to be of the serial range identified by Agastat.

Each unit IIsted should be checked to determine If the serial number listed by Amerace Is present. When items are found to be in the date code band, your personnel should contact Mr.

M. Q. Martin of Amerace Corporation at (414) 377-0800,'who will provide shipping procedure and address for return to Amerace for inspection.

Sincerely,

t. L. Wetherby J

Manager - Quality Control

/k1 Attachments

v-(

j i

l QUESTIONAIRf AGASTAT E-7000 SERIES TIME DELAY RELAYS 1.

Has your firm shipped any equipment involving the suspect relays to Bechtel projects?

YES If so, please provide the following information:

Bechtel P.O. No.,

Ship Date Relay Serial Was Customer Notified (If

~

Item / Tag No.

No.(s) so provide copy) 13-10407-EM018, 3/21/81 See Attached List YES Item 18 13-10407-E021 12/31/81

~

13-10407-E018-234 1/29/82 2.

Has your firm, as a sub-tier supplier, shipped any equipment with the suspect l

relays to a prfme supplier who may be furnishing the equipment to a Bechtel project?

fj0 If so, please provide the following information:

1 Customer &

Customer P.O. No.,

Ship Relay Serial Was Customer Address Item / Tag No.

Date No.(s)

Notified (If so

,jg provide copy)

(

4 3.- Have all suspect relays received by you and not yet shipped to a customer been returned to Amerace Corporation YES f

Your Fire General Electric Company Signed J

Date-N 36 8982-Please return to:

~

Eechtel Power Corporation P. O. Bor. 3935 San Francisco, CA 94119 Atta: John V. Carlson 4

PSQD Special Projects Mgr.

W

.=

.-e

+4

.e e

v

(

(

GENER AL h ELECTRIC aEwERat PURPOSE CONTROL l

CENERAL ELECTRIC COMPANY. P.O. BOX 489. WEBANE. NORTH CAROLINA 27302 DEPARTMENT Phone (019) 563-5561 February 12, 19 82 i

Mr. M. Q. Martin Manager - Quality Assurance Amerace Corporation Control Products Division 1000 Hickory Street Grafton, WI 53024

Dear Mr. Martin:

SUBJECT:

Recall of Model E7000 Relays As a result of your letter of February 2,1982, we have identified Nuclear IE (Class Q) orders on which your subject device may have been shipped.

Enclosed is a listing of these orders and contact addresses to reach our customers who may have these relays. You should coordinate directly with these sites, as General Electric will not bear any expense as a result of this recall. A courtesy copy of this letter has been mailed to each.

Only IE (Class Q) requisitions were Identified as traceability records are not maintained on non-1E equipment (Class R). Eight relays on purchase orders A683M671230, 675148, 751216, and 768T80 are Class R.

It is highly likely these are also at Palo Verde. These could have been shipped on purchase order 10407-13-EM-18 item 157A (2) and purchase order F-134994 (3) - Arizona Public Service Company purchase order. Two relays were still in our shop. They were returned and have been re-received at Nebane. They are model E7022AF, Ser. 81260380, on purchase order A683M659142, and model E7012AC, Ser. 81373342, on purchase order A683M719175. The balance have been shipped to customers in equipment or as/ parts and should be in the equipment listed.

Enclosed is a copy of your listing so noted.

Request you advise the undersigned when all relays have been returned and dispositioned.

r 3' L. Wetherby C.

Manager - Quallt Control

/k1 Enclosure ec:

C. Wetter, GPC - Bloomington

8. Snell, GPC - Hebane Florida Power t, Light o..k..I#A,t,nne p..h]Ie e.cule.
'. ' ', 1 * -

{

.e AGASTAT TIME-DELAY RELAY RECALL PROGRAM N 24 - 1981 TO N 03 - 1982 i

CLASS Q CUSTOMERS CENERAL ELECTRIC COMPANY t

GENERAL PURPOSE CONTROL DEPARTMENT MEBANE, N.C.

27302 1

Custome r:

florida Power & Light Company j

St. Lucie Plant - Unit No. 2 j

P. O. Box 1117 Jensen Beach, FL 33457 j

Attention: Project Quality Construction Supervisor Equipment:

Four (4) pre-wired relay panels with (13) E7012AD timers -

l GE part number 272A5509QCP4Q i

Florida Power s Light Company P.O. No.: NY422568, item 1 GE Requisition No.: 300-92264-6 GE Shop Orde r No. : 475X795M01 l

I Customer:

Bechtel Power Corporation / Arizona Pubtle Service P. O. Box 49 I

Palo Verde, AZ 85343 Attention: Field Procurement, Jim Crotwell Bechtel Purchase Order No. : 10407-13-EM-018, item 18 l

GE Requis it ion No. : 480-55032-98 GE Shop Order No. : 473X943M06 4

Equipment: Design change package - (2) E7022AF, GE part nun 6er 272A5509QCP1Q For: Unit M3726 - Unit I and Unit 2 2

4 Bechtel Purchase Order:

13-10407-E018-234 GE Requisition No.: 480-55032 l

GE Shop Order: 443X015M--

GE Bechtel l

Ship Unit GE Part Agastat Unit MCC No.

Item Location Re fe rence Model No. Qty.

Ref.

Device

-15A-E-PHA-M31 M02 DRI 272A5509QCP2Q E7022AF 1

M3114 62 M04 DR2 1

M3212 62 Mik DRI 272A5509QCPlQ E7022AF 1

M3825 62 MIS DR3 1

M3823 62 r

t i

l

.=

w..

f.

~

AG STAT TIME-DELAY RELAY

,ALL PROGRAM GENERAL ELECTRIC COMPANY - MEBANE, N.C.

PAGE 2

/

Bechtel Purchase Order:

13-10407-E021 GE Requisition No.: 480-55240 CE Shop Order: 436X0552M--

GE 8echtel Ship Unit GE Part Agastat Unit MCC No.

Item Location Re fe rence Mode 1 No. Qty.

Ref.

Device 3EPKA-M41 M43 IAI 296A2150ASplQ E7022PC 2

M4101 62, 62-1 M44 182 296A2150ASPlQ E7022PC 1

M4110 62 M44 1C2 1

M4111 62 M44 102 1

M4112 62 M45 IE2 1

M4113 62 M45 IF2 1

M4115 62 M45 IG4 i

M4116 62 M46 IH3 H

1 M4117 62 3EPKB-M42 M47 2Al 296A2150 ASP 1Q E7022PC 2

M4201 62, 62-1 3EPKB-M43 M50 3Al 296A2150ASPlQ E7022PC 2

M4301 62, 62-1 M51 382 1

M4312 62 M51 3C2 a

1 M4313 62 M51 302 1

M4314 62 M52 3E2 1

M4315 62 M52 3F4 1

M4316 62 3EPKD-M44 M53 4A1 296A2150ASPlQ E7022PC 2

M4401 62, 62-1 M54 482 1

M4415 62 M54 4C2 1

M4416 62 M54 402 1

M4417 62 C. L. Wetherby 2/12/82 r

i I

..Yfy).... 2 *.) Y ) *y '. 3 J ).'.) y 1.').. y).:. J. ' ) * ). '.Y. )., ). y y 3..' ).

)

2..yf) *

.f..) *y.) > y:

V) y CI,

,,,, l

. ".1

  • 1.2

. -lv 'L L:.1.:.t! t t.".v:2.r. : *L.-.". ?.? =.:.t.' *: ' *:...L'.:!.. > -..t.: n %..."* ". '., I.

.: ':'.:...". ~..~.*.?..w

~. -.... - - -. -.

...~....

l.

n': : ~.= c.:7. *: : : r. *

  • 3~"1.'~ = * *. ~ ~~.~. *. 7. '"~ ~;.. ;. :.~. '* c.: *. -~ T*~. c.' <.

.4 + ~w.< <

C c: **: *< -': ' < *" < < < *'" < " < < ': < ". * * ~ *. *: 't *;*1: * * * <<'

    • ' l.
~ ' :c?.:s'
) l a

. :.

  • 1.:..'.s.U 2._12?.:.!.;.f.:?..,1 U u t.U. M.*.2.".t *H.
  • 1'2 ts 1 T :!.Tr..r ;:.:P * ?. ?..:,0 L.: r:D u.w..

r.u :. :t.e. :._2 cin

-..........-..g..-.

g,.

,- I I

t

~l

~

bb' b

  • 4-L* J-*5-4-*'

^

  • h'*** -b*-*bbbbbb' #-*b*-bbbbb' '*b " ~~~bk 4-b t.u.- li byyyy.) *yyy y yy Vy.)') *yy yyyy.yy V Yy yyyyyy y )*y yy)

Y yyyyy) t wI Dl

.r': lC?.L: %~ :.U U:nrLU::*11.E.UDtu: *:r2 EL" 22 ::?32 ?:f !2:22 :::::*.LL::.:: *:

i

'*r ~

~o

t f ;

1 J

?_.A.I J 1 J l J J ! ! J J.J !.J 1 fJ J.J ?J J JJ f J : tJJ J

3. LLLJ t=- l

.3: tr.:s tt.U LD w 1 Y U.,.;;2 D L'1.U.*T2L"3.*.!3L; traillu.i U ! 17.H11 *:.U. U.11 T.1)

'l 222!

.tJ C:

' 1,1J f l 1J L.lJJ-.!J.J J ' !.JJJ.J !J ! f.1.f.J 1 f 1 l.J 2l tu J f

't 4

w I,c..:<<<<<.<..<:<<<<<<<<<.c<<<**.<<<./<<<<<<<<<< @ : < < u. s*

..--L.~~~~..~.~~...~.~.~.....~~,...

. -. ~ ~.

.. ~.,....

e

., l.

,,.,,, _.. ~,..,,,.

f*Iy u.*.?.* t T U ".J_:2.?l.a D.*~11.:.:. *! 'lL*J'.1T. "2H??r...tT f.i.:2.tl ui! * *.*. *:' *E..t.:..t.'.'.Z ;L '.1*H.L.' 'T t.Y 217 V2

- -.. -. -..- -.~..-

~.-...... ~

~

~

r.

I.

3 l tirs.:::nai:;;tu:ui.utti.ulsDtt a ut r:ruunu:.t* :. :r:.21. ::.:* Tar:r :.u.t*tr:2 ::-.:v "u t?n

>= l Ui*.'*3 000 *.'.*;O OD Oly.*.'O 00 *3 00000 00 0 'J000000 0":0 03 0 7 ;O0000

~

Hl 3

>3 C J '- 7.' CN-rr s -.N OC N eva.*.fNNNNvv v v v vJW v' W.*:' ate Av Jf.tSt?LS %

0 0 Jl 3ir.N r\\NNf:

(NN*NNNN N NNtNNN(NN*'Jc:NNr\\?4N"JNTNN?;"N-itr 1".mviv c;.; ;

  • .* 8 g i A T '.Jr0 T'<3: DI'.CV O'P I C O M O C'U D T. II A 7JO I TOT O 00 0 T:D 00.O '" O t e

0 c31

+

      • t

...g

'.'J B C -c.".-*.r O==

.% T

  • 1CA g C ::: C C C C C CNr".v.ite % fr t' C

~6.*.-* Ac% :c0' C

'J m '*mT. C4m

.I l
I
  • *:' ~ T : D' "' * *. '*/'.:

!**.<~'t

, ~ % % '~ %

-r*r ~ m.'r v'e:~;*ve c'C ~

  • y l
lr

.m -Tc: c.

C, - -- - -

r' r w

~J

-'-~. - T e -

-v v.* **" n " s".cU -' "r*)

' O C C C C C T' N "%'.d"O O C 0 0.p 0*' 00 C ^ C C T* O" ~ "" C' P*'. % r

.~. I "

.C

.g e

-C 1 I

J c cce cT'O v**T

.0 0: I rJN a%NN r\\at' *.m NNrem mterar*: rara.-

,*r..* mra-*-)ra ave.rar y q me

' - 5:.va c:: I

' tf I.

- - - ~. - -. -

tM 1 *:D0 "3COUD :DOJI:DDL':M.00r30: O D 7: r O.C D 2:*0 3'** **.,

.J T 1r00==

hI l

s 6

e p

~g tial; e

q,g

-e

~- -

. r- - e. e e r o nc n

e. e - -

m e.em-,.

nne

. '= :

sy

,wn. %

r.f w w,s x.

wCs.

O x x ;m r.

.. ',r : 's r

-.m,

,. 1

,, I ~

. =

  • v U *.J l t

i llsna tu t e.

l e

Jt i

e

.4 we g

UI

,d le t

l 8

'f a

"") l

.D 1e i

I f

I I

d

=3 HI 1

g e

O

<t?

I i

i e

i.

g I

4

  • W l

g 4 '

as

/

g e

f h

8

!i E

l f.l.1 8

l e

9g 3

s g

I W.

g LIJ l 3

8 N Tf'.

g I

l.*.*L LL*L Ll ::1.* )~':C333UU*300QU gy y :.r:1J: g l

.C.1. :< < < <<<<< <<1" 11.'.?.1ci.n.'yyyyyy y.yy,yyyy y,y y *.

a c.1 1:..:.1.; la.fa.,,n,<.c i-. :.c:.c<.::

,1 N tN"JN NRENNNNNNN NtNNNNrNNNT:.NNhr.raNr4Ncy 4 Hl l J l

4(N

N P.Cs N (\\N,J - -NN (N.N N N Nr\\."\\N(LN *;rs; C\\*NNesty.NNN. Nog a ymegngq c

y rg;.g P'l

Cc'O CCO CC OOCC C ~ O CCC C O C CCCC C..") c'.C

.% %.%%.% t=..%% %.%.%% % %% we.%.s.%; C O,C CC C%; %%.CC C7

.O, :rac,,,g,.

g t

C l,,

=.

e

,3. I 1.??U :T; 'lss:1"332.LLJ *D :JLu2 t22.tf.titt!:fM.L*,f.tl !' 1. :122 *:.t,1.Jgjy3 y :y gJ,g33 l t

s e

4

'w

,- q w i

.i w si i

e T

a-I S-.*

tu e

'at i

l 22 i

~.

l.

9880 fgg tu'f:- I 4detti 9

OI i dr-68 is a em e,

g l

A *

.P P;N,

4 f. 4

=f "f) t i

J J 8

l t

C"3?.':e n '

=

uuv 3

u%

_t* ;*;
-el.. 4N.NNN (*JN,N CC C,E l

CCC"~

c-=,c =uCC"CC aCCC OdCCCOOJt y: Try,C OCCC

==L:ch.c v.:n s, r e t-

m.

..-- - --N N

,:N ene r\\N :Nm.---..s.:s.,c c.:.c..c.c.,a,._r~ c w ce.,.~~. %% v r.,4,,m,.,--.

.,,--,e.,e,-

.~_...w=zc.

=.:

.;c. :..

x..

.:r u,

.v

.,e e,c

... n.-

..c

'..:.C.

3 < l '.:':',. 'c'T 's

':'? C. C 'TC"C.'-.1 t'.

@.~.: '. 'c.t s~ sc.=y,c,c c.=c &s.N.,,,. -.,r

..a.%

C

.-.,~.

w..+

-=

r -;

r. --

.c-

~...

...- C,

U3ir,

.~-c. w.-.r.v

.~i

-c.c.,,-

.-r..,c.c.r,w %m m:n 3

.
;u.::s.

.. = _.. -

~ =r :: u -.. = =x n ::

,. w,x

e.u.a.

.v.

c c c c c - : :e ec :.e c :..: e :. c :.,..ce cee,.:.: c.c a cace 3,v.:..,

30i po m 7 q m m

-..o:qm.7mp

.e.:.7.y ccc

<,.=_;

g.l 8

n

? COL I 840DL8 CTS Otvececed reace tone orwece4 som we.unnvsv

'T avrp.. wexcorewe. cau se ti t o.s7 7-or>o9

, s e m C 0-k J ura e 2,

1902 hchtol Power Corporatiern 11445 houth Lakewood Pt ivd.

D cr. in ey. CA 5'0 2 4 1 A t t ? n t.1 on :

Mr. Mike Torikdan Demar Mr. Torikgsmn:

On Merch 20 1980 we notifie.d General Electrio.

Mebano North Curolfnm. of a pomoible problem with a sub--

m ai ss embly in our 7000 scrime nuclear safety related relaye.

Thi a. problem was noticed durina our continuing ear tended pe r f o rm anic e tent program.

In a rapid eyol ar test, a core stop to p1mte stakin operation c amme loose after a few hundred thous.and loose [se c e m.

When the staking brenha ckot of noima, but still functions.

the relays make a T

worse case would be a continuously energized relay.

Theme might draw hi gh er r than normal current and eventually over-heat.

Most of the worst staking was eeught be' fore shipment, however some m aarginal assemblies may have gotten to the o

field.

Although the rapid cycle test is more severe than normal usag.a and the qualified life of nuclear series 1m 23 c y c L aa s, we r ee c oruu ande d that customer purchasin

" nu. 0 00 olear eenf e ty related" relays return them Zor core / late replercoment,== a pre cau tionary measure.

Of the 77 nuo ear r e lay as involved all but the 24, which G.E.

amys were sent to you, bavo been returned.

Since wo did not experience the failures in the type of t e ma ti n g done for nuclear qualification it was decided that NHC notification van not required.

  • f"hi s, judgement is now eau ppo r t e d by tho fact that since this potentini problem w e. n discovered in 1980 there have been no reports or field f ami lu rer s f rota this cause in either nuolerar or conventional product in es t all na tion s.

l l

g-f o.

QA32003 June 2,

1982 Pa3e 2 If, howevwr, th e res is any cons.arn on your part that one of' the relays you have from thim lot might result in a z untio:ra imilure that would causo a safety h e_z z a r d, we still will be huppy to repimeo aa ll the core /platess if you wi ll meno them to us at Grafton, bil.

Turn around timo will be no longor than 2 d.a y s..

If you have any further questione on this please call me.

Sincerely, CON L PRODUCTS DTVT5 ION A

l M.

Q.

nrtin Quality Amourance Manager t

MQ,M/ vf I

-